Code BHMDHO062
Water Source Type Borehole
Inspecting Agency Puntland_PWDA
Inspection Date Nov. 25, 2019
District Hobyo
Settlement Name Towfiiq BH1
Settlement Distance 0.5
Establishing Agency SSF - Somali Stability Fund
Establishing Date 11-07-16
Source Name Towfiiq BH1
Geometry None
Latitude 6.6138
Longitude 48.8711
Sources Cluster 1
Water Source Photo
Users Rural
Permanent? Yes
Months Used None
Functioning? Yes
Non Function Reason None
No of Humans None
No of Camels 1000
No of Cattle None
No of Shoats 20000
Irrigation Area None
Source Protected? None
Borehole Depth 80.0
Wellcasing Type None
Wellcasing Size None
Borehole SWL None
Borehole Operating Yield 10.0
Borehole Operating Hours None
Borehole Operating Drawn None
Borehole Recovery Time None
Reservoir Type Concrete/Masonry tank
Reservoir Capacity 35.0
Pipeline Type PVC
Pipeline Length 1500.0
HouseHold Connections 20
Water Point Kiosks 6
Troughs 2
Source Emergency? Yes
No of Trucks 7
Truck Capacity 8.0
Pump Type Submersible Pump
Pump Model Lowara 11
Pump Capacity None
Pump Level 66.0
Power Source Hybrid - Solar/Generator
Generator Type Jp45
Generator Capacity 45.0
Solar Type None
Solar Capacity None
Supply Condition Good
Supply System Condition Notes None
Physical Water Issues No
Physical Problem Reason None
Temperature 31.6
pH None
Electrical Conductivity 6790.0
Total Dissolved Solids 3400.0
Water Sample Code No Document
Management Type Communal
WSC None
WSC Established Date 23-03-19
WSC Male 2
WSC Female None
Humans Charged for Water? Yes
Cost Of Water for Humans 0.03
Water Charged for Animals? Yes
Cost Of Water for Animals None
Last Intervention Agency CARE Somalia
Last Intervention Description Generator room
Last Intervention Date March 23, 2019
Proposed Intervention Description Full rehabilitation Fencing
Additional Notes None
Metadata Tag Strategic Water Sources Survey – WSS_NAT
History watersource.HistoricalWaterSource.None