Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7277 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 24, 2022 | Galgaduud | cadaado | Godinlabe | 0.0 | — | — | Durdur | — | 5.8743101 | 46.6313549 | 294.0 | — | 0 | — | rural urban | yes | — | Yes | — | 3000 | — | — | 35000 | — | — | 204.0 | gi | 8.0 | — | — | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 80.0 | Galvanised Steel | 340.0 | 1500 | 2 | 3 | yes | 10 | 8.0 | Submersible Pump | Kaprari | — | 50.0 | Hybrid - Solar/Generator | Doutz | 36.0 | Js300 | 16.0 | poor | 1. Most water tanks are old and leaching 2. Motor stoped function 3. and pump replacement 4. Distribution pipes of 4 km host communities. | no | — | 35.2 | 6.66 | 3790.0 | 1900.0 | — | Private/Individual | — | — | — | — | yes | 0.021 | yes | — | — | — | NRC | Water Tank | — | — | — | — |
686 | BHGLCD036 | Borehole | FGS_MoEWR | Sept. 14, 2019 | Galgaduud | Cadaado | Baxdo 3 | 1.0 | Community | 13-11-17 | Zamzam Baxdo 3 | — | 5.79959 | 47.22235 | 187.0 | 3.2 | 2 | 68452055379.jpg | Rural Urban | Yes | — | Yes | — | — | 100 | 0 | 10000 | 0.0 | — | 270.0 | — | — | 50.0 | 16.0 | 12.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 100.0 | PVC | 1000.0 | 3000 | 0 | 2 | Yes | 7 | 8.0 | No Pump | — | — | — | — | — | — | — | — | Good | 1. Motor is very low | No | — | 34.0 | 7.15 | 3600.0 | 2079.0 | — | Private/Individual | — | — | — | — | Yes | 0.01 | No | — | — | — | IOM - International Organisation of Migration | Water tank, | 2018-06-10 | Water tank storage | — | Strategic Water Sources Survey – WSS_NATl |
7263 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 24, 2022 | Galgaduud | cadaado | Bali Higis | 3.0 | Individual | 21/01/2009 | Bali higis | — | 6.1674787 | 46.6330098 | 318.0 | — | 0 | — | rural urban | yes | — | Yes | — | 6400 | 500 | 20 | 85000 | 1.0 | — | 220.0 | pvc | 8.0 | 108.0 | 16.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 80.0 | 30 | 2 | 2 | yes | 16 | 8.0 | Submersible Pump | Granfos | — | 108.0 | Hybrid - Solar/Generator | Doutz | 36.0 | Pm340 | 24.0 | fair | 1. Needs implementation of water supply system for IDPs residents(4km) | no | — | 35.0 | 6.83 | 3460.0 | 1750.0 | — | Private/Individual | — | — | — | — | yes | 0.015 | yes | — | — | — | PAH | 1. Pump and pipes 2. Motor | — | — | — | — |
7314 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 15, 2022 | Galgaduud | dhusa_marreb | Waxaracade | 0.2 | Community | 17/04/2018 | Mahiigaan | — | 5.550731 | 46.3950921 | 222.0 | — | 0 | — | rural urban | yes | — | Yes | — | 4500 | 450 | 0 | 1000 | 19.0 | — | 140.0 | pvc | 8.0 | 42.0 | 28.0 | 18.0 | 2.0 | 0.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 90.0 | 1100 | 0 | 0 | yes | 15 | 14.0 | Submersible Pump | Granvoz | 28.0 | 110.0 | Generator | Perkin | 40.0 | — | — | fair | 1. No fencing 2. No generator house 3. No watchman house 4. No Animals troughs | no | — | 28.0 | 7.5 | 2660.0 | 1335.0 | — | Communal | yes | 2019-09-18 | 3 | 1 | yes | 0.005 | yes | — | — | — | DBG | 1. Water tank 2. Solar | — | 2021-08-15 | — | — |
7961 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 17, 2022 | Galgaduud | dhusa_marreb | Waxaracade | 0.15 | Community | — | Dhobshac | — | 5.537548 | 46.3977247 | 216.0 | — | 0 | — | urban | yes | — | Yes | — | 12000 | — | — | — | — | — | 130.0 | pvc | 8.0 | 93.8 | 20.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 80.0 | Galvanised Steel | 150.0 | 0 | 1 | 1 | yes | 15 | 12.0 | Submersible Pump | Granfos | — | 85.0 | Generator | Perkin | 30.0 | — | — | fair | 1. No water distribution pipeline to the HH. 2. Lack of watch man House 3. Have no fencing 4. 50 meter cubic water tank | no | — | 28.8 | 6.89 | 2065.0 | 1032.0 | — | — | — | — | — | — | — | — | — | — | — | — | Agency not specified | Motor | Individual | — | — | — |
8079 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 20, 2022 | Galgaduud | dhusa_marreb | Laanle | 1.6 | NRC | 19/06/2021 | Laanle | — | 5.3986729 | 45.7024847 | 319.0 | — | 0 | — | rural | yes | — | Yes | — | 5000 | 250 | — | 66666 | 0.5 | — | 193.0 | pvc | 8.0 | 93.3 | 18.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 160.0 | 0 | 1 | 2 | yes | 10 | 10.0 | Submersible Pump | Franklin | — | 153.0 | Generator | Perkin | 40.0 | — | — | fair | 1. No water distribution pipelines 2. No storehouse 3. Watch man House 4. Not have enough water tank | no | — | 29.7 | 7.04 | 1290.0 | 835.0 | — | Communal | yes | 2021-05-22 | 4 | 2 | — | — | — | — | — | — | ICRC | 1. Motor 2. Pump and pipes | — | 2021-12-24 | — | — |
7754 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 23, 2022 | Galgaduud | dhusa_marreb | Garijir | 0.5 | Kuwait | 21/03/2012 | DURdur | — | 5.441439 | 45.5153934 | 407.0 | — | 0 | — | rural urban | yes | — | Yes | — | 7000 | 10000 | — | 45000 | — | — | 230.0 | pvc | 9.0 | 120.0 | — | 16.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Other | 100.0 | 54 | 0 | 0 | yes | 12 | 20.0 | Submersible Pump | India | — | 180.0 | Generator | DEUTZ | 40.0 | — | — | poor | 1. Not have enough distribution pipelines 2. Not have solar system 3. Pump pipes are old and leaching. | no | — | 28.6 | 7.65 | 1860.0 | 960.0 | — | Communal | yes | 2020-03-23 | 4 | 1 | yes | 0.002 | — | — | — | — | WARDI | Small water tank | — | — | — | — |
8089 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 28, 2022 | Galgaduud | cabudwaaq | Herale | 0.8 | Not specified | 28/03/2008 | Shikh abdulahi borehole | — | 6.0261629 | 45.9630325 | 325.0 | — | 0 | — | rural urban | yes | — | Yes | — | 6000 | 300 | — | 15000 | — | — | 140.0 | pvc | 6.0 | — | 28.0 | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 42.0 | 380 | 0 | 0 | yes | 7 | 10.0 | Submersible Pump | Not specified | — | 92.0 | Hybrid - Solar/Generator | Perkin | 30.0 | JAM72S09 | 18.0 | poor | 1. Not have enough water tanks 2. Not have animal troughs 3. Water distribution pipes are very small and need to change. | no | — | 34.1 | 7.4 | 1229.0 | 855.0 | — | Communal | yes | — | 6 | 2 | — | — | — | — | — | — | — | — | — | — | — | — |
7261 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 24, 2022 | Galgaduud | dhusa_marreb | Iidole | 0.4 | CPD | — | Iidole | — | 6.1709617 | 46.8492667 | 286.0 | — | 0 | — | rural urban | yes | — | Yes | — | 18000 | 250 | 100 | 20000 | 1.0 | — | 170.0 | gi | 8.0 | — | 24.0 | 15.0 | — | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 32.0 | Galvanised Steel | 180.0 | 70 | 2 | 2 | yes | 14 | 8.0 | Submersible Pump | — | — | 110.0 | Hybrid - Solar/Generator | Perkin | 30.0 | JAM72S09 | 16.0 | fair | 1. Not have protection fencing 2. Solar not working properly 3. Pump is old | no | — | 32.2 | 6.88 | 3500.0 | 1750.0 | — | Private/Individual | — | — | — | — | yes | 0.015 | yes | — | — | — | IRC | Solar | — | 2018-12-21 | — | — |
7751 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 20, 2022 | Galgaduud | dhusa_marreb | Guriel | 1.5 | NRC | 20/03/2018 | Beder 2 | — | 5.3002497 | 45.8610271 | 262.0 | — | 0 | — | rural urban | yes | — | Yes | — | 5000 | 4500 | 0 | 4700 | 0.0 | — | 170.0 | pvc | 8.0 | — | — | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 165.0 | 833 | — | — | yes | 12 | 8.0 | Submersible Pump | 11 | 24.0 | 120.0 | Generator | Pm30 | 30.0 | — | — | fair | 1. Not have protection wall | no | — | 29.5 | 6.67 | 3970.0 | 1970.0 | — | Private/Individual | — | — | — | — | yes | 0.002 | no | — | — | — | Agency not specified | Motor | Beder Company | 2012-03-20 | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France