Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7127 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 3, 2022 | Sool | taleex | Qalwo | 2.0 | UNICEF | 03/04/2020 | Qalwo BH | — | 8.9263499 | 48.2875784 | 513.0 | — | 1 | — | urban rural | yes | — | Yes | — | 2450 | 1200 | — | 2300 | 0.0 | — | 200.0 | pvc | 8.0 | 23.0 | 7.4 | 12.0 | — | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | 2000.0 | — | 3 | 3 | yes | 20 | 8.0 | Submersible Pump | Lowara | 11.0 | 180.0 | Generator | Parkins | 45.0 | — | — | good | — | no | — | — | — | — | — | — | Communal | yes | 17/08/2020 | 4 | 0 | yes | 0.1 | yes | — | — | — | — | — | — | 1. Extension pipelines 2. Construction of new kiosks 3. Water supply | — | — |
7227 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Daarasalaam | — | Community | 13/03/2002 | Daarasalaam BH | — | 7.0814702 | 47.4922321 | 315.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3500 | 450 | — | 1500 | 0.0 | — | 170.0 | pvc | 8.0 | 56.0 | 16.6 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1500.0 | 250 | 5 | 2 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 108.0 | Hybrid - Solar/Generator | Parkins | 45.0 | DS572380M | 16.72 | good | — | yes | Colorless and odorless | 32.6 | 7.71 | 2470.0 | 1225.0 | — | Communal | yes | 13/03/2002 | 3 | 0 | yes | 0.05 | yes | — | — | — | NRC | 13/02/2021 | 1. Construction of new elevated tank 2. Construction of koisks | 1. Extension pipelines 2. Extension of solar power | — | — |
7847 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 19, 2022 | Sool | taleex | Xerta-taleex | 3.0 | ACTED | 03/04/2020 | Xerta-taleex BH | — | 9.1008438 | 48.4306257 | 512.0 | — | 1 | — | rural urban | yes | — | Yes | — | 750 | 800 | — | 1050 | 0.0 | — | 80.0 | pvc | 8.0 | — | 18.0 | 12.0 | — | 0.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 2000.0 | 10 | 3 | 3 | no | — | — | Submersible Pump | Lowara | 7.5 | 65.0 | Hybrid - Solar/Generator | Parkins | 30.0 | JCNS-36V360W | 10.8 | good | — | yes | Colorless and odorless | 35.1 | 7.4 | 3360.0 | 2251.3 | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Extension pipelines 2. Rehabilitation of riser pipes 3. Replacement of new generator 4. Construction of generator room | — | — |
7244 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Community | 08/03/2018 | Mareegaale BH | — | 7.045631 | 47.0177575 | 346.0 | — | 11 | — | rural urban | yes | — | Yes | — | 2800 | 500 | 150 | 1500 | — | — | 250.0 | gi | 8.0 | — | 12.0 | 20.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 96.0 | PVC | 4000.0 | 360 | — | 3 | yes | 10 | 8.0 | Submersible Pump | Lowara | 15.0 | 160.0 | Hybrid - Solar/Generator | Parkins | 60.0 | PYD400MIK_36 | 22.4 | good | — | yes | Colorless and odorless | 33.7 | 7.67 | 1610.0 | 789.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | Community | 08/03/2020 | 1. Construction of elevated water tank | 1. Extension pipelines. 2.caretaker and Generator rooms construction. | — | — |
7115 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | March 28, 2022 | Nugaal | garowe | Caano-yaskax | 0.0 | CEFA | 28/03/2007 | Caano yaskax dugwell | — | 8.837375 | 48.7501967 | 452.0 | — | 1 | — | urban rural | yes | — | Yes | — | 1750 | 250 | 500 | 2000 | 0.0 | — | — | — | — | — | — | — | — | — | 9.0 | 2.0 | 2.0 | 8.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 700.0 | 1 | 4 | 2 | no | — | — | Submersible Pump | Sara | 4.0 | 8.0 | Solar | — | — | — | 2.0 | good | — | yes | Colorless and odorless | 30.5 | 7.8 | 3150.0 | 1570.0 | — | Communal | yes | 28/03/2019 | 7 | 0 | yes | 0.05 | yes | — | — | — | NRC | 28/03/2019 | 1. Installation of solar power | 1. Extra depth of dugwell 2. Rehabilitation of pipelines 3. Extension pipelines 4. Construction of koisks. | — | — |
7133 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 31, 2022 | Sool | las_caanood | Saaxdheer | 0.5 | NPA | 31/03/2014 | Seexdheer BH | — | 8.0068294 | 47.1040015 | 608.0 | — | 1 | — | urban rural | yes | — | Yes | — | 17500 | 5000 | 300 | 15000 | 0.0 | — | 370.0 | pvc | 8.0 | — | 12.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 76.0 | PVC | 1200.0 | 25 | 5 | 5 | yes | 40 | 8.0 | Submersible Pump | Lowara | 15.0 | 330.0 | Hybrid - Solar/Generator | Parkins | 45.0 | BR-M300W | 21.0 | good | — | yes | Colorless and odorless | 31.6 | 7.76 | 1912.0 | 1281.0 | — | Communal | yes | 31/03/2018 | 3 | 0 | yes | 0.05 | yes | — | — | — | CARE Somalia | 30/12/2021 | 1. Construction of new elevated tank 2. Rehabilitation of pump and riser pipes 3. Construction of 2 koisks 4. Installation of new generator | 1. Extra generator. | — | — |
7700 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Private | 05/03/2002 | Daryeel Galkacayo BH 1 | — | 6.8165208 | 47.4376178 | 264.0 | — | 20 | — | urban | yes | — | Yes | — | 10000 | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 13.3 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 160.0 | PVC | 10000.0 | 700 | 3 | — | no | — | — | Submersible Pump | Lowara | 22.0 | 138.0 | Hybrid - Solar/Generator | Parkins | 160.0 | SS360-72 | 32.76 | good | — | yes | Colorless and odorless | 35.1 | 7.28 | 3260.0 | 1615.0 | — | Private/Individual | — | — | — | — | yes | 0.01 | no | — | — | — | — | — | — | 1. Extra pump 2. Riser pipes rehabilitation 3. Water tank rehabilitation. | — | — |
7189 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Laanmadow | — | Community | — | Laanmadow BH | — | 7.3302253 | 47.2966161 | 354.0 | — | 1 | — | urban rural | yes | — | Yes | — | 950 | 1800 | — | 2200 | 0.0 | — | — | pvc | 8.0 | — | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Stainless Steel | — | — | 2 | 2 | yes | 10 | 8.0 | Submersible Pump | — | 11.0 | — | Hybrid - Solar/Generator | Parkins | 45.0 | — | — | poor | The operator of borehole has no good detail information about tha borehole and supplies. | yes | Colorless and odorless | 29.9 | 7.61 | 1940.0 | 958.0 | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Fancing 2. Rehabilitation of kiosks 3. Rehabilitation of animal troughts | — | — |
8307 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | PWDA | 27/03/2020 | Madaxtooyo BH 2 | — | 8.4128335 | 48.4650113 | 435.0 | — | 1 | — | urban | yes | — | Yes | — | 120 | — | — | — | — | — | 240.0 | pvc | 8.0 | — | 18.0 | 10.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 700.0 | 5 | 0 | 0 | no | — | — | Submersible Pump | — | 15.0 | 220.0 | Hybrid - Solar/Generator | Parkins | 45.0 | — | — | good | — | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | — | — | — | 1. Fancing of borehole | — | — |
7103 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Mudug | jariban | Gocosaale | — | Community | 28/04/2021 | Gocosaale BH | — | 6.8633508 | 49.0177023 | 26.0 | — | 1 | — | rural | yes | — | Yes | — | 500 | 1000 | 70 | 5000 | 0.0 | — | 180.0 | pvc | 8.0 | — | 8.0 | 24.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 150.0 | — | 2 | 4 | yes | 20 | 8.0 | Submersible Pump | — | 11.0 | 150.0 | Generator | Parkins | 30.0 | — | — | poor | Under construction | yes | Colorless and odorless | 32.0 | 7.41 | 728.0 | 362.0 | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Fancing of borehole 2. Pump rehabilitation 3. Construction of generator room 4. Installation of solar power 5. Water committees training. 6. Operation tools. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France