Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7534 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 13/03/2017 | Goldogob water company BH 5 | — | 7.0437981 | 47.0129558 | 352.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 235.0 | pvc | 8.0 | 140.0 | 18.0 | 15.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 2786.0 | 7000 | — | — | — | — | — | Submersible Pump | Grandfoss | 15.0 | 126.0 | Hybrid - Solar/Generator | IVECO | 45.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | — | — | — | — | — | — | — | 1. Fancing of borehole 2. Rehabilitation of generator. | — | — |
7176 | — | Spring | Puntland Ministry of Energy Minerals and Water | Feb. 22, 2022 | Nugaal | eyl | Ceelmadoobe | 0.8 | Community | 22/02/2011 | Ceelmadoobe Spring | — | 8.3965987 | 50.0466206 | 240.0 | — | 0 | — | rural urban | yes | — | Yes | — | 650 | 300 | — | 10000 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 20.0 | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 522.0 | 130 | 2 | 2 | yes | 2 | 5.0 | Submersible Pump | Lowara | 5.0 | 3.0 | Hybrid - Solar/Generator | Lister petter | 25.0 | — | 7.5 | fair | Supply Needs rehabilitation | yes | Colorless and odorless | 29.0 | 7.1 | 3200.0 | 1650.0 | — | Communal | yes | 22/01/2015 | 3 | 2 | yes | 0.05 | yes | — | — | — | Muslim Aid | 22/01/2013 | 1.Construction of caretaker room. 2.Construction of elevated tank, kiosks, and animal thoughts. | 1. Fancing of borehole 2. Week capacity of pump. 4. Construction of new kiosks 5.Rehiniltatation and Water supply extensions. 6. Rehabilitation of animal thoughts. 7. Rehabilitation of solar power system. | — | — |
7531 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Mudug | galkayo | Xarfo | — | UNICEF | 15/02/2021 | Xafro BH 4 | — | 7.3565719 | 47.615313 | 371.0 | — | 4 | — | urban | yes | — | Yes | — | 6300 | — | — | — | — | — | 220.0 | pvc | 8.0 | 140.0 | 14.0 | 10.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 300.0 | PVC | 2500.0 | 900 | 0 | 0 | no | — | — | Submersible Pump | Grandfoss | 15.0 | 180.0 | Generator | CEOLMO | 45.0 | — | — | good | — | yes | Colorless and odorless | 31.5 | 7.81 | 1800.0 | 895.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | no | — | — | — | UNICEF | 15/09/2021 | 1. Construction of elevated water tank | 1. Fancing. 2. Installation of solar power. 3. Fuel supporting. | — | — |
7423 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursaalah | — | Community | 10/03/2006 | Bursaalax water company BH 1 | — | 7.1847943 | 47.2331085 | 364.0 | — | 7 | — | urban | yes | — | Yes | — | 14000 | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 12.5 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 138.0 | Galvanised Steel | 4000.0 | 2000 | 3 | — | no | — | — | Submersible Pump | Lowara | 15.0 | 190.0 | Hybrid - Solar/Generator | Parkins | 90.0 | BR-M300 | 31.5 | good | — | yes | Colorless and odorless | 30.0 | 8.25 | 1925.0 | 1289.75 | — | Utility/Local Authority | — | — | — | — | yes | 0.15 | no | — | — | — | Community | 10/03/2021 | 1. Rehabilitation of pump and riser pipes 2. Flashing. | 1. Fancing. 2. Rehabilitation of generator. 3. Construction of new elevated tank. | — | — |
7184 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Kalabayr | 0.2 | Community | 19/03/2011 | Kalabayr BH | — | 7.1906848 | 47.2928613 | 355.0 | — | 1 | — | urban rural | yes | — | Yes | — | 980 | 1650 | — | 2500 | 0.0 | — | 230.0 | pvc | 8.0 | — | 11.5 | 12.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 56.0 | Galvanised Steel | 1500.0 | 20 | 1 | 2 | yes | 7 | 8.0 | Submersible Pump | Lowara | 15.0 | 216.0 | Hybrid - Solar/Generator | Parkins | 45.0 | GCNS_M36V390W | 15.99 | good | — | yes | Colorless and odorless | 29.3 | 7.62 | 2550.0 | 1245.0 | — | Communal | yes | 19/03/2012 | 5 | 0 | yes | 0.05 | yes | — | — | — | NRC | 12/01/2021 | 1. Installation of solar power 2. Rehabilitation of koisks 3. Rehabilitation of pump and riser pipes | 1. Fancing. 2. Rehabilitation of koisks and construction new koisks. 3. Rehabilitation of animal troughts. 4. Rehabilitation rooms. 5. Fuel supporting. | — | — |
7860 | — | Borehole | Somaliland MoWRD | April 24, 2022 | Sanaag | laasqoray | Xingalool /Badhan | 1.0 | — | — | Xingalool Bore Hole2 | — | 9.7553161 | 48.3145481 | 850.0 | — | 2 | — | rural urban | yes | — | Yes | — | 12000 | 1300 | 950 | 17000 | 0.0 | — | 120.0 | gi | 8.0 | 74.0 | 5.0 | 12.0 | 0.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 14.0 | Galvanised Steel | 100.0 | 0 | 2 | 2 | yes | 4 | 10.0 | Submersible Pump | Luwara | 5.0 | 107.0 | Generator | Parkins | 45.0 | — | — | good | Good water supply system | no | — | 26.0 | 7.4 | 3100.0 | 2200.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 0 | 1. Fence _ 30 m cubic 2. New solar pannel Installation. 3. Animal trough rehabilation _3 | — | — |
8031 | — | Dam | Somaliland MoWRD | April 25, 2022 | Sanaag | laasqoray | Fiqifuliye | 1.0 | SDF | — | Dam fiqifuliye | — | 10.0286415 | 47.7605566 | 1052.0 | — | 0 | — | rural urban | yes | — | Yes | — | 1200 | 11500 | 540 | 1790 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 5.0 | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 2.0 | 0 | 5 | 3 | yes | 5 | 10.0 | Submersible Pump | Ground fos 5 | 0.0 | 0.0 | Generator | 0 | 0.0 | — | — | good | Inadequate water supply of system. | no | — | 24.0 | 8.0 | 1500.0 | 1000.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | 1.fencing | 1. Fencing aroound the dam. | — | — |
7525 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Burtinle | 1.5 | UNICEF | 16/03/2020 | Hanad BH 3 | — | 7.646383 | 47.8075501 | 483.0 | — | 3 | — | urban | yes | — | Yes | — | 22000 | — | — | — | — | — | 408.0 | pvc | 8.0 | 244.0 | 12.0 | 18.0 | 69.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 375.0 | PVC | 2500.0 | 3500 | 0 | 0 | yes | 8 | 8.0 | Submersible Pump | Lowara | 22.0 | 360.0 | Hybrid - Solar/Generator | Parkins | 65.0 | BYD400MIK-36 | 43.2 | good | — | yes | Colorless and odorless | 36.2 | 7.32 | 2380.0 | 1205.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | 27/03/2021 | 1. Installation of solar power | 1. Fencing around borehole | — | — |
7177 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Nugaal | burtinle | Godobyar | 1.3 | IRC | 15/03/2021 | Godobyar BH | — | 7.6284364 | 47.6309913 | 452.0 | — | 1 | — | rural urban | yes | — | Yes | — | 14000 | 1200 | — | 5000 | 0.0 | — | 282.0 | pvc | 8.0 | 150.0 | 13.85 | 12.0 | 216.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 34.0 | Stainless Steel | 3000.0 | 25 | 3 | 2 | yes | 6 | 8.0 | Submersible Pump | Lowara | 11.0 | 243.0 | Hybrid - Solar/Generator | Parkins | 45.0 | CN-TY-M350 | 25.2 | good | — | yes | Colorless and odorless | 36.1 | 7.1 | 3100.0 | 1590.0 | — | Communal | yes | 15/03/2021 | 3 | 2 | yes | 0.05 | yes | — | — | — | IRC | 15/03/2021 | 1. Construction of koisks, water tank and animal troughts | 1. Fuel supporting. | — | — |
7985 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Tuulo-xanan | 1.5 | Charity | 12/03/2020 | Tuulo xanan BH | — | 7.4177271 | 47.2246497 | 395.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1400 | — | — | — | — | — | 220.0 | pvc | 8.0 | 92.0 | 7.5 | 10.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 1700.0 | 1 | 3 | 2 | no | — | — | Submersible Pump | — | 11.0 | 195.0 | Generator | Parkins | 45.0 | — | — | good | — | yes | Colorless and odorless | 32.2 | 8.0 | 1870.0 | 928.0 | — | Communal | yes | 12/03/2021 | 5 | 0 | no | — | no | — | — | — | NRC | 12/03/2021 | 1. Construction of new elevated tank. | 1. Fuel supporting. 3. Installation of solar power. 4. Fancing. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France