Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7426 Dug Well Puntland Ministry of Energy Minerals and Water March 19, 2022 Bari iskushuban Xaafun 6.0 Save the children 22/06/2015 Matakiini 2 10.4353928 51.2490906 -37.0 3 rural urban yes Yes 1500 200 2500 8.0 7.0 1.0 6.0 Concrete/Masonry tank 18.0 PVC 4 8 1 no Submersible Pump Lowara 8.0 Solar HE305-72P 4.27 poor The yield is very low. Xaafun have two dug well, both they distribute water to 1 elevated water tank. The water tank distribute water to the kiosks in the village and animal troughs. no 27.8 9.0 3250.0 1624.0 Communal yes 18/07/2021 4 3 yes 0.1 no CARE Somalia 17/02/2022 1: Installation of solar power system. 2: Supplied submersible pump. 3: Rehabilation of elevated water tank in order to stop water leaking. 4: Rehabilitation of caretaker room 1: Construction of another borehole. 2: Generator. 3: animal troughs. 4: Distribution pipe lines. 5: Construction of 4 kiosks in the school.
2451 DWAWBO070 Dug Well Somaliland_MoWRD Dec. 14, 2019 Awdal Borama Jarahoroto Other 8/12/2017 Jarahoroto cad cad 9.8641 43.3266 1516.0 4.288 0 1576317550682.jpg yes Yes 2000 Yes 8.0 1.0 4.0 6.0 0.0 Concrete/Masonry tank Galvanised Steel 2220.0 0 1 0 no Lowara 7.5 7.0 Submersible Pump Photovoltaic 4.5 No Yes 5/21/2018 5 2 Yes 0.06 No Construction of new animal troughs and water points Replacement pipe line about 2220 from Dug Well to village Strategic Water Sources Survey – WSS_NATl
8260 Dug Well Somaliland MoWRD April 14, 2022 Woqooyi Galbeed hargeisa Dhubato village 0.3 UNICEF 10/08/2008 Dhubato dug well 9.7403177 44.4677289 1108.0 20 urban rural yes No Year before becouse of the water depletion. 4200 0 0 0 0.0 4.0 0.0 0.0 0.0 Concrete/Masonry tank 45.0 Galvanised Steel 300.0 600 4 0 no Submersible Pump Unknown 0.0 0.0 Solar Dusol 4.68 poor The supply condition is very poor becouse of the dried dug well of the village. no 0.0 Communal no no no Rehapilitation Relocation of the dug well and formation of sand storage dam.
2470 DWAWGE006 Dug Well Somaliland_MoWRD Dec. 14, 2019 Awdal Gebiley Geed diqsi Other 5/24/2017 Burdi Dug Well 3 9.8402 43.4069 1475.0 3.216 1 1576309354065.jpg yes Yes 5000 Yes 15.0 3.0 6.0 12.0 0.0 Steel tank Galvanised Steel 14000.0 0 8 0 no Lowara 4.0 13.0 Submersible Pump Photovoltaic 4.8 No 16.0 8.28 892.0 691.0 Yes 5/20/2017 5 2 Yes 0.06 No Gabyan. -The No.piped HH connections on going at this time Strategic Water Sources Survey – WSS_NATl
7439 Dug Well Puntland Ministry of Energy Minerals and Water Feb. 22, 2022 Nugaal eyl Ciyocaddo 0.3 KAALO Relief and Development 22/01/2017 Ciyocado DW 8.2704521 49.8270006 61.0 0 rural urban yes Yes 7000 2000 5000 0.0 6.0 2.5 12.0 2.0 Concrete/Masonry tank 45.0 Galvanised Steel 500.0 500 4 3 yes 12 72.0 Submersible Pump Lowara 1.4 4.0 Hybrid - Solar/Generator Kama 0.22 300-72M 5.0 poor Destroyed dug well no 30.1 7.1 1000.0 495.0 Communal yes 22/01/2017 3 2 yes 0.1 KAALO Relief and Development 22/01/2018 Construction of ground tank 1. Drilling new dug well. 2. Rehabilitation of water supply extension. 3. Construction of new kiosks. 4. Construction of new elevated tank
250 BHBRBO053 Borehole Puntland_PWDA Oct. 29, 2019 Bari Bossaso Bossaso 0.0 Redsea universityBH 29-10-19 Red sea University BH 11.26 49.1947 41.0 4.9 72327573953.jpg Urban Yes Yes 67.0 10.0 0.2 Concrete/Masonry tank 40.0 PVC 200.0 No Submersible Pump Lowara 2.5 10.0 43.0 Hybrid - Solar/Generator Perkins 60 60.0 5.0 Good Good No 32.0 3500.0 1751.0 Private/Individual No No Solar, Upvc pipes 200m Strategic Water Sources Survey – WSS_NATl
7868 Dug Well Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Cuun 0.0 Community 28/03/2000 Cuun dug well 8.8180342 48.8915942 468.0 1 urban yes Yes 1162 9.0 3.0 6.0 8.0 2.0 Concrete/Masonry tank 25.0 PVC 600.0 0 2 0 yes 2 8.0 Submersible Pump Lowara 4.0 8.0 Solar 5.0 fair Some rehabilitation needed yes Colorless and odorless 32.8 7.8 2920.0 1460.0 Communal no no no 1. Rehabilitation of pipelines 2. Construction of koisks 3. Extension of pipelines.
8005 Borehole Somaliland MoWRD April 12, 2022 Woqooyi Galbeed hargeisa Horuhaadlay 0.1 Individualy Established borehole 12/09/2019 Ismael Ali borehole 9.8449132 44.0423368 1008.0 0 rural yes Yes 4500 200 40 1500 6.0 96.0 gi 6.0 12.0 6.0 8.0 0.0 0.0 Other 43.0 PVC 500.0 642 0 0 yes 4 9.0 Submersible Pump Grundfos 15.0 60.0 Solar GPS-300-360 5.4 good Very good supply system and more people and animal depends on no 31.9 6.9 1700.0 1200.0 Private/Individual no no No intervention carried out Underground reservior, animal troughs, kios.
5117 DWTGOD060 Dug Well Somaliland_MoWRD Oct. 21, 2019 Togdheer Owdweyne Ceel xume Private 10/21/2006 Ceel xume Dug Well 1 9.3809 45.163 1032.0 4.9 30 1571654295969.jpg yes Yes 1400 No 18.0 15.0 10.0 3 2 no Grundfos 10.0 16.0 Submersible Pump 5.5 No No No Rehab Strategic Water Sources Survey – WSS_NATl
7284 Borehole Puntland Ministry of Energy Minerals and Water Feb. 19, 2022 Nugaal eyl Xasbahalle Chinese Government 19/02/1986 Xasbahalle BH 7.9635816 49.1609604 512.0 1 rural urban yes Yes 2500 500 1500 0.0 230.0 pvc 8.0 6.0 15.0 2.0 Concrete/Masonry tank 60.0 Galvanised Steel 200.0 500 1 2 no Submersible Pump Lowara 7.5 220.0 Hybrid - Solar/Generator Parkins 30.0 5.5 fair The consition of this supply system is very poor yes Colorless and odorless 30.3 6.85 3880.0 1929.0 Communal no yes 0.1 yes Puntland MoEMW 20/01/2021 Pipeline repaired 1. Needs rehabilitation of koiks. 2. Construction of new new kiosks. 3. Construction of animal thoughts. 4. Fuel.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors