Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7225 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Guuco | 0.5 | Community | 02/03/2011 | Guuco BH | — | 7.10234 | 47.9937396 | 261.0 | — | 1 | — | rural urban | yes | — | Yes | — | 2520 | 500 | — | 2000 | 0.0 | — | 243.0 | pvc | 8.0 | — | 22.0 | 10.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 144.0 | Galvanised Steel | 750.0 | — | 3 | 4 | yes | 1 | 6.0 | Submersible Pump | — | 11.0 | 138.0 | Generator | Parkins | 45.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.57 | 3720.0 | 1820.0 | — | Communal | yes | 02/03/2018 | 3 | 2 | yes | 0.05 | yes | — | — | — | CARE Somalia | 02/02/2022 | 1. Construction of new elevated tank | 1. Installation of solar power 2. Fuel supporting 3. Fancing. 4. Rehabilitation of animal thoughts 5. Operator support. | — | — |
8397 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 7, 2022 | Mudug | goldogob | Godgaashaan | — | — | 07/03/2019 | Godgaashaan BH | — | 6.978967 | 47.2497849 | 320.0 | — | 1 | — | rural urban | yes | — | No | A months ago, borehole needs observation of the problem stopped. | 1500 | 1200 | — | 1200 | 0.0 | — | 130.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 36.0 | Other | — | 150 | — | 2 | yes | — | — | Submersible Pump | — | 11.0 | — | Generator | Parkins | 30.0 | — | — | poor | Needs rehabilitation of supplies | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | — | — | — | — | NRC | 07/03/2021 | 1. Construction of new elevated tank | 1. Emergency 2. Observation of borehole 3. Construction of koisks 4. Construction of generator room and caretaker room | — | — |
7144 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Mudug | goldogob | Qansaxle | — | Community | 09/03/2016 | Qansaxle BH | — | 7.1188594 | 47.0943949 | 368.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3000 | 800 | 150 | 500 | 0.0 | — | 176.0 | pvc | 8.0 | — | 6.6 | 15.0 | — | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | PVC | 2000.0 | 70 | 4 | 3 | yes | 10 | 8.0 | Submersible Pump | Lowara | 15.0 | 170.0 | Hybrid - Solar/Generator | Parkins | 60.0 | YL365-36b | 23.36 | fair | Koisks of this supply needs strong rehabilitation | yes | Colorless and odorless | 32.8 | 7.3 | 1863.0 | 1240.0 | — | Communal | yes | 09/03/2016 | 4 | 0 | yes | 0.1 | yes | — | — | — | Agency not specified | 09/03/2018 | 1. Construction of new elevated tank | 1. Construction new animal throughts 2. Extension of pipelines 3. Rehabilitation of pump and riser pipes 4. Rehabilitation of generator. | — | — |
7974 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Bone | 1.3 | ICNA | 14/03/2019 | Bone BH | — | 7.3018054 | 47.5684045 | 362.0 | — | 1 | — | urban rural | yes | — | Yes | — | 3500 | 1000 | 200 | 8000 | — | — | 250.0 | pvc | 8.0 | 60.0 | 12.0 | 8.0 | — | 1.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 1350.0 | — | 2 | 3 | yes | 15 | 8.0 | Submersible Pump | — | 11.0 | 240.0 | Hybrid - Solar/Generator | Parkins | 45.0 | MS350M-73 | 18.2 | good | — | yes | Colorless and odorless | 35.6 | 7.6 | 1971.0 | 981.0 | — | Communal | yes | 14/03/2019 | 5 | 2 | no | — | no | — | — | — | NRC | 14/02/2021 | 1. Construction of new elevated tank | 1. Pump and riser pipes rehabilitation. 2. Fuel supporting. 3. Operator supporting. 4. Construction of new kiosks bone IDP. | — | — |
7888 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Heema | 0.3 | ADA | 14/03/2004 | Heema BH | — | 7.1430376 | 47.5313058 | 344.0 | — | 1 | — | urban | yes | — | Yes | — | 3100 | — | — | — | — | — | 180.0 | pvc | 8.0 | — | 16.0 | 14.0 | — | 2.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 130.0 | PVC | 1500.0 | 70 | 2 | 2 | no | — | — | Submersible Pump | — | 11.0 | 162.0 | Generator | Lesory somer | 45.0 | — | — | good | — | yes | Colorless and odorless | 31.8 | 7.85 | 2645.0 | 1318.0 | — | Communal | yes | 15/03/2012 | 3 | 2 | no | — | no | — | — | — | NRC | 14/02/2021 | 1. Construction of new elevated tank | 1. Installation of solar power. 2. Panels. 3. Extension of pipelines. 4. Rehabilitation of pump and riser pipes. | — | — |
7180 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 08/03/2004 | Goldogob water company BH 2 | — | 7.0297561 | 47.005359 | 346.0 | — | 11 | — | rural urban | yes | — | Yes | — | 42000 | — | — | — | 0.0 | — | 215.0 | pvc | 8.0 | 144.0 | 9.0 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 400.0 | PVC | 13344.0 | 2224 | 1 | 2 | yes | 15 | 10.0 | Submersible Pump | Lowara | 15.0 | 192.0 | Hybrid - Solar/Generator | Parkins | 60.0 | — | — | fair | — | yes | Colorless and odorless | 30.5 | 7.51 | 2950.0 | 1455.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | UNICEF | 08/01/2021 | 1. Construction of new elevated tank | 1. Installation of solar power | — | — |
8735 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 30, 2022 | Sool | las_caanood | Faleryaalle | 2.0 | — | 12/02/2022 | Faleeryaare BH | — | 8.5449126 | 48.0735031 | 488.0 | — | — | — | urban | no | — | No | This borehole is new, and infrastructure currently constructing | — | — | — | — | — | — | 120.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | PWDA | 12/03/2022 | 1. Construction of new elevated tank | 1. Extension of pipelines 2. Construction of koisks | — | — |
7193 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Mudug | galkayo | Beer dhagaxtuur | 0.7 | Private | 15/03/2019 | Dhagaxtuur BH | — | 7.4595648 | 47.4101372 | 409.0 | — | 1 | — | urban rural | yes | — | Yes | — | 4900 | 500 | — | 1200 | 0.0 | — | 340.0 | pvc | 8.0 | — | 11.0 | 12.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 1300.0 | 21 | 1 | 1 | yes | 4 | 8.0 | Submersible Pump | Lowara | 16.5 | 250.0 | Hybrid - Solar/Generator | Parkins | 45.0 | BR_M330W | 23.1 | fair | Poor of koisks and animal troughts | yes | Colorless and odorless | 28.6 | 7.72 | 1545.0 | 765.0 | — | Communal | yes | 15/03/2019 | 7 | 0 | yes | 0.05 | yes | — | — | — | NRC | 15/03/2021 | 1. Construction of new elevated tank 2. Construction of koisk. 3. Construction generator room. | 1. Construction of animal troughts 2. Construction of koisks 3. Extension pipelines. | — | — |
7227 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Daarasalaam | — | Community | 13/03/2002 | Daarasalaam BH | — | 7.0814702 | 47.4922321 | 315.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3500 | 450 | — | 1500 | 0.0 | — | 170.0 | pvc | 8.0 | 56.0 | 16.6 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1500.0 | 250 | 5 | 2 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 108.0 | Hybrid - Solar/Generator | Parkins | 45.0 | DS572380M | 16.72 | good | — | yes | Colorless and odorless | 32.6 | 7.71 | 2470.0 | 1225.0 | — | Communal | yes | 13/03/2002 | 3 | 0 | yes | 0.05 | yes | — | — | — | NRC | 13/02/2021 | 1. Construction of new elevated tank 2. Construction of koisks | 1. Extension pipelines 2. Extension of solar power | — | — |
8366 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Ceelgardi | 0.5 | — | 24/03/2019 | Ceelgardi BH 1 | — | 7.261886 | 47.572429 | 337.0 | — | 1 | — | urban rural | no | 4 | No | For a months, Unknown problem | 3000 | 600 | — | 1000 | 0.0 | — | 225.0 | pvc | 8.0 | — | 7.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 44.0 | Galvanised Steel | 40.0 | — | 5 | 2 | yes | 20 | 8.0 | Submersible Pump | Lowara | — | 11.0 | Hybrid - Solar/Generator | Parkins | 30.0 | — | 32.4 | fair | — | no | — | — | — | — | — | — | Communal | yes | 24/03/2019 | 7 | 4 | no | — | no | — | — | — | CARE Somalia | 24/03/2022 | 1. Construction of new elevated tank 2. Extension of pipelines 3. Construction of new kiosks 4. Rehabilitation of pump and riser pipes | 1. Construction of latrine. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France