Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7986 Dug Well Galmudug Ministry of Energy and Water Resources April 16, 2022 Mudug galkayo Ceel Akhwaan 0.5 community CeeAkhwaan sw 6.6934195 47.3809678 275.0 1 rural yes Yes 2000 700 5230 18.0 15.0 Concrete/Masonry tank 0.0 Galvanised Steel 0.0 0 No Pump no 0.0 8.11 1855.0 956.0 Communal
8019 Dug Well Galmudug Ministry of Energy and Water Resources April 10, 2022 Mudug galkayo Dhoobocade 1.0 Community dhobocade sw 6.6320073 47.6070084 245.0 0 rural yes Yes 900 3500 36000 20.0 8.5 0.0 Galvanised Steel 0.0 0 0 0 no No Pump poor no no 32.6 8.19 1590.0 1110.0 Communal no
8020 Dug Well FGS Ministry of Energy and Water Resources April 22, 2022 Bakool ceel_barde Celbarde Agency not specified 01/01/2004 Eldheer 4.826506 43.658075 0.0 2 no Yes 5400 15.0 7.0 3.0 fair no 7.1 1590.0 Improve - Installing Solar pump
7970 Dug Well Puntland Ministry of Energy Minerals and Water Feb. 21, 2022 Bari qardho Yibaayil 0.5 Community 20/02/1900 Yibaayil dug well 8.9940942 48.8926948 632.0 3 rural urban yes Yes 30000 27000 150000 3.0 2.0 2.5 12.0 1.0 Concrete/Masonry tank 20.0 Galvanised Steel 600.0 5000 3 yes 17 10.0 Submersible Pump 3.0 Solar Dusol-160W 1.6 poor There is no generator. There is a problem of solar power system. There is no good main raising pipes There is no main distribution pipe lines. no 31.0 6.8 2000.0 1000.0 Communal yes 14/02/2008 5 2 no no Community 01/09/2021 Digged new well New pipelines Concrete top Cover of the well Pump, solar. New well to be digged Powerful solar system Bigger capacity water tank Extended pipeline and to be renewed Rehabilitation of the solar system Kiosks to be rehabilitated and New kiosks. Curent water tank needs immediately Rehabilitation.
7971 Dug Well Puntland Ministry of Energy Minerals and Water Feb. 20, 2022 Bari qardho Baqbaq 0.2 Community 19/02/1900 Ceeldoog dug well 8.7006557 50.0704293 296.0 2 rural urban yes Yes 60000 3000 12000 18.0 17.5 2.25 24.0 Other Galvanised Steel 1600 2 yes 5 9.0 No Pump poor No main raising pipe lines No pipe line distribution No pump No casing No elevated water tank. no 29.0 6.5 2000.0 1000.0 Communal yes 21/03/2018 6 2 no no Community_e 14/01/2019 Construction of animal water troughs Construction of protection reinfoced concrete cover which protect the well for the sediments soil. Digging the deep of the well intro extra meters Main raising pipes Main distribution pipe lines Construction of elevated water tank. Construction of water kiosks and animal water troughs. Pupm, casing, Generator, and solar power system.
7973 Dug Well Puntland Ministry of Energy Minerals and Water April 9, 2022 Sanaag laasqoray Midigale 5.0 Community_ 08/09/2010 Midigale dug well2 10.6892739 48.6736626 799.0 2 rural urban yes Yes 2520 500 3000 1.0 10.0 7.0 11.0 Concrete/Masonry tank 28.0 Galvanised Steel 700.0 4 2 no Submersible Pump Hybrid - Solar/Generator poor Yield is low. Distributions pipes are rusted. No sufficient water kiosks in the village. Distribution pipe lines are disconnected due to the floods. no 32.1 7.5 1987.0 995.0 Communal yes 11/05/2000 7 3 no no Puntland MoEMW 12/05/2017 Placement of distribution pipe lines. Construction of elevated water tank. 1: Construction of generator room 2: Digging the deep of the well in order to increase the yield of well. 3: Generator 4: Placement of distribution pipe lines. 5: Rehabilitation of animal water troughs. 5: Rehabilitation of water kiosks. 6: Amergency construction of borehole
8177 Dug Well Somaliland MoWRD May 2, 2022 Woqooyi Galbeed hargeisa Dhaboolaq 1.3 Private 24/09/2012 Dhaboolaq 10 9.5147 43.8801981 1359.0 20 rural yes Yes 250 3000 1000 2000 0.0 9.0 8.0 30 0 0 no No Pump poor There is no supply system no 28.0 8.08 641.0 447.0 Private/Individual no no Reservoir, kiosks, animal troughs, and supply system.
7977 Dug Well Galmudug Ministry of Energy and Water Resources April 16, 2022 Mudug galkayo ceelakhwan2 0.8 ceelakhwan2 6.6872167 47.3820383 275.0 0 rural yes Yes 300 1000 2000 18.0 16.0 1.0 Concrete/Masonry tank 0.0 Other 0.0 0 0 0 no No Pump poor no 36.4 8.69 1920.0 975.0 Communal
7978 Dug Well Puntland Ministry of Energy Minerals and Water March 2, 2022 Bari bandar_beyla Dhuur 0.5 Community_ 22/08/2016 Dhuur dug well 9.245295 50.6040833 95.0 4 rural yes Yes 1800 900 3000 9.0 5.0 yes 26 10.0 no 30.3 7.2 1920.0 965.0 Community_e 23/08/2020 Cleaning of the dug well 1: Construction of storage water tank 2: Raising pipes and submersible pump. 3: Animal water troughs 4: Distribution pipe lines 5: Solar and generator. 6: extension of of distribution pipe lines in to the village 7: Construction of cover protection of the dug well
8174 Dug Well Somaliland MoWRD May 2, 2022 Woqooyi Galbeed hargeisa Dhaboolaq 2.0 Private 23/11/2018 Dhaboolaq 2 9.5116299 43.8887402 1345.0 1 rural yes Yes 200 1500 150 500 10.0 8.0 7.0 8.0 4.0 9.0 30 0 0 no No Pump poor No supply system no 28.0 7.7 661.0 468.0 Private/Individual no no

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors