ID 1494
Source Type Borehole
Photos No. None
Inspecting Agency Puntland Ministry of Energy Minerals and Water
New Inspecting Agency None
Inspection Date Aug. 17, 2019
Inspecting Person Team 1
District Iskushuban
Settlement Name Taageer
Settlement Distance 5.0
Establishing Agency United Nations Development Programme
New Establishing Agency None
Establishing Date April 9, 2006
Source Name Taageer
Geometry SRID=4326;POINT (50.9196779404562 10.9658215488224)
Latitude 10.9658213
Longitude 50.9196777
Sources Cluster None
Water Source Photo No Photo
Water User Type Rural
Permanent? Yes
Months Used None
Functioning? Yes
Non Function Date None
Non Function Reason None
No of Humans 6000
No of Camels 300
No of Cattle None
No of Shoats 2000
Irrigation Area 12.0
Borehole Depth 168.0
Borehole SWL None
Borehole Operating Yield 12.0
Borehole Operating Hours None
Borehole Operating Drawn None
Borehole Recovery Time None
Reservoir Type Concrete/Masonry tank
Reservoir Capacity 50.0
Pipeline Type Galvanised Steel
Pipeline Length 6000.0
HouseHold Connections 500
Water Point Kiosks 4
Troughs 2
Source Emergency? Yes
No of Trucks 12
Truck Capacity 8.0
Pump Type Submersible Pump
Pump Model Lowara11kw
Pump Capacity 12.0
Pump Level 160.0
Power Source Generator
Generator Type Perkin30
Generator Capacity 30.0
Solar Type None
Solar Capacity None
Supply Condition fair
Supply Condition Notes Need to change GI 2 class C Emergency
Physical Water Issues no
Physical Problem Reason None
Temperature 30.0
pH None
Electrical Conductivity 304.0
Total Dissolved Solids 153.0
Water Sample No No Document
Management Type Private-Public-Partnership
WSC None
WSC Established Date None
WSC Male None
WSC Female None
Watercharged Humans? yes
Cost Of Water Humans 0.026
Cost Of Water Humans Currency None
Watercharged Animals? yes
Cost Of Water Animals None
Cost Of Water Animals Currency None
Intervention Agency United Nations Children's Fund
New Intervention Agency None
Intervention Description Water system, Tank 50cbm,6000m pipeline, 4 kiosks
Intervention Date Sept. 14, 2008
Current Intervention Solar power, generator 30KVA, fencing, GI pipe Class C 2 inch 30 pcs, pump11kw.
Second Date Intervention None
Proposed Intervention None
Additional Information None
Other Files No Document
History watersource.HistoricalWaterSource.None