Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8323 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 31, 2022 | Galgaduud | cabudwaaq | laandheer | 0.0 | landheer | 31/03/2016 | landheer | — | 6.0900693 | 46.192594 | 346.0 | — | 0 | — | rural | yes | — | Yes | — | 4500 | 1000 | — | 18000 | — | — | 133.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 128.0 | 25 | 1 | 2 | yes | 5 | 10.0 | Submersible Pump | pump stopted function | — | 104.0 | Hybrid - Solar/Generator | Doutz | 32.0 | 300 | 12.0 | poor | the pump stoped | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
7351 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Qarqora | 0.4 | GSA | 07/11/2009 | Qarqora | — | 6.740379 | 47.7011535 | 274.0 | — | 0 | — | rural | yes | — | Yes | — | 15000 | 700 | — | 60000 | — | — | 240.0 | pvc | 10.0 | — | 18.0 | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 187.0 | 180 | 1 | 3 | yes | 6 | 9.0 | Submersible Pump | not specified | — | 138.0 | Hybrid - Solar/Generator | perkin | 30.0 | 300 | 24.0 | poor | — | no | — | 26.7 | 7.86 | 3760.0 | 1875.0 | — | — | — | — | — | — | yes | 0.0045 | yes | — | — | — | Agency not specified | store house | MFA | — | — | — |
7763 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 31, 2022 | Galgaduud | cabudwaaq | 1 luuliyo | 3.0 | community | 17/03/1977 | Roob da ay | — | 6.2470517 | 46.2194633 | 388.0 | — | 1 | — | urban rural | yes | — | Yes | — | 3000 | 150 | — | 34000 | — | — | 120.0 | pvc | 8.0 | — | 40.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 68.0 | 1800 | 5 | 2 | yes | 4 | 10.0 | Submersible Pump | franglin | — | 96.0 | Hybrid - Solar/Generator | perkin | 32.0 | 300 | 16.0 | poor | 1. small water tank 2. small pipelines | no | — | — | — | — | — | — | Communal | yes | — | 3 | 2 | yes | 0.0015 | — | — | — | — | — | pump and pipes | — | — | — | — |
8146 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 9, 2022 | Mudug | galkayo | Bandiradley | 0.8 | DIRECTAAID | 05/12/2018 | Mubarag | — | 6.4867771 | 46.9541353 | 316.0 | — | 0 | — | rural urban | yes | — | Yes | — | 1500 | — | 800 | 80000 | — | — | 172.0 | pvc | 9.0 | — | — | 13.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 68.0 | Galvanised Steel | 150.0 | 30 | 2 | 3 | yes | 20 | 14.0 | Submersible Pump | not specified | — | 130.0 | Hybrid - Solar/Generator | Doutz | 30.0 | 300 | 23.0 | poor | 1. the soil is rocky , and get pipelines to the HH. | no | — | 34.0 | 7.85 | 942.0 | 654.0 | — | Communal | — | — | — | — | — | — | — | — | — | — | IRC | solar and solar | — | 2020-03-08 | — | — |
7074 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 19, 2022 | Bari | qardho | Dangorayo | 1.0 | TASS | 18/01/2007 | Dangorayo borehole | — | 8.7252347 | 49.3311253 | 585.0 | — | 1 | — | rural urban | yes | — | No | 12/2/2022 the day stopped functioning. Main raising pipes requires changing. | 9600 | 2000 | 0 | 5000 | 1.0 | — | 412.0 | pvc | 8.0 | 210.0 | 12.0 | 9.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 100.0 | Galvanised Steel | 1000.0 | 1600 | 0 | 2 | yes | 5 | 9.0 | Submersible Pump | Lawara | — | 250.0 | Hybrid - Solar/Generator | Perkins | 60.0 | 300-72M | 27.0 | good | Pump conditionis is good, Condition of the pipelines are good. elevated water tank is intact. | no | — | — | — | — | — | — | Communal | yes | 01/01/2022 | 10 | 0 | yes | 0 | yes | — | — | — | NRC | 28/05/2021 | Replacement of main raising pipe. | Replacement of the main raising pipes. | — | — |
7439 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | Feb. 22, 2022 | Nugaal | eyl | Ciyocaddo | 0.3 | KAALO Relief and Development | 22/01/2017 | Ciyocado DW | — | 8.2704521 | 49.8270006 | 61.0 | — | 0 | — | rural urban | yes | — | Yes | — | 7000 | 2000 | — | 5000 | 0.0 | — | — | — | — | — | — | — | — | — | 6.0 | — | 2.5 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 500.0 | 500 | 4 | 3 | yes | 12 | 72.0 | Submersible Pump | Lowara | 1.4 | 4.0 | Hybrid - Solar/Generator | Kama | 0.22 | 300-72M | 5.0 | poor | Destroyed dug well | no | — | 30.1 | 7.1 | 1000.0 | 495.0 | — | Communal | yes | 22/01/2017 | 3 | 2 | yes | 0.1 | — | — | — | — | KAALO Relief and Development | 22/01/2018 | Construction of ground tank | 1. Drilling new dug well. 2. Rehabilitation of water supply extension. 3. Construction of new kiosks. 4. Construction of new elevated tank | — | — |
7213 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Bari | qardho | Dhudhub | 0.5 | Minstry of water and energy federal Republic of somalia | 28/02/2014 | Dhudhub borehole | — | 9.2356349 | 49.9205093 | 438.0 | — | 1 | — | rural urban | yes | — | Yes | — | 12000 | 4000 | — | 7000 | — | — | 410.0 | pvc | 8.0 | 140.0 | 10.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 4200.0 | — | 5 | 2 | yes | 5 | 9.0 | Submersible Pump | Lawara | — | 204.0 | Hybrid - Solar/Generator | Perkins | 50.0 | 300-72M | 29.4 | fair | The water demand of the dhudhub is very high. No sufficient water kiosks in the village | no | — | 38.5 | 7.2 | 3830.0 | 1910.0 | — | Communal | yes | 28/06/2015 | 5 | 2 | no | — | yes | — | — | — | Puntland MoEMW | 15/09/2021 | Replacement of main raising pipes. | 1: Water supply system which gives water to village. 2: Replacement of all distribution pipe lines. 3: Fencing. 4: Rehabilitation of elevated water tank in order to stop water leaking. | — | — |
7230 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 20, 2022 | Bari | qardho | Uuskure | 3.0 | SC-UK | 15/01/2019 | Uuskure borehole | — | 8.8064715 | 49.7419923 | 400.0 | — | 1 | — | rural urban | yes | — | Yes | — | 20000 | 5000 | — | 24000 | — | — | 330.0 | pvc | 8.0 | 240.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 430.0 | 4000 | 1 | 2 | yes | 7 | 9.0 | Submersible Pump | Lawara | — | 318.0 | Hybrid - Solar/Generator | Perkins | 65.0 | 300-72M | 25.5 | good | Main raising pipes are good Elevated water tank is good Pump is good Well casing is good. | no | — | 23.0 | 6.7 | 4100.0 | 2000.0 | — | Communal | yes | 24/01/2019 | 3 | 2 | yes | 0.025 | yes | — | — | — | Puntland MoEMW | 20/07/2021 | Replacement of main raising pipes | Construction of new elevated water tank Construction of another animal water troughs Increasing of solar panels Incentives of caretakers. | — | — |
7158 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 20, 2022 | Bari | qardho | Ceelbuh | 1.0 | — | 20/10/2015 | Ceelbuh borehole | — | 9.0910365 | 49.593264 | 466.0 | — | 1 | — | rural urban | yes | — | Yes | — | 24000 | 7000 | — | 70000 | — | — | 225.0 | pvc | 8.0 | 60.0 | 12.0 | 9.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 36.0 | Galvanised Steel | 600.0 | 6000 | 10 | 2 | yes | 6 | 45.0 | Submersible Pump | Lawara | — | 162.0 | Hybrid - Solar/Generator | Coelmo | 33.0 | 300-72M | 22.5 | good | The borehole is Good supply system Elevated water tank is good Water kiosks are good. | no | — | 33.0 | 6.0 | 4200.0 | 2280.0 | — | Communal | no | — | — | — | yes | 0.1 | yes | — | — | — | Community | 17/02/2022 | Replacement of generator Replacement of electric cable which acess to the generator. | Rehabilitation of solar panels and solar accessories equipment Rehabilitation of elevated water tank Construction of extra water trough Needs of fuel which acess to the generator. | — | — |
1671 | BHSNCR047 | Borehole | Somaliland_MoWRD | Oct. 21, 2019 | Sanaag | Ceerigaabo | Boodacade | 1.2 | IR - Islamic Relief | 17-04-16 | Bodacade Borehole | — | 9.8758 | 47.6748 | 1002.0 | 4.3 | 0 | 1571663921393.jpg | Urban | No | 8 | Yes | — | — | — | — | — | — | — | 250.0 | PVC | 8.0 | 117.0 | 13.0 | 12.0 | 1.0 | 0.2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 1100.0 | 0 | 1 | 3 | Yes | 12 | 6.0 | Submersible Pump | Lowara | 8.0 | 192.0 | Hybrid - Solar/Generator | Perkins | 65.0 | 300-72m | 300.0 | Fair | Not connection to the village | No | — | 28.4 | 7.5 | 589.0 | 341.0 | — | Utility/Local Authority | — | — | — | — | No | — | Yes | — | — | — | UNICEF - United Nations Children's Fund | Pipeline 1100m | 2019-08-16 | Connecting to the village kiosks replaced of pump and risen pipe | — | Strategic Water Sources Survey – WSS_NATl |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France