Code SPSNCR013
Water Source Type Spring
Inspecting Agency Somaliland_MoWRD
Inspection Date Oct. 31, 2019
District Ceerigaabo
Settlement Name Rugay
Settlement Distance None
Establishing Agency UNICEF - United Nations Children's Fund
Establishing Date 04-01-08
Source Name Rugay spring
Geometry None
Latitude 10.8409
Longitude 47.3051
Sources Cluster 0
Water Source Photo
Users None
Permanent? no
Months Used 6
Functioning? Yes
Non Function Reason None
No of Humans None
No of Camels None
No of Cattle None
No of Shoats None
Irrigation Area None
Source Protected? None
Spring Cumulative discharge rate 4.0
Reservoir Type Concrete/Masonry tank
Reservoir Capacity None
Pipeline Type PVC
Pipeline Length 1500.0
HouseHold Connections 0
Water Point Kiosks 1
Troughs 0
Source Emergency? no
No of Trucks None
Truck Capacity None
Pump Type None
Pump Model Granfoss
Pump Capacity 5.0
Pump Level 2.0
Power Source Submersible Pump
Generator Type None
Generator Capacity None
Solar Type M-150w
Solar Capacity 150.0
Supply Condition None
Supply System Condition Notes Transmition and distribution pipe line Is poor condition and making leakage
Physical Water Issues no
Physical Problem Reason None
Temperature 23.3
pH 8.0
Electrical Conductivity 532.0
Total Dissolved Solids 378.0
Water Sample Code No Document
Management Type None
WSC None
WSC Established Date None
WSC Male None
WSC Female None
Humans Charged for Water? no
Cost Of Water for Humans None
Water Charged for Animals? no
Cost Of Water for Animals None
Last Intervention Agency None
Last Intervention Description None
Last Intervention Date None
Proposed Intervention Description We proposed existing Dug Well deepling rehabilitation of tank replacement 3 solar panel
Additional Notes None
Metadata Tag Strategic Water Sources Survey – WSS_NAT
History watersource.HistoricalWaterSource.None