Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7343 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 31, 2022 | Sool | las_caanood | Karin korfood | 0.7 | ISRC | 31/03/2012 | Karinkarfood BH | — | 8.1271024 | 47.7510983 | 698.0 | — | 1 | — | urban rural | yes | — | Yes | — | 6300 | 1200 | 500 | 13000 | 0.0 | — | 290.0 | pvc | 8.0 | — | 4.0 | 12.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 1000.0 | 15 | 2 | 3 | yes | 30 | 8.0 | Submersible Pump | Lowara | 7.5 | 260.0 | Hybrid - Solar/Generator | Parkins | 60.0 | 300w | 18.0 | fair | — | yes | Colorless and odorless | 27.8 | 7.5 | 4850.0 | 2423.0 | — | Communal | yes | 31/03/2014 | 6 | 3 | yes | 0.1 | yes | — | — | — | — | — | — | Drilling new borehole during to trucking much. 1. Rehabilitation of solar panels 2. Rehabilitation of animal troughts 3. Trucking point. 4. Construction of new elevated tank. 5. Rehabilitation of generator and caretaker rooms 7. Pipelines rehabilitation. 7. Fancing of borehole | — | — |
7344 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Raasqabobe | 1.5 | Community | 06/03/2015 | Raasqaboobe BH | — | 6.8593023 | 47.4473214 | 269.0 | — | 20 | — | urban rural | yes | — | Yes | — | 2000 | 14 | — | 100 | 40.0 | — | 160.0 | pvc | 8.0 | — | 24.0 | 8.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 120.0 | Galvanised Steel | 600.0 | — | — | 2 | no | — | — | Submersible Pump | — | 11.0 | 130.0 | Generator | Parkins | 40.0 | — | — | poor | Needs full rehabilitation | yes | Colorless and odorless | 28.5 | 7.95 | 3240.0 | 1620.0 | — | Communal | yes | 06/03/2015 | 3 | 0 | yes | 0.05 | yes | — | — | — | — | — | — | 1. Rehabilitation of generator 2. Construction of new kiosks. 3. Rehabilitation of pipelines. | — | — |
7345 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Tuur dibi | — | Community | 08/03/2020 | Tuur dibi BH | — | 7.0233423 | 46.9627436 | 346.0 | — | 1 | — | rural | yes | — | Yes | — | 1750 | 2500 | — | 3000 | 0.0 | — | 226.0 | pvc | 8.0 | — | 33.0 | 19.0 | — | 0.2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 50.0 | 250 | 2 | 2 | yes | 18 | 8.0 | Submersible Pump | — | 15.0 | 172.0 | Hybrid - Solar/Generator | Parkins | 30.0 | BYD400MIK_36 | 22.4 | good | — | yes | Colorless and odorless | 31.8 | 7.51 | 1810.0 | 898.0 | — | Communal | yes | 08/03/2020 | 3 | 1 | yes | 0.05 | yes | — | — | — | GPLZ and PWDA | 08/01/2022 | 1. Construction of new elevated tank ( GPLG). 2. installation of solar power and construction new koisks and animal thoughts ( PWDA). | plumbing tools | — | — |
7346 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 19, 2022 | Sanaag | ceerigaabo | Balibusle | 5.0 | — | — | Balibusle borehole | — | 10.0501626 | 48.586565 | 1023.0 | — | 1 | — | urban rural | yes | — | Yes | — | 10800 | 1500 | — | 6000 | — | — | 350.0 | pvc | 8.0 | 300.0 | 8.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | — | — | — | 2 | yes | 7 | 9.0 | Submersible Pump | — | — | — | Generator | LTG185G1 | 30.0 | — | — | fair | The village has no water supply system. No water kiosks in the village | no | — | 32.1 | 7.1 | 3930.0 | 1977.0 | — | Communal | no | — | — | — | yes | 0.04 | yes | — | — | — | GUMCO | 13/02/2021 | Replacement of distribution pipe line | 1: Amergrncy replacement of main raising pipes and submersible pump 2: Generator 3: Solar 4: Construction of another elevated water tank. 5: Construction of 2 animal water troughs. 6: Replacement of rusted distribution pipes. 7: Construction of caretaker room. 8: Construction of another borehole due to water demand | — | — |
7347 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 13, 2022 | Sanaag | ceerigaabo | Buraan | 0.5 | Kanoko | 01/01/1988 | Buraan borehole 1 | — | 10.2111741 | 48.7745235 | 942.0 | — | 5 | — | rural urban | yes | — | Yes | — | 4500 | 300 | — | 500 | — | — | 36.0 | pvc | 8.0 | 7.0 | 4.0 | 8.0 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Galvanised Steel | — | 300 | 1 | 4 | yes | 8 | 8.0 | Submersible Pump | — | — | 34.0 | Hybrid - Solar/Generator | Perkins | 33.0 | DS60250W | 9.0 | fair | Buraan borehole1 and 2 are connected same water storage tanks, same solar and generator, same animal troughs, same distribution pipes Both boreholes works same hours which is equal 8+8 = 16 hours. | no | — | 31.9 | 7.4 | 1581.0 | 775.0 | — | Communal | yes | 25/05/1989 | 4 | 2 | yes | 0.03 | yes | — | — | — | ACTED | 26/08/2020 | Construction of 1 room Generator Rehabilitation of 3 solar panels. Construction of storage water tank. Replacement of main raising pipes and submersible pump. | 1: Amergency replacement of main raising pipes and submersible pump 2: Generator. 3: Replacement of rusted distribution pipes 4: Construction of 1 elevated water tank. 5: Solar power storage (battery). | — | — |
7348 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 22, 2022 | Bari | qardho | Xaajikhayr | 1.0 | UNICEF | 22/12/2021 | Xaajikhayr borehole | — | 8.989235 | 49.2686459 | 620.0 | — | 1 | — | rural urban | yes | — | Yes | — | 18000 | 7000 | — | 45000 | 0.25 | — | 312.0 | pvc | 8.0 | 102.0 | 16.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 1200.0 | 3000 | 1 | 2 | yes | 10 | 45.0 | Submersible Pump | Lawara | — | 294.0 | Hybrid - Solar/Generator | Coelmo | 50.0 | Dusol | 26.5 | good | — | no | — | 26.0 | 7.0 | 4050.0 | 1950.0 | — | Communal | no | — | — | — | yes | — | yes | — | — | — | KAALO Relief and Development | 22/12/2021 | Solar power installation | Water supply system of the whole village Construction of extra water kiosks 1000 meter of pipe line of the whole the village. Water purification. | — | — |
7349 | — | Borehole | Somaliland MoWRD | May 21, 2022 | Awdal | borama | Dilla | 1.5 | Not specified | 07/01/2015 | Dilla BH 3 | — | 9.7645432 | 43.3415877 | 1583.0 | — | — | — | rural urban | yes | — | Yes | — | 3500 | 300 | 2000 | 4000 | — | — | 100.0 | gi | 8.0 | 85.0 | 8.0 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 33.0 | PVC | 300.0 | 500 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 11.0 | 75.0 | Hybrid - Solar/Generator | Perkin | 37.0 | Axitec | 3.5 | fair | The supply is connected to the reservpir. And there is no public kiosks and animal troughs. | no | — | 30.0 | 7.45 | 2980.0 | 2070.0 | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | — | — | — |
7742 | — | Borehole | FGS Ministry of Energy and Water Resources | May 17, 2022 | Lower Shabelle | wanla_weyn | Garas uuleey | — | Somali Diasporer | 12/12/2014 | Garas Uuleey | — | 2.6075 | 45.00444 | — | — | — | — | urban | yes | — | Yes | — | 8950 | — | — | — | — | — | 153.0 | pvc | 8.0 | 27.0 | 11.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | — | — | 1500 | — | — | — | — | — | Submersible Pump | Elect Submersible pump | — | 115.0 | — | — | — | — | — | good | — | no | — | — | — | — | — | — | Communal | yes | — | — | — | yes | 0.005 | no | — | — | — | — | — | — | Full Rehabilitation | — | — |
7351 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 10, 2022 | Mudug | galkayo | Qarqora | 0.4 | GSA | 07/11/2009 | Qarqora | — | 6.740379 | 47.7011535 | 274.0 | — | 0 | — | rural | yes | — | Yes | — | 15000 | 700 | — | 60000 | — | — | 240.0 | pvc | 10.0 | — | 18.0 | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 187.0 | 180 | 1 | 3 | yes | 6 | 9.0 | Submersible Pump | not specified | — | 138.0 | Hybrid - Solar/Generator | perkin | 30.0 | 300 | 24.0 | poor | — | no | — | 26.7 | 7.86 | 3760.0 | 1875.0 | — | — | — | — | — | — | yes | 0.0045 | yes | — | — | — | Agency not specified | store house | MFA | — | — | — |
7352 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 30, 2022 | Galgaduud | cabudwaaq | balanballe | 1.0 | former government of somalia | 26/08/1964 | ceel Roob Da ay | — | 5.7677968 | 45.7651029 | 387.0 | — | 0 | — | rural | yes | — | Yes | — | 3800 | 9000 | — | 25000 | — | — | 160.0 | pvc | 8.0 | — | 14.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | — | 700 | 0 | 1 | no | — | — | Submersible Pump | granfos | — | 102.0 | Generator | perkin | 40.0 | — | — | poor | water supply conditions not good for needs rehabilitation of: 1. water tanks 2. Distribution pipelines 3. Construction of 100 meter cubic water tank | no | — | 30.8 | 7.0 | 1395.0 | 690.0 | — | Communal | yes | — | 3 | 1 | no | — | yes | — | — | — | — | — | — | — | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France