Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7155 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Buuhoodle | 0.0 | Community | 01/04/2012 | Farah Bulley BH 2 | — | 8.2213759 | 46.3526494 | 631.0 | — | 2 | — | urban rural | yes | — | Yes | — | 2100 | 2000 | 250 | 5200 | 0.0 | — | 374.0 | pvc | 8.0 | — | 8.0 | 20.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 92.0 | PVC | 4500.0 | 220 | 8 | 3 | yes | 12 | 8.0 | Submersible Pump | Lowara | 18.5 | 330.0 | Hybrid - Solar/Generator | Parkins | 65.0 | SZYL-M330-36 | 23.1 | fair | — | yes | Colorless and odorless | 32.6 | 8.15 | 3980.0 | 2388.0 | — | Communal | yes | 01/04/2012 | 3 | 2 | yes | 0.1 | yes | — | — | — | PWDA | 01/01/2022 | 1. Rehabilitation of pump | 1. Installation of submersible pump 22 kW and cables 2. Rehabilitation of riser pipes 3. Extension pipelines 4. Extension and installation extra solar power. 5. Construction of generator room 6. Fancing | — | — |
7119 | — | Borehole | Somaliland MoWRD | March 31, 2022 | Togdheer | buuhoodle | Goljano | 3.0 | Somaliland MoWRD | 31/03/2022 | Goljano borehole | — | 8.6325231 | 46.5708954 | 778.0 | — | 1 | — | rural | yes | — | Yes | — | 72000 | 300 | 100 | 10000 | 0.0 | — | 350.0 | pvc | 8.0 | 150.0 | 5.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 34.0 | Galvanised Steel | 35.0 | 1200 | 0 | 4 | yes | 9 | 9.0 | Submersible Pump | — | 7.0 | 15.0 | Hybrid - Solar/Generator | Lens Italy | 60.0 | Photovoltiac | 415.0 | good | The supply system is automatically functioning simultaneously but the system did not installed to the village | no | — | 35.0 | 7.5 | 900.0 | 5600.0 | — | Communal | yes | 01/06/2021 | 3 | 2 | no | — | yes | — | — | — | NRC | 01/01/2022 | Constructed Water Reservior and installation | Fence and installing water supply system to the village and caretaker room | — | — |
7156 | — | Borehole | Somaliland MoWRD | March 31, 2022 | Togdheer | buuhoodle | Qabri Hulul | 0.2 | IR | 01/01/2016 | Qabri Hull borehole | — | 8.685275 | 46.2782063 | 832.0 | — | 1 | — | rural | yes | — | Yes | — | 2400 | 400 | 0 | 2800 | 0.0 | — | 333.0 | pvc | 8.0 | 270.0 | 15.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 25.0 | 400 | 1 | 8 | yes | 4 | 8.0 | Submersible Pump | Luara | 15.0 | 300.0 | Hybrid - Solar/Generator | JP45 | 45.0 | GPM300 | 300.0 | good | The condition of the solar system and has spare parts | no | — | 36.0 | 7.3 | 1000.0 | 394.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | IR | 01/02/2016 | Construction of new borehole | Rehabilitation of reservoirs and animal trough installation | — | — |
7172 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | WDA | 01/03/1986 | Seemade BH 1 | — | 7.1558815 | 48.6113718 | 186.0 | — | 2 | — | rural urban | yes | — | Yes | — | 3500 | 5000 | 0 | 10000 | 0.0 | — | 200.0 | pvc | 8.0 | — | 14.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 250.0 | — | 1 | 2 | yes | 5 | 8.0 | Submersible Pump | — | 15.0 | 180.0 | Hybrid - Solar/Generator | Parkins | 32.0 | 340Wp | 15.0 | fair | The koisks of this water supply needs rehabilitation | yes | Colorless and odorless | 31.5 | 7.26 | 5460.0 | 2670.0 | — | Communal | yes | 01/03/1990 | 3 | 1 | yes | 0.05 | yes | — | — | — | Agency not specified | 01/02/2017 | Construction of elevated water tank | 1. Construction of new elevated tank. 2. Construction of new kiosks. 3. Rehabilitation and reconstruction of animal thoughts. 4. Construction of new generator room 5. Extension and rehabilitation of pipelines. | — | — |
7216 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 9, 2022 | Sanaag | laasqoray | Cawsane | 8.0 | IR | 01/01/2017 | Cawsane borehole | — | 10.6342557 | 48.7897314 | 772.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3000 | 2000 | — | 7000 | — | — | 205.0 | pvc | 8.0 | 145.0 | 10.0 | 17.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Stainless Steel | 8000.0 | 7 | 3 | 3 | yes | 12 | 9.0 | Submersible Pump | Luwara | — | 153.0 | Hybrid - Solar/Generator | Perkins | 40.0 | BR-M250W | 17.0 | fair | — | no | — | 32.1 | 7.6 | 2150.0 | 1077.0 | — | Communal | yes | 01/01/2018 | 3 | 2 | no | — | yes | — | — | — | NRC | 01/02/2022 | Replacement of main raising pipes and the cable | 1: Pipelines are leaking. 2: Generator room's Roof Rehabilitation. 3: Construction of store room. 4: They need some kind of intervention about the Increased fuel prices. 5: Amergency construction of another borehole due to water demand. 6: Solar power storage( battery) | — | — |
7201 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 21, 2022 | Bari | iskushuban | Timirshe | 0.15 | Community_ | 21/05/2000 | Timirshe borehole 2 | — | 10.5613413 | 50.4252462 | 270.0 | — | 2 | — | rural urban | yes | — | Yes | — | 480 | 200 | — | 400 | — | — | 84.0 | pvc | 8.0 | 40.0 | 3.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | — | 20 | 6 | 3 | yes | 3 | 6.0 | Submersible Pump | Lowara | — | 63.0 | Solar | — | — | — | — | fair | Yield is low. | no | — | 31.0 | 7.7 | 1732.0 | 860.0 | — | Communal | yes | 21/07/2015 | 4 | 3 | yes | 0.03 | yes | — | — | — | CARE Somalia | 01/02/2022 | Replacement of main raising pipes and submersible pump | 1: Generator 2: Rehabilitation of solar power system. | — | — |
8047 | — | Borehole | Somaliland MoWRD | April 1, 2022 | Sool | caynabo | Wadaamogoo | 0.5 | IR | 01/01/2016 | Wadaamogoo borehole1 | — | 8.9309789 | 46.2668218 | 799.0 | — | 4 | — | rural urban | yes | — | Yes | — | 5000 | 3000 | 800 | 15000 | 5.0 | — | 150.0 | pvc | — | 140.0 | 10.0 | 12.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 700.0 | 1000 | 4 | 16 | yes | 3 | 50.0 | Submersible Pump | Laura | 12.0 | 48.0 | Hybrid - Solar/Generator | PERKINS | 45.0 | Yingu solar | 315.0 | good | The supply system is very good and functional | no | — | 36.0 | 7.4 | 1410.0 | 990.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | Somaliland MoWRD | 01/02/2022 | Changed the installation of pipes to new pipes in the system | Pump is old and reduced water yield production so it needs to change it | — | — |
7276 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Bari | bandar_beyla | Falfalax | 1.0 | Natural spring. | — | Falfax spring | — | 8.7729069 | 50.3993004 | 19.0 | — | 1 | — | rural urban | yes | — | No | 2018, hayaan cyclone | 1200 | 150 | — | 2000 | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | — | — | — | — | Concrete/Masonry tank | 22.0 | Stainless Steel | 1500.0 | — | 2 | 2 | yes | 5 | 8.0 | Submersible Pump | Lawara | — | — | Generator | Chinese generator | 37.0 | — | — | poor | The supply system is broken and also the pipes has a rest, and the spring's catchment is totally being destroyed by the cyclone. | no | — | 31.0 | 7.3 | 2400.0 | 1300.0 | — | Communal | yes | 01/02/2012 | 2 | 1 | yes | 0.05 | yes | — | — | — | Muslim Aid | 01/03/2016 | They made 2kiosks, 2 animal troughs and the elevated water tank. | 1: Solar power installation 2: Provision of pump 3: Placement of of all distribution pipes. 4: Rehabilitation of kiosks 5: Rehabilation of elevated water tank in order to stop water leaking. 6: Rehabilitation of animal troughs. | — | — |
7243 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | WDA | 01/03/1986 | Jariiban BH 1 | — | 7.2187338 | 48.8492715 | 150.0 | — | 3 | — | rural urban | yes | — | Yes | — | 21000 | 2000 | 200 | 5000 | 0.0 | — | 145.0 | pvc | 8.0 | 75.0 | 9.5 | 19.0 | — | 2.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 22.0 | Galvanised Steel | 500.0 | — | 5 | 2 | yes | 30 | 12.0 | Submersible Pump | — | 15.0 | 125.0 | Hybrid - Solar/Generator | Parkins | 45.0 | — | — | fair | Needs rehabilitation of kiosks | yes | Colorless and odorless | 29.3 | 7.61 | 4610.0 | 2270.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | yes | — | — | — | World Vision | 01/03/2016 | Construction of elevated water tank | 1. Rehabilitation and reconstruction of ground water tank. 2. Construction of new kiosks 4. Rehabilitation of animal thoughts. 5. Rehabilitation and extension of pipelines. | — | — |
7251 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Bari | bandar_beyla | Dhalinbaar | 1.0 | Other | — | Dharinbaar spring | — | 8.9321246 | 50.4732425 | -5.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1200 | 800 | — | 3000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 1000.0 | 1 | 8 | 1 | yes | 5 | 5.0 | Submersible Pump | Lowara | — | — | Generator | Perkins | 45.0 | — | — | poor | The yield of the spring is very low, it needs rehabilitation in order to increase its yield | no | — | 27.0 | 7.0 | 3000.0 | 1500.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | Puntland MoEMW | 01/03/2019 | Supplied of electric cable | Replecement of pump Replacement of electric cable which acess generator Construction of animal troughs Installation of solar power system. Replacement of all rusted distribution pipe lines Rehabilitation of elevated water tank in order to stop water leaking. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France