Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8018 | — | Borehole | Somaliland MoWRD | April 24, 2022 | Sanaag | laasqoray | Awboogays | 0.0 | NPA | 24/04/2004 | Awbogays | — | 9.5707757 | 47.7542262 | 819.0 | — | 0 | — | rural urban | yes | — | Yes | — | 1350 | 790 | 200 | 17000 | 0.0 | — | 140.0 | gi | 8.0 | — | 16.0 | 12.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 150.0 | 0 | 2 | 3 | yes | 8 | 10.0 | Submersible Pump | Luwara_11 | 40.0 | 120.0 | Generator | Parkin | 45.0 | — | — | good | Smoothly functioning borehole | no | — | 28.0 | 7.5 | 1600.0 | 1000.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 0 | 1. Replacement of pipes. 2.new solar pannel installation. | — | — |
8061 | — | Dug Well | Somaliland MoWRD | April 20, 2022 | Sanaag | ceerigaabo | Cerigabo | 4.0 | Community | 20/12/1987 | Shallow well daran guduudan. | — | 10.6523372 | 47.3745735 | 1797.0 | — | 1 | — | rural urban | yes | — | Yes | — | 500 | 50 | 200 | 400 | 5.0 | — | — | — | — | — | — | — | — | — | 28.0 | 10.0 | 10.0 | 12.0 | 2.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Other | 30.0 | Galvanised Steel | 100.0 | 400 | 1 | 1 | no | — | — | Submersible Pump | Luwera | 10.0 | 15.0 | Generator | Franklina | 18.0 | — | — | good | 1.Lack of water supply system. 2.Solar panels installation. 3.Pump | no | — | 25.0 | 8.0 | 1351.0 | 944.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | 0 | 1.Lack of water supply system. 2.Solar panels installation. 3.Pump | — | — |
8234 | — | Borehole | Somaliland MoWRD | April 21, 2022 | Sanaag | ceerigaabo | Yubbeh | 2.0 | UNICEF | 21/07/2010 | Yube borehle 1 | — | 10.7497129 | 47.9199759 | 1449.0 | — | 1 | — | rural urban | yes | — | No | 1. Solar switch shock | 1000 | 200 | 300 | 1500 | 0.5 | — | 94.0 | gi | 8.0 | 74.0 | 14.0 | 12.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 22.0 | PVC | 1.0 | 4500 | 2 | 4 | no | — | — | Submersible Pump | Luwera | 11.0 | 64.0 | Hybrid - Solar/Generator | Parkins. | 45.0 | Dusol | 1500.0 | poor | Poor water supply system condition. | no | — | 27.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 1 | 1.Solar switch electric shock Rehabilitation. | — | — |
8075 | — | Borehole | Somaliland MoWRD | April 18, 2022 | Sanaag | ceerigaabo | Ceerigabo | 1.0 | Somalia government | 18/04/1972 | Cerigabo WD3 | — | 10.6304185 | 47.36284 | 1785.0 | — | 1 | — | urban rural | yes | — | Yes | — | 2000 | 100 | 70 | 500 | 2.0 | — | 82.0 | gi | 8.0 | 70.0 | 20.0 | 12.0 | 15.0 | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Stainless Steel | 1000.0 | 1 | 1 | 1 | yes | 15 | 10.0 | Submersible Pump | Luwara | 20.0 | 25.0 | Hybrid - Solar/Generator | Parking | 45.0 | 0 | 0.0 | fair | 1. Poor water supply syatem | no | — | 25.0 | 7.1 | 1300.0 | 120.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 18/04/2022 | 1 | 1 | — | — |
8235 | — | Borehole | Somaliland MoWRD | April 18, 2022 | Sanaag | ceerigaabo | — | 1.0 | Islamic relief | 18/04/2014 | Cerigabo Bore hole 5 | — | 10.6279874 | 47.3711737 | 1757.0 | — | 1 | — | rural | yes | — | Yes | — | 350 | 200 | 200 | 400 | 1.5 | — | 72.0 | pvc | 8.0 | 25.0 | 15.0 | 12.0 | 20.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 1.0 | 1 | 3 | 2 | yes | 15 | 10.0 | Submersible Pump | Barking | 15.0 | 35.0 | Generator | 45 | 45.0 | — | — | good | 1. Good water supply system | no | — | 24.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 13/12/2017 | 1 | 1.solar panel installation. | — | — |
7943 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Cagaaran | — | Save the children | 13/02/2021 | Cagaraan BH | — | 7.0347377 | 47.4901695 | 284.0 | — | 2 | — | urban rural | yes | — | Yes | — | 700 | — | — | — | — | — | 180.0 | pvc | 8.0 | 95.0 | 25.0 | 12.0 | — | 1.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 2500.0 | — | 4 | 2 | yes | 7 | 8.0 | Submersible Pump | — | 11.0 | 160.0 | Hybrid - Solar/Generator | Parkins | 45.0 | PV800-4T30G | 30.0 | good | — | yes | Colorless and odorless | 35.2 | 8.05 | 2235.0 | 1115.0 | — | Communal | yes | 13/03/2021 | 3 | — | no | — | no | — | — | — | Save the children | 13/01/2021 | 1 . Installation of solar power | Fuel supporting. Rehabilitation pipelines | — | — |
7768 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 23, 2022 | Bari | iskushuban | Ufeyn | 18.0 | Former Somali Government | 01/01/1950 | Ufeyn Spring | — | 10.7305293 | 49.8045026 | 570.0 | — | 1 | — | rural urban | yes | — | Yes | — | 24000 | 4000 | — | 9000 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 80.0 | — | — | — | — | Concrete/Masonry tank | 320.0 | PVC | — | — | 1 | 1 | yes | 20 | 8.0 | No Pump | — | — | — | — | — | — | — | — | fair | 1.Pipe lines are rusted 2. Water Tanks are leaking 3.there is no enough kiosks and troughs. | no | — | 28.1 | 7.6 | 815.0 | 406.0 | — | Communal | yes | 20/01/2008 | 13 | 3 | yes | 0.001 | no | — | — | — | Puntland MoEMW | 01/06/2020 | 1. Rehabilitation of water tank | 1. 4km GI 3inch Pipes,14km 6inch PVC pipes and central Storage. 2. Large water Storage Tanks 3. Flooding protection mechanism for Pipelines 4.the town needs Pipeline system connected to each house hold. 5. Outside the town Troughs for animal. 6.specefic water tank for irrigation. 7. Warehouse for the accessories Storage. | — | — |
7215 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Horkac cagaaran | 1.3 | Community | 13/03/2017 | Horkac BH | — | 7.0533552 | 47.5178086 | 301.0 | — | 1 | — | urban rural | yes | — | Yes | — | 100 | 200 | — | 800 | 5.0 | — | 226.0 | pvc | 8.0 | — | 12.5 | 5.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 18.0 | Galvanised Steel | 500.0 | — | 1 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 135.0 | Generator | Parkins | 30.0 | — | — | fair | — | yes | Colorless and odorless | 31.5 | 7.91 | 2535.0 | 1257.0 | — | Communal | yes | 14/03/2017 | 3 | 0 | no | — | yes | — | — | — | World Bank | 13/02/2021 | 1. Construction of animal troughts 2. Construction of one koisk. 3. Rehabilitation of generator room 4. Installation of generator and pump. | 1. Installation of solar power. 2. Construction of new kiosks. 3. Construction caretaker room. | — | — |
7531 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Mudug | galkayo | Xarfo | — | UNICEF | 15/02/2021 | Xafro BH 4 | — | 7.3565719 | 47.615313 | 371.0 | — | 4 | — | urban | yes | — | Yes | — | 6300 | — | — | — | — | — | 220.0 | pvc | 8.0 | 140.0 | 14.0 | 10.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 300.0 | PVC | 2500.0 | 900 | 0 | 0 | no | — | — | Submersible Pump | Grandfoss | 15.0 | 180.0 | Generator | CEOLMO | 45.0 | — | — | good | — | yes | Colorless and odorless | 31.5 | 7.81 | 1800.0 | 895.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | no | — | — | — | UNICEF | 15/09/2021 | 1. Construction of elevated water tank | 1. Fancing. 2. Installation of solar power. 3. Fuel supporting. | — | — |
7244 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Community | 08/03/2018 | Mareegaale BH | — | 7.045631 | 47.0177575 | 346.0 | — | 11 | — | rural urban | yes | — | Yes | — | 2800 | 500 | 150 | 1500 | — | — | 250.0 | gi | 8.0 | — | 12.0 | 20.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 96.0 | PVC | 4000.0 | 360 | — | 3 | yes | 10 | 8.0 | Submersible Pump | Lowara | 15.0 | 160.0 | Hybrid - Solar/Generator | Parkins | 60.0 | PYD400MIK_36 | 22.4 | good | — | yes | Colorless and odorless | 33.7 | 7.67 | 1610.0 | 789.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | Community | 08/03/2020 | 1. Construction of elevated water tank | 1. Extension pipelines. 2.caretaker and Generator rooms construction. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France