Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7614 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 5, 2022 | Bari | bossaso | Aaran | 3.0 | — | — | Saynab borehole | — | 11.2430876 | 49.2090253 | 57.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 77.0 | pvc | 8.0 | 50.0 | 10.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 76.0 | Generator | Perkins | 80.0 | — | — | — | — | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | — | — | — | — | GUMCO | 05/10/2021 | Replacement of main raising pipes and submersible pump | Solar power system. Distribution pipes. Pump. | — | — |
7647 | — | Borehole | Somaliland MoWRD | April 7, 2022 | Togdheer | burco | Burco | 0.4 | Khalifa Foundation UAE | 07/09/2014 | Faras kabood borehole 10 | — | 9.4962028 | 45.5500329 | 1013.0 | — | 0 | — | urban | yes | — | Yes | — | 21000 | — | — | — | — | — | 160.0 | pvc | 8.0 | 93.0 | 28.0 | 17.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 150.0 | PVC | 1800.0 | 21000 | 0 | 0 | no | — | — | Submersible Pump | Grundfoz | 25.0 | 117.0 | Generator | Perkins | 80.0 | — | — | good | Each and every household has connection and access botable water for their water demand | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | yes | 0.025 | no | — | — | — | — | 05/11/2021 | 6pcs of pipes replaced | No intervention is required | — | — |
7616 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 5, 2022 | Bari | bossaso | Aaran | 3.0 | GUMCO | 06/12/2008 | Aaran borehole 2 | — | 11.2415982 | 49.2066493 | 41.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 70.0 | pvc | 8.0 | 50.0 | 10.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 69.0 | Generator | Perkins | 80.0 | — | — | fair | Yield is low | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | — | — | — | — | GUMCO | 05/11/2021 | Replacement of main raising pipes and submersible pump | Installation of solar power system. Distribution pipes | — | — |
7136 | — | Borehole | Somaliland MoWRD | May 5, 2022 | Sanaag | ceel_afweyn | Kulaal two | 0.5 | UNICEF | 24/11/2018 | Kulaal two Borehole | — | 9.74857759661973 | 47.6493260543793 | 899.0 | — | 1 | — | rural urban | yes | — | Yes | — | 15000 | 8000 | 200 | 30000 | 0.0 | — | 265.0 | gi | 8.0 | 246.0 | 14.0 | 12.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 100.0 | 30000 | 0 | 4 | yes | 8 | 8.0 | Submersible Pump | Grundfos | 15.0 | 245.0 | Hybrid - Solar/Generator | Perkins | 30.0 | Lorentz | 15.0 | good | The system is well functioning | no | — | 32.0 | 7.4 | 2700.0 | 1700.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.01 | yes | — | — | — | Oxfam Novib | 05/12/2020 | Solar system upgrading from 4kw to 11 kw. Solar fencing expansion. | Elevated water tank with capacity 40m3 of water, Motor 60kva, pump change and pipeline, animal throughs expansion currently many livestock depends on this borehole, solar expansion to 30kw and fencing expansion. Change of solar inverter. | — | — |
8635 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Bari | iskushuban | Foocaar | 1.0 | Community_ | 09/06/2010 | Foocar dugwell | — | 10.3218048 | 50.9010681 | -46.0 | — | 4 | — | rural urban | yes | — | No | 15/06/2021 Due to the drought the dugwell become unfunctioning. | — | 300 | — | 700 | — | — | — | — | — | — | — | — | — | — | 2.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | poor | The yield is low. No solar power system. No generator No storage tank. | no | — | — | — | — | — | — | — | — | — | — | — | no | — | no | — | — | — | Community_e | 06/01/2021 | Cleaning the deep of the dug well | 1: Digging the deep of the well in order to increase the yield. 2: Solar power installation 3: Generator 4: Construction of elevated water tank. 5: Installation of submersible and raising pipes 6: Extention of distribution pipe line in to the village | — | — |
7619 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | April 5, 2022 | Bari | bossaso | Madaxtooyo | 5.0 | GUMCO | 05/01/2020 | Madaxtooyo dugwell 3 | — | 11.2798887 | 49.2059442 | -2.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 28.0 | 24.0 | 38.0 | 21.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 27.0 | Generator | Perkins | 165.0 | — | — | good | — | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | — | — | — | — | GUMCO | 06/01/2022 | Replacement of main raising pipes | 1: Solar 2: Construction of storage water tank | — | — |
7237 | — | Borehole | Somaliland MoWRD | April 6, 2022 | Togdheer | burco | Qoyta | 4.0 | IR | 02/08/2019 | Qoyta borehole | — | 9.6760091 | 45.405806 | 1140.0 | — | 0 | — | rural urban | yes | — | No | It stops 07-02-2022, becouse of the pump replacement and one additional pipe is the main reason that the operator told as. | 60000 | 15000 | 20 | 6000 | 0.2 | — | 300.0 | gi | 6.0 | 160.0 | 10.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 5000.0 | 30 | 1 | 3 | yes | 3 | 9.0 | Submersible Pump | Grundfos | 15.0 | 272.0 | Hybrid - Solar/Generator | Jubaili bros | 45.0 | Vacson | 22.5 | poor | The borehole stops pump does not pumped well and they told problem comes after replacement of the pump and adding extra pipe so in general there is no supply system of qoyta borehole. | no | — | 25.8 | 7.66 | 2360.0 | 1600.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | Somaliland MoWRD | 06/02/2022 | Pump rehabilitation | Not functioning becouse of submersible pump failure, water meter also not functioning and needs replacement, no solar cut off. | — | — |
7522 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Halabookhad | 5.0 | WDA | 06/03/1974 | Halabookhad BH | — | 6.854273 | 47.4133554 | 278.0 | — | 20 | — | urban | yes | — | Yes | — | 10200 | — | — | — | — | — | 85.0 | pvc | 8.0 | 42.0 | 10.0 | 8.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 2500.0 | 300 | 8 | 2 | no | — | — | Submersible Pump | — | 11.0 | 65.0 | Hybrid - Solar/Generator | Parkins | 30.0 | PN60_365 | 22.79 | fair | This supply poorly functioning | yes | Colorless and odorless | 29.6 | 8.08 | 2540.0 | 1270.0 | — | Communal | yes | 06/03/1974 | 4 | 0 | yes | 0.05 | no | — | — | — | UNICEF | 06/03/2018 | Borehole rehabilitation and installation of solar power | Full rehabilitation: 1. Rehabilitation of generator 2. Rehabilitation of pump and riser pipes 3. Extension and rehabilitation elevated water tank 4. Rehabilitation of generator room 5. Rehabilitation of kiosks and animal thoughts. | — | — |
7511 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Galkacayo | 1.2 | UNHRC | 06/03/2015 | Salaama IDP 2 BH | — | 6.8555099 | 47.4437124 | 268.0 | — | 20 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 210.0 | pvc | 8.0 | 84.0 | 15.0 | 16.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 81.0 | PVC | 4200.0 | — | 9 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 126.0 | Hybrid - Solar/Generator | Parkins | 65.0 | 300_73M | 22.5 | fair | This supply has generator problem, so needs rehabilitation of generator | yes | Colorless and odorless | 29.5 | 7.8 | 3370.0 | 1667.0 | — | Communal | yes | 06/03/2015 | 4 | 2 | yes | 0.05 | no | — | — | — | Agency not specified | 06/03/2018 | Construction of elevated water | 1. Rehabilitation of pipelines 2. Rehabilitation of pump 3. Rehabilitation of generator ( Emergency). | — | — |
7892 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Gobsho | — | Community | 06/03/2017 | Gobsho BH | — | 6.9394533 | 47.4819791 | 269.0 | — | 1 | — | rural urban | yes | — | Yes | — | 2800 | 500 | — | 700 | 0.0 | — | 185.0 | pvc | 8.0 | 55.0 | 11.0 | 16.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 8.0 | Galvanised Steel | 600.0 | — | 4 | 3 | yes | 10 | 8.0 | Submersible Pump | Lowara | 11.0 | 145.0 | Hybrid - Solar/Generator | Parkins | 45.0 | — | 17.0 | fair | Shortness of storage or tank | yes | Colorless and odorless | 31.1 | 7.9 | 2610.0 | 1308.0 | — | Communal | yes | 06/03/2017 | 7 | 0 | no | — | no | — | — | — | Save the children | 06/03/2019 | Installation of solar power | 1. Construction of new elevated tank 2. Construction of generator room | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France