ID 1296
Source Type Borehole
Photos No. None
Inspecting Agency Federal Government of Somalia Ministry of Energy and Water Resources
New Inspecting Agency None
Inspection Date Sept. 16, 2019
Inspecting Person Mohamed Abdulkadir
District Cadaado
Settlement Name Galinsoor
Settlement Distance 0.5
Establishing Agency Former Somali Government
New Establishing Agency None
Establishing Date Aug. 9, 1980
Source Name galinsoor 1
Geometry SRID=4326;POINT (46.70681552 6.42433848)
Latitude 6.42433834
Longitude 46.7068138
Sources Cluster 1
Water Source Photo No Photo
Water User Type Rural Urban
Permanent? Yes
Months Used None
Functioning? Yes
Non Function Date None
Non Function Reason None
No of Humans 12000
No of Camels 1500
No of Cattle 0
No of Shoats 1408000
Irrigation Area 0.0
Borehole Depth 200.0
Borehole SWL 40.0
Borehole Operating Yield 14.0
Borehole Operating Hours 20.0
Borehole Operating Drawn 15.0
Borehole Recovery Time None
Reservoir Type Concrete/Masonry tank
Reservoir Capacity 66.0
Pipeline Type PVC
Pipeline Length 1000.0
HouseHold Connections 2000
Water Point Kiosks 3
Troughs 2
Source Emergency? Yes
No of Trucks 9
Truck Capacity 13.0
Pump Type No Pump
Pump Model None
Pump Capacity None
Pump Level None
Power Source None
Generator Type None
Generator Capacity None
Solar Type None
Solar Capacity None
Supply Condition fair
Supply Condition Notes Shortage of tanks
Physical Water Issues no
Physical Problem Reason None
Temperature 27.5
pH 7.45
Electrical Conductivity 2593.0
Total Dissolved Solids 2135.0
Water Sample No No
Management Type Utility/Local Authority
WSC None
WSC Established Date None
WSC Male None
WSC Female None
Watercharged Humans? yes
Cost Of Water Humans 0.01
Cost Of Water Humans Currency None
Watercharged Animals? yes
Cost Of Water Animals None
Cost Of Water Animals Currency None
Intervention Agency International Committee of The Red Cross
New Intervention Agency None
Intervention Description Changing water point source because first well of galinsoor established by MoEwr is not functioning it needs rehabilitation
Intervention Date Aug. 16, 2015
Current Intervention 1. Construction anew source 2 former of borehole established by central government is needed Rehabilitation.
Second Date Intervention None
Proposed Intervention None
Additional Information None
Other Files No Document
History watersource.HistoricalWaterSource.None