ID 1263
Source Type Borehole
Photos No. None
Inspecting Agency Federal Government of Somalia Ministry of Energy and Water Resources
New Inspecting Agency None
Inspection Date Sept. 16, 2019
Inspecting Person Mohamed Abdulkadir
District Cabudwaaq
Settlement Name Miirjicley
Settlement Distance 1.0
Establishing Agency International Organisation of Migration
New Establishing Agency None
Establishing Date May 10, 2015
Source Name Miirjicley Abudwaq
Geometry SRID=4326;POINT (46.36258226 5.9863924)
Latitude 5.9863925
Longitude 46.3625832
Sources Cluster 0
Water Source Photo No Photo
Water User Type Rural Urban
Permanent? Yes
Months Used None
Functioning? Yes
Non Function Date None
Non Function Reason None
No of Humans 50000
No of Camels 500
No of Cattle 50
No of Shoats 330000
Irrigation Area 0.0
Borehole Depth 138.0
Borehole SWL 15.0
Borehole Operating Yield 30.0
Borehole Operating Hours 14.0
Borehole Operating Drawn 1.0
Borehole Recovery Time 0.0
Reservoir Type Concrete/Masonry tank
Reservoir Capacity 74.0
Pipeline Type PVC
Pipeline Length 2000.0
HouseHold Connections 16666
Water Point Kiosks 2
Troughs 2
Source Emergency? Yes
No of Trucks 4
Truck Capacity 8.0
Pump Type No Pump
Pump Model None
Pump Capacity None
Pump Level None
Power Source None
Generator Type None
Generator Capacity None
Solar Type None
Solar Capacity None
Supply Condition good
Supply Condition Notes It's very good condition
Physical Water Issues no
Physical Problem Reason None
Temperature 29.0
pH 7.02
Electrical Conductivity 2720.0
Total Dissolved Solids 2205.0
Water Sample No No
Management Type Communal
WSC yes
WSC Established Date 2015-07-17
WSC Male 3
WSC Female 2
Watercharged Humans? yes
Cost Of Water Humans 0.01
Cost Of Water Humans Currency None
Watercharged Animals? no
Cost Of Water Animals None
Cost Of Water Animals Currency None
Intervention Agency International Organisation of Migration
New Intervention Agency None
Intervention Description Construction of solar Construction of wall Two store rooms
Intervention Date March 14, 2017
Current Intervention 1. Changing solar betry 3. Construction Huge Water tank
Second Date Intervention None
Proposed Intervention None
Additional Information None
Other Files No Document
History watersource.HistoricalWaterSource.None