Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7511 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Galkacayo | 1.2 | UNHRC | 06/03/2015 | Salaama IDP 2 BH | — | 6.8555099 | 47.4437124 | 268.0 | — | 20 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 210.0 | pvc | 8.0 | 84.0 | 15.0 | 16.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 81.0 | PVC | 4200.0 | — | 9 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 126.0 | Hybrid - Solar/Generator | Parkins | 65.0 | 300_73M | 22.5 | fair | This supply has generator problem, so needs rehabilitation of generator | yes | Colorless and odorless | 29.5 | 7.8 | 3370.0 | 1667.0 | — | Communal | yes | 06/03/2015 | 4 | 2 | yes | 0.05 | no | — | — | — | Agency not specified | 06/03/2018 | Construction of elevated water | 1. Rehabilitation of pipelines 2. Rehabilitation of pump 3. Rehabilitation of generator ( Emergency). | — | — |
7512 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | NUWACO Water Company | 27/03/2013 | Taakulo BH | — | 8.3952759 | 48.4655597 | 452.0 | — | 10 | — | urban | yes | — | Yes | — | 9100 | — | — | — | — | — | 90.0 | pvc | 8.0 | 40.0 | 17.0 | 8.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 777.0 | PVC | 2500.0 | 1500 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 11.0 | 78.0 | Generator | Parkins | 60.0 | — | — | good | — | yes | Colorless and odorless | 34.8 | 7.32 | 3315.0 | 1652.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | — | — | — |
7513 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | UNICEF | 05/03/2003 | Galkacayo water company BH 2 | — | 6.7940122 | 47.4114582 | 251.0 | — | 20 | — | urban | yes | — | Yes | — | 77000 | — | — | — | — | — | 220.0 | pvc | 12.0 | — | 45.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 750.0 | PVC | 5000.0 | 1600 | — | — | no | — | — | Submersible Pump | Lowara | 22.0 | 120.0 | Generator | 350 | 350.0 | — | — | — | — | yes | Colorless and odorless | 27.6 | 7.61 | 3300.0 | 1635.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Rehabilitation of elevated water tank | — | — |
7514 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | 2.0 | NUWACO Water Company | 27/03/2019 | Ligle BH 1 | — | 8.3646775 | 48.4496099 | 453.0 | — | 4 | — | urban | yes | — | Yes | — | 9100 | — | — | — | — | — | 160.0 | pvc | 8.0 | 11.0 | 40.0 | 24.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | 5000.0 | 1300 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 22.0 | 60.0 | Generator | Parkins, Iveco | 250.0 | — | — | good | — | yes | Colorless and odorless | 31.8 | 7.6 | 3230.0 | 1613.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | — | — | — |
7515 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Ceelgerdi 2 | — | Community | 14/03/2014 | Ceelgerdi BH 2 | — | 7.2318127 | 47.5488879 | 344.0 | — | 1 | — | rural | yes | — | Yes | — | 350 | 500 | — | 1500 | 4.0 | — | 190.0 | pvc | 8.0 | 135.0 | 13.3 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 700.0 | 7 | 0 | 2 | yes | 7 | 8.0 | Submersible Pump | Lowara | 11.0 | 145.0 | Generator | Parkins | 45.0 | — | — | fair | Supply needs rehabilitation | yes | Colorless and odorless | 34.1 | 7.81 | 3110.0 | 1550.0 | — | Communal | yes | 14/03/2017 | 2 | 1 | yes | 0.05 | no | — | — | — | — | — | — | 1. Construction of koisks 2. Construction of new elevated tank 3. Installation of solar power 4. Rehabilitation of pump and riser pipes | — | — |
7677 | — | Borehole | FGS Ministry of Energy and Water Resources | April 26, 2022 | Lower Shabelle | afgooye | Elasha | — | GTZ | 15/05/1979 | Elasha biyaha 16 | — | 2.06861 | 45.19313 | — | — | — | — | urban | yes | — | Yes | — | 7200 | — | — | — | — | — | 200.0 | — | — | 25.0 | 36.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | — | — | 800 | — | — | — | — | — | Submersible Pump | Elect Submersible pump | — | 175.0 | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.02 | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
7516 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Mudug | galkayo | Bacaadweyn | 0.8 | Community | 14/03/2022 | Bacaadweyn water company BH | — | 7.21072 | 47.5212386 | 349.0 | — | 2 | — | rural urban | yes | — | Yes | — | 21000 | 800 | — | 1200 | — | — | 235.0 | pvc | 8.0 | 125.0 | 22.0 | 18.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 250.0 | PVC | 4000.0 | 1800 | 5 | 2 | yes | 25 | 8.0 | Submersible Pump | — | 22.0 | 171.0 | Hybrid - Solar/Generator | Parkins | 60.0 | BYD335PK-36 | 33.5 | good | — | yes | Colorless and odorless | 29.2 | 7.81 | 2895.0 | 1435.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | no | — | — | — | DRC | 14/03/2020 | 1. Installation of solar power. | 1. Installation of generator 2. Extension pipelines 3. Rehabilitation of pipes 4. Rehabilitation of steel tank, because its corrosive. | — | — |
7517 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | 1.5 | NUWACO Water Company | 27/03/2019 | Ligle BH 2 | — | 8.3643642 | 48.4499869 | 436.0 | — | 4 | — | urban | yes | — | Yes | — | 9100 | — | — | — | — | — | 160.0 | pvc | 8.0 | 11.0 | 40.0 | 24.0 | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | PVC | 10000.0 | 1300 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 18.5 | 60.0 | Generator | Parkins | 150.0 | — | — | good | — | yes | Colorless and odorless | 32.0 | 7.4 | 2875.0 | 1435.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | — | — | — |
7518 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Mudug | galkayo | Xarfo | — | WDA | 15/03/1986 | Xarfo BH 1 | — | 7.3554649 | 47.6261302 | 382.0 | — | 4 | — | urban rural | yes | — | Yes | — | 6300 | 950 | — | 2000 | 0.0 | — | 196.0 | pvc | 8.0 | 45.0 | 12.0 | 20.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 140.0 | PVC | 4000.0 | 900 | 1 | 4 | yes | 40 | 8.0 | Submersible Pump | Lowara | 15.0 | 165.0 | Hybrid - Solar/Generator | Parkins | 45.0 | JY400M72-H | 24.0 | fair | — | yes | Colorless and odorless | 32.8 | 7.28 | 2845.0 | 1435.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Rehabilitation of generator 2. Construction of koisks 3. Extension pipelines | — | — |
7519 | — | Borehole | Somaliland MoWRD | March 29, 2022 | Awdal | zeylac | Zaylac borehole | 12.0 | International Fund for Agricultural Development | 15/09/2013 | Zeylac borehole | — | 11.32589 | 43.37519 | — | — | — | — | urban rural | yes | — | Yes | — | 10000 | 2500 | 0 | 10000 | 0.0 | — | 39.0 | pvc | 8.0 | 13.0 | 5.0 | 20.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 104.0 | Other | 1400.0 | 220 | 4 | 3 | yes | 4 | 9.0 | Submersible Pump | Granfoz | 3.7 | 29.0 | Hybrid - Solar/Generator | Perkins | 40.0 | S10 spp | 5250.0 | fair | The water supply system operates whole the year around starting from the espalishment up to now. | no | — | 37.2 | 7.5 | 2800.0 | 1960.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | Safe the childreen international (SCI) | 29/03/2022 | Contruction of rcc tank, and generator room. | Provision of 11 KW submersible pump, and replacement of solar panels. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France