Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7666 Borehole FGS Ministry of Energy and Water Resources April 26, 2022 Lower Shabelle afgooye Elasha GTZ 17/12/1979 Elasha biyaha 26 2.09064 45.213915 urban yes Yes 7200 200.0 25.0 36.0 24.0 Concrete/Masonry tank 30.0 1200 Submersible Pump Elect Submersible pump 175.0 fair no Private/Individual yes 0.02 Rehabilitation
7552 Borehole FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Muuri 1.0 Italian Government 10/11/1985 Muuri 2.1522677 45.3763316 70.0 rural yes Yes 2890 120.0 gi 8.0 6.0 Steel tank 15.0 Galvanised Steel 35.0 210 1 no Submersible Pump Lowara 5.5kw 103.0 Generator Gangfa125 poor It's in a bad situation no Other yes 0.05 no Private 10-Dec-19 Rehabilitation of elevated water tank and change submersible pump Construction of elevated water tank, generator and caretaker room fence and gate, supply of Generator and solar system.
7553 Borehole FGS Ministry of Energy and Water Resources March 15, 2022 Middle Shabelle balcad Maqaar carees 0.0 IR 15/10/2018 Shabelle 2 2.3512984 45.3989917 94.0 urban yes Yes 3350 120.0 gi 8.0 90.0 4.0 Concrete/Masonry tank 35.0 PVC 80.0 560 5 3 yes 4 8.0 Submersible Pump Lowara 7.5kw 40.0 96.0 Generator Duos 30.0 fair It's in a good condition no Private/Individual yes 0.05 no Owner 16-Aug-21 Change the submersible pump, Rehabilitation of animal troughs Rehabilitation of animal troughs, supply of Generator, construction of elevated water tank.
7576 Borehole Puntland Ministry of Energy Minerals and Water March 27, 2022 Nugaal garowe Garowe 1.5 NUWACO Water Company 27/03/2021 Ligle BH 3 8.3675717 48.4510035 436.0 5 urban yes Yes 9100 160.0 pvc 8.0 21.0 24.0 1.3 Concrete/Masonry tank 70.0 PVC 7000.0 1300 0 0 no Submersible Pump Lowara 30.0 60.0 Generator Parkins, Iveco 270.0 good no Private-Public-Partnership yes 0.05 no NUWACO Water Company 27/03/2022 1. Rehabilitation of riser pipes
7565 Borehole FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Hareer Madowe 1.5 Private 11/10/2016 Hareer Madowe 2.2332162 45.3958659 146.0 rural yes Yes 3860 150.0 gi 8.0 8.0 Concrete/Masonry tank 30.0 Galvanised Steel 60.0 320 1 no Submersible Pump Lowara 15kw 80.0 Generator Duos 30.0 fair Good no Private/Individual yes 0.05 no Private 11-Aug-20 Installation of Solar system, submersible pump and GI pipes. Construction of elevated water tank, animal troughs, fence and gate, water kiosk, supply of Generator and New BH.
7568 Borehole FGS Ministry of Energy and Water Resources March 15, 2022 Middle Shabelle balcad Horseed 0.0 Former Somali Government 14/07/2013 DurDur 2.3697699 45.3819187 105.0 urban yes Yes 3860 130.0 gi 8.0 8.0 Concrete/Masonry tank 35.0 PVC 60.0 600 1 1 yes 3 15.0 Submersible Pump Lawara 10.5kw 45.0 75.0 Generator Meccalte 30.0 poor In a good no Private/Individual yes 0.05 no ICRC 15-Oct-15 Construction of Generator room and caretaker room, water kiosks and animal water troughs. Supply of Generator, elevated water tank, pipeline extension, solar system and full rehabilitation.
7654 Borehole FGS Ministry of Energy and Water Resources April 26, 2022 Lower Shabelle afgooye Elasha GTZ 21/06/1979 Elasha biyaha 24 2.0846 45.20825 urban yes Yes 7200 200.0 25.0 36.0 24.0 Concrete/Masonry tank 30.0 1280 Submersible Pump Elect Submersible pump 175.0 fair no Private/Individual yes 0.02 Rehabilitation
7598 Borehole Somaliland MoWRD May 4, 2022 Awdal borama Camuud 4.0 SHABA 01/04/2020 Shaaba 23 9.9499017 43.2256813 1377.0 urban yes Yes 35000 190.0 pvc 8.0 80.0 40.0 20.0 Concrete/Masonry tank PVC 2000.0 2570 0 0 no Submersible Pump Granfoc 50.0 110.0 Generator Dose 200.0 fair All boreholes are connected to a main storage tank with a volume of 400 metre cupic. And the supply is good. no 30.0 7.3 1265.0 400.0 Private-Public-Partnership yes 0.03 no
7574 Borehole FGS Ministry of Energy and Water Resources March 15, 2022 Middle Shabelle balcad Waabari 0.0 Saar interpress (garmany government) 15/10/1977 Alkowthar 2.3574048 45.3897135 103.0 urban yes Yes 3950 120.0 gi 60.0 20.0 Concrete/Masonry tank 100.0 Galvanised Steel 200.0 580 1 0 yes 8 10.0 Submersible Pump Lowara 15kw 65.0 60.0 Generator Perkins 30.0 fair It's in a good condition no Private/Individual yes 0.05 no UNDP 15-Sep-02 Pipeline extension and construction of water kiosks New BH and supply of Generator
7613 Borehole Puntland Ministry of Energy Minerals and Water April 5, 2022 Bari bossaso Girible 4.0 GUMCO 07/08/2019 Shanle borehole 11.2393676 49.2127934 44.0 14 urban yes Yes 77.0 pvc 8.0 50.0 13.0 21.0 Steel tank PVC Submersible Pump Lowara 76.0 Generator Eveco 120.0 no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 11/03/2022 Replacement of main raising pipes and submersible pump 1: Solar power system. 2: Pipes and submersible pump

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors