Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
1670 BHSNCR046 Borehole Somaliland_MoWRD Oct. 20, 2019 Sanaag Ceerigaabo Arda village 9.0 IR - Islamic Relief 19-11-17 Arda Borehole 10.311 47.6695 1261.0 3.2 0 1571573140088.jpg Rural No 10 Yes 500 60 14000 0.5 146.0 PVC 8.0 144.0 45.0 10.0 5.0 0.15 Concrete/Masonry tank 45.0 Galvanised Steel 200.0 0 1 3 Yes 10 8.0 Submersible Pump Lowara 14.0 130.0 Hybrid - Solar/Generator Perkins 45.0 300-72m 300.0 Good All supply system is Good condition No 22.8 7.7 178.0 132.0 Utility/Local Authority No Yes Replaced pump and risen pipe 3" and fences animal trough and kiosk rehabilitation Strategic Water Sources Survey – WSS_NATl
7747 Borehole Galmudug Ministry of Energy and Water Resources March 30, 2022 Galgaduud cabudwaaq Balanballe 1.5 MOEWR-GS 30/03/2000 Canjiidle 5.7606873 45.7546187 347.0 0 urban rural yes Yes 18000 1000 80 78000 142.0 pvc 8.0 90.0 15.0 20.0 Concrete/Masonry tank 30.0 Galvanised Steel 95.0 900 2 3 yes 14 9.0 Submersible Pump granfos 114.0 Hybrid - Solar/Generator Doutz 36.0 300W 20.0 fair no 31.6 7.98 2202.0 1079.0 Communal yes 5 2 yes 0.004
7511 Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Galkacayo 1.2 UNHRC 06/03/2015 Salaama IDP 2 BH 6.8555099 47.4437124 268.0 20 urban yes Yes 31200 210.0 pvc 8.0 84.0 15.0 16.0 3.0 Concrete/Masonry tank 81.0 PVC 4200.0 9 2 no Submersible Pump Lowara 15.0 126.0 Hybrid - Solar/Generator Parkins 65.0 300_73M 22.5 fair This supply has generator problem, so needs rehabilitation of generator yes Colorless and odorless 29.5 7.8 3370.0 1667.0 Communal yes 06/03/2015 4 2 yes 0.05 no Agency not specified 06/03/2018 Construction of elevated water 1. Rehabilitation of pipelines 2. Rehabilitation of pump 3. Rehabilitation of generator ( Emergency).
369 BHBRQR036 Borehole Puntland_PWDA Nov. 19, 2019 Bari Qardho Ceelbuh 1.0 SSF - Somali Stability Fund 17-06-15 Ceelbuh 9.0911 49.5931 491.0 4.9 74160198207.jpg Rural Yes Yes 500 2000 225.0 10.0 Concrete/Masonry tank 40.0 Galvanised Steel 2500.0 1666 7 2 Yes 6 9.0 Submersible Pump Lowara11kW 10.0 162.0 Solar 300w 22.5 Good Good No 30.0 2700.0 1809.0 Communal 17-08-15 3 Yes 0.026 Yes NRC - Norwegian Refugee Council 1 room, 3 kiosks, extention pipeline to school, repairing some pipes. 2019-11-19 Pipe GI Class 2 inch 30pcs, generator 45kw. Pump 11KW with cable 250m, Strategic Water Sources Survey – WSS_NATl
352 BHBRQR020 Borehole Puntland_PWDA Nov. 9, 2019 Bari Qardho Sheerbi 2.0 IR - Islamic Relief Somalia 08-07-17 Sheerbi 9.8438 49.1073 848.0 4.7 73297599542.jpg Rural Yes Yes 400 1000 400.0 8.0 Concrete/Masonry tank 75.0 Galvanised Steel 300.0 1500 1 3 Yes 2 8.0 Submersible Pump Lowara 18.5 8.0 375.0 Hybrid - Solar/Generator Perkins 65 65.0 300w 22.5 Good Good No 30.0 2540.0 1276.0 Communal Yes 0.026 No NRC - Norwegian Refugee Council Replacement pipe iyo pump 2019-11-09 Rehabilitation Animal troughs, repairing tank. Strategic Water Sources Survey – WSS_NATl
366 BHBRQR033 Borehole Puntland_PWDA Nov. 19, 2019 Bari Qardho Jidada 0.2 Aquaterra 15-07-88 Jeded 9.4069 49.5872 591.0 4.9 74145171660.jpg Rural Yes Yes 2000 5000 210.0 6.0 Concrete/Masonry tank 30.0 Galvanised Steel 350.0 500 3 2 Yes 10 8.0 Submersible Pump Lowara 11kW 6.0 199.0 Hybrid - Solar/Generator Perkins 45 45.0 300w 12.0 Fair Need to rehabilitate No 30.0 2150.0 1440.0 Communal 16-08-94 7 2 Yes 0.026 Yes NRC - Norwegian Refugee Council Solar panels 2018-09-17 Pump11kw, GI pipe Class C 2 inch 35 pcs, solar 300w 15 pcs, rehabilitation pipeline. Strategic Water Sources Survey – WSS_NATl
7343 Borehole Puntland Ministry of Energy Minerals and Water March 31, 2022 Sool las_caanood Karin korfood 0.7 ISRC 31/03/2012 Karinkarfood BH 8.1271024 47.7510983 698.0 1 urban rural yes Yes 6300 1200 500 13000 0.0 290.0 pvc 8.0 4.0 12.0 8.0 Concrete/Masonry tank 50.0 Galvanised Steel 1000.0 15 2 3 yes 30 8.0 Submersible Pump Lowara 7.5 260.0 Hybrid - Solar/Generator Parkins 60.0 300w 18.0 fair yes Colorless and odorless 27.8 7.5 4850.0 2423.0 Communal yes 31/03/2014 6 3 yes 0.1 yes Drilling new borehole during to trucking much. 1. Rehabilitation of solar panels 2. Rehabilitation of animal troughts 3. Trucking point. 4. Construction of new elevated tank. 5. Rehabilitation of generator and caretaker rooms 7. Pipelines rehabilitation. 7. Fancing of borehole
7993 Borehole Galmudug Ministry of Energy and Water Resources April 10, 2022 Mudug galkayo bilaale 0.5 ICRC 09/02/2011 bitaale 2 6.7053621 47.8377885 229.0 0 rural yes Yes 1200 7800 3550 55000 206.0 pvc 9.0 16.0 19.0 Concrete/Masonry tank 60.0 Galvanised Steel 200.0 150 1 3 yes 8 12.0 Submersible Pump granfos 180.0 Hybrid - Solar/Generator perkin 30.0 300w 21.0 poor no 36.7 7.28 1800.0 930.0 Communal IMC water tank 2021-02-08
7902 Borehole Galmudug Ministry of Energy and Water Resources April 13, 2022 Mudug hobyo wisil 0.5 ICRC 10/12/2007 wisil 3 5.4455081 48.1367017 147.0 0 rural urban yes Yes 3650 300 15000 212.0 pvc 8.0 16.0 Concrete/Masonry tank 36.0 Galvanised Steel 145.0 250 1 3 yes 4 10.0 Submersible Pump grunfos 195.0 Hybrid - Solar/Generator perkin 40.0 300w 21.0 no 33.2 7.39 2540.0 1760.0 Communal yes 4 1 GSA store house & water tank 2020-05-12
8066 Borehole Galmudug Ministry of Energy and Water Resources April 9, 2022 Mudug galkayo Galinsor 0.0 ICRC Dur Dur weyne 6.4241445 46.7067729 328.0 0 rural urban yes Yes 2100 6300 58000 190.0 pvc 8.0 Concrete/Masonry tank 60.0 Galvanised Steel 540.0 100 1 1 yes 20 9.0 Submersible Pump franglin 140.0 Hybrid - Solar/Generator Doutz 32.0 300w 20.0 poor 1. old water tanks 2. old pipelines 3. kiosks and animal troughs leaching no 31.2 8.34 1332.0 932.0 Communal yes Agency not specified solar PIU 2018-02-07

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors