Code DWHRBE012
Water Source Type Dug Well
Inspecting Agency SWALIM_GSA
Inspection Date March 1, 2018
District Belet Weyne
Settlement Name Gambarlaawe
Settlement Distance (km) None
Establishing Agency None
Establishing Date 28-06-05
Source Name Gaduud Guube
Latitude 4.7149
Longitude 45.1923
Sources Cluster 2
Water Source Photo No Photo
Users None
Permanent? Yes
Months Used None
Functioning? Yes
Non Function Reason None
No of Humans None
No of Camels 600
No of Cattle 400
No of Shoats 900
Irrigation Area (ha) 50.0
Source Protected? None
Dugwell Depth (m) 12.0
Dugwell SWL 10.0 (m)
Dugwell Yield (m3/hr) 0.5
Dugwell operating hours (hrs/day) None
Dugwell draw down (m) None
Recovery time (hr) None
Reservoir Type None
Reservoir Capacity (m3) None
Pipeline Type None
Pipeline Length (m) None
HouseHold Connections None
Water Point Kiosks None
Troughs None
Source Emergency? None
No of Trucks None
Truck Capacity (m3/hr) None
Pump Type None
Pump Model Electric pump
Pump Capacity (m3/hr) None
Pump Level (m) 8.0
Power Source None
Generator Type None
Generator Capacity (kVA/kWh) None
Solar Type None
Solar Capacity (kVA/kWh) None
Supply Condition None
Supply System Condition Notes None
Physical Water Issues None
Physical Problem Reason None
Temperature (°C) 33.3
pH 7.8
Electrical Conductivity (µS/cm) 2180.0
Total Dissolved Solids (mg/l) 1080.0
Water Sample Code 1
Management Type Private
WSC None
WSC Established Date not clear
WSC Male None
WSC Female None
Humans Charged for Water? None
Cost Of Water for Humans (USD) None
Water Charged for Animals? None
Cost Of Water for Animals (USD) None
Last Intervention Agency None
Last Intervention Description None
Last Intervention Date None
Proposed Intervention Description Rehabilitate
Additional Notes needs to improve
Metadata Tag Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS
History History DWHRBE012

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors