Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7120 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Farjano | 1.7 | Government | 01/04/2021 | Farjano BH | — | 8.6324827 | 46.570983 | 790.0 | — | 1 | — | urban rural | yes | — | Yes | — | 1750 | 1400 | — | 2150 | 0.0 | — | 480.0 | pvc | 8.0 | — | 50.0 | 12.0 | — | 0.2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | — | — | 0 | 2 | yes | 15 | 8.0 | Submersible Pump | Lowara | 15.0 | 350.0 | Hybrid - Solar/Generator | Linz | 50.0 | DS572415M | 23.0 | good | Shortage of water supply | yes | Colorless and odorless | 32.5 | 7.41 | 4140.0 | 2773.0 | — | Communal | yes | 01/04/2021 | 5 | 0 | yes | 0.5 | yes | — | — | — | — | — | — | 1. Emergency for water supply Construction of koisks 2. Fancing 3. Extension of pipelines | — | — |
8315 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Afar iridood | — | UNICEF | 13/02/2021 | Afar iridood BH | — | 6.9935791 | 47.3739121 | 312.0 | — | 1 | — | rural urban | yes | — | No | 1 month not functioning, needs observation of borehole | 1260 | — | — | — | — | — | 180.0 | pvc | 8.0 | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 50.0 | — | 2 | 2 | no | — | — | Submersible Pump | Lowara | 11.0 | 135.0 | Generator | CEOLMO | 30.0 | — | — | poor | Shortage of water supply. And borehole problemed. | no | — | — | — | — | — | — | Communal | yes | 13/02/2021 | 4 | 2 | no | — | no | — | — | — | — | — | — | 1. Emergency to solve this problem 2. Needs camera to observation borehole problem. | — | — |
8730 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Gacmo fale | — | DRC - Puntland | 05/01/2021 | Gacmofale BH | — | 7.0381939 | 47.7817081 | 267.0 | — | 2 | — | — | no | 4 | No | Unknown problem | — | — | — | — | — | — | 222.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 1. Emergency to study for problems this borehole. | — | — |
8167 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | Community | — | Jariiban Shallow well | — | 7.2120145 | 48.850589 | 150.0 | — | 3 | — | rural urban | yes | — | Yes | — | 500 | 500 | 150 | 750 | 0.0 | — | — | — | — | — | — | — | — | — | 4.0 | — | 7.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Galvanised Steel | — | — | — | — | yes | 5 | 6.0 | No Pump | — | — | — | — | — | — | — | — | poor | There is no any water supply system | yes | Contaminated | 29.1 | 7.38 | 743.0 | 365.0 | — | Communal | no | — | — | — | — | — | — | — | — | — | — | — | — | 1. Emergency( construction all water supply) 2. Cover of dug well 3. Water quality testing | — | — |
8304 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Xadhadhan | 1.4 | ISRC | 01/04/2016 | Xadhadhan BH | — | 8.3000813 | 46.156516 | 660.0 | — | 1 | — | urban rural | yes | — | No | Year and half, problem of pump and cables | 21000 | — | — | — | — | — | 373.0 | pvc | 8.0 | — | 12.0 | — | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | PVC | 2000.0 | 30 | 4 | 4 | no | — | — | Submersible Pump | Lowara | 15.0 | 340.0 | Hybrid - Solar/Generator | Parkins | 60.0 | SZYL-M330-36 | 23.1 | fair | — | no | — | — | — | — | — | — | Communal | yes | 01/04/2016 | 3 | 2 | yes | — | — | — | — | — | CARE Somalia | 01/04/2019 | 1. Rehabilitation of pump and cables | 1. Emergency. 2. Installation of cables and pump. 3. Rehabilitation of solar | — | — |
7509 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Galkacayo Water Company / Qatar charity | 05/03/2015 | Galkacayo BH 7 | — | 6.7962296 | 47.4103577 | 268.0 | — | 20 | — | urban | yes | — | Yes | — | 77000 | — | — | — | — | — | 200.0 | pvc | 12.0 | — | 26.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 750.0 | Galvanised Steel | 2500.0 | 5000 | — | — | yes | — | — | Submersible Pump | Etx | 22.0 | 160.0 | Generator | Parkins | 350.0 | — | — | good | — | yes | Colorless and odorless | 27.6 | 7.92 | 3470.0 | 1718.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Extension of pipelines | — | — |
7730 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Private | 05/03/2016 | Galkacayo daryeel BH 2 | — | 6.8166163 | 47.4382128 | 262.0 | — | 20 | — | urban | yes | — | Yes | — | 10000 | — | — | — | — | — | 230.0 | pvc | 8.0 | — | 13.3 | 18.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 160.0 | PVC | 10000.0 | 700 | — | — | no | — | — | Submersible Pump | Lowara | 22.0 | 156.0 | Hybrid - Solar/Generator | — | 160.0 | SS360_72 | 32.76 | good | — | yes | Colorless and odorless | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.01 | no | — | — | — | — | — | — | 1. Extension of pipelines | — | — |
8735 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 30, 2022 | Sool | las_caanood | Faleryaalle | 2.0 | — | 12/02/2022 | Faleeryaare BH | — | 8.5449126 | 48.0735031 | 488.0 | — | — | — | urban | no | — | No | This borehole is new, and infrastructure currently constructing | — | — | — | — | — | — | 120.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | PWDA | 12/03/2022 | 1. Construction of new elevated tank | 1. Extension of pipelines 2. Construction of koisks | — | — |
7859 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 3, 2022 | Sool | taleex | God aale | 1.0 | NPA | 03/04/2015 | God aaale BH | — | 9.0939522 | 47.9156799 | 670.0 | — | 1 | — | urban rural | yes | — | Yes | — | 3500 | 850 | — | 1150 | 0.0 | — | 150.0 | pvc | 8.0 | — | 13.3 | 20.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 2000.0 | 100 | 4 | 4 | yes | 2 | 8.0 | Submersible Pump | Lowara | 15.0 | 133.0 | Hybrid - Solar/Generator | Parkins | 30.0 | DS72350M | 24.5 | good | — | yes | Colorless and odorless | 36.1 | 7.51 | 3110.0 | 2083.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | NRC | 03/04/2018 | 1. Installation of solar power | 1. Extension of pipelines 2. Rehabilitation of animal troughts 3. Rehabilitation riser and pump/cables. | — | — |
7699 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Private | 05/03/2007 | Galkacayo agoonta BH | — | 6.8163557 | 47.4337054 | 259.0 | — | 20 | — | urban | yes | — | Yes | — | 500 | — | — | — | — | — | 230.0 | pvc | 8.0 | — | 8.0 | 18.0 | — | 2.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | PVC | 600.0 | 50 | — | — | yes | 10 | 8.0 | Submersible Pump | Lowara | 18.0 | 138.0 | Hybrid - Solar/Generator | — | 70.0 | BR_M300W | 21.0 | good | — | yes | Colorless and odorless | 32.1 | 7.81 | 3340.0 | 1642.0 | — | Private/Individual | — | — | — | — | yes | 0.01 | no | — | — | — | — | — | — | 1. Extension of pipelines. 2. Extension and installation of solar power 3. Rehabilitation of generator. 4. Construction of new elevated tank. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France