Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
197 | BHBRBO002 | Borehole | Puntland_PWDA | Nov. 7, 2019 | Bari | Bossaso | Qaw | 5.0 | Kuwait Government | 04-08-12 | Qaw1 | — | 11.2097 | 48.9874 | 22.0 | 4.9 | 2 | 73108817572.jpg | Urban | Yes | — | Yes | — | — | — | — | — | — | — | 36.0 | — | — | — | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 6000.0 | 170 | 4 | 1 | No | — | — | Submersible Pump | Lowara 7.5 | 12.0 | 30.0 | Generator | Dauze 35 | 35.0 | — | — | Good | Good | No | — | 29.0 | — | 3100.0 | 1390.0 | — | Communal | — | 03-05-12 | 9 | 2 | Yes | 0.026 | No | — | — | — | CARE Somalia | GI Class C. Pump 7.5 | 2018-07-03 | Solar power, Tank 60cbm, pipeline 2000, | — | Strategic Water Sources Survey – WSS_NATl |
7620 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | April 5, 2022 | Bari | bossaso | Madaxtooyo | 5.0 | GUMCO | 12/09/2019 | Madaxtooyo dugwell 2 | — | 11.2800083 | 49.2059333 | -2.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 27.0 | 23.0 | 38.0 | 21.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 26.0 | Generator | Perkins | 165.0 | — | — | good | — | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | yes | — | — | — | GUMCO | 05/01/2022 | Replacement of main rasing pipes and submersible pump | 1: Extention of pipe line 2: Construction of storage water tank 3: Solar power system | — | — |
196 | BHBRBO001 | Borehole | Puntland_PWDA | Nov. 7, 2019 | Bari | Bossaso | Qaw | 5.0 | Kuwait Government | 03-07-12 | Qaw2 | — | 11.2091 | 48.9855 | 21.0 | 4.9 | 2 | 73110271990.jpg | Rural | Yes | — | Yes | — | — | — | — | — | — | — | 60.0 | — | — | — | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 6000.0 | 170 | 4 | 1 | No | — | — | Submersible Pump | Lowara 11 | 12.0 | 48.0 | Generator | Perkins 30 | 30.0 | — | — | Good | Good | No | — | 28.0 | — | 3200.0 | 1310.0 | — | Communal | — | 03-07-12 | 9 | 2 | Yes | 0.026 | No | — | — | — | — | — | 2019-11-07 | Solar power intalation | — | Strategic Water Sources Survey – WSS_NATl |
7622 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | April 5, 2022 | Bari | bossaso | Madaxtooyo | 5.0 | GUMCO | 06/08/2017 | Madaxtooyo borehole 1 | — | 11.2804433 | 49.2052 | -2.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 21.0 | 19.0 | 38.0 | 21.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 21.0 | Generator | Perkins | 165.0 | — | — | good | — | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | — | — | — | — | GUMCO | 05/02/2022 | Replacement of main raising pipes and submersible pump | Pipes and submersible pump installation of solar power system Construction of water tank | — | — |
7839 | — | Borehole | Somaliland MoWRD | April 1, 2022 | Sool | caynabo | Wadaamogoo | 5.0 | Private | 01/01/2017 | Qoorweyn borehole 2 | — | 8.9618504 | 46.2522607 | 816.0 | — | 2 | — | rural | yes | — | Yes | — | 2000 | 1200 | 0 | 3000 | 11.0 | — | 110.0 | pvc | 8.0 | 66.0 | 15.0 | 5.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 300.0 | 500 | 1 | 2 | yes | 5 | 45.0 | Submersible Pump | Laura | 15.0 | 66.0 | Hybrid - Solar/Generator | Perkins | 45.0 | Photovoltiac | 22.5 | good | The supply system is good but kiosks and animal troughs are very limited | no | — | 36.0 | 8.2 | 3500.0 | 2700.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | To increase kiosk and animal troughs and installation of new pipes | — | — |
8065 | — | Borehole | Somaliland MoWRD | May 10, 2022 | Awdal | borama | Holhol | 5.0 | Jaamac yuusuf BH | 10/01/2021 | Jamaac yuusuf BH | — | 9.9209746 | 43.1327314 | 1463.0 | — | — | — | rural | yes | — | Yes | — | — | — | — | — | — | — | 115.0 | pvc | 8.0 | 70.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 6.0 | PVC | 700.0 | — | 0 | 0 | no | — | — | Submersible Pump | Granfoc | 15.0 | 92.0 | Solar | — | — | Dos | 6.8 | fair | The supply is not connected well trogh the farm. | no | — | 30.0 | 8.8 | 1340.0 | 966.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
8408 | — | Borehole | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bakool | tayeeglow | Tieglow | 5.0 | Community | — | Waranyaa | — | 3.854167 | 44.3409 | — | — | — | — | rural | no | 10 | No | Lack of water | 500 | 300 | 200 | 2 | 1.0 | — | 97.0 | pvc | 7.0 | 57.0 | 9.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | — | — | — | 3 | yes | 0 | 4.0 | Surface mounted Pump | — | 3.0 | — | Electricity Grid | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | yes | — | 3 | 3 | no | — | — | — | — | — | — | — | — | — | — | — |
2272 | BHWGHA165 | Borehole | SWALIM_HGS | Dec. 26, 2011 | Woqooyi Galbeed | Hargeisa | — | 5.0 | — | — | Malowle 1 | — | 9.5792 | 43.90842 | 1376.0 | — | — | — | — | — | — | No | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | No Pump | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Somaliland MoWRD - Ministry of Water Resources Development | — | — | — | — | Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP |
7973 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | April 9, 2022 | Sanaag | laasqoray | Midigale | 5.0 | Community_ | 08/09/2010 | Midigale dug well2 | — | 10.6892739 | 48.6736626 | 799.0 | — | 2 | — | rural urban | yes | — | Yes | — | 2520 | 500 | — | 3000 | 1.0 | — | — | — | — | — | — | — | — | — | 10.0 | 7.0 | — | 11.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 700.0 | — | 4 | 2 | no | — | — | Submersible Pump | — | — | — | Hybrid - Solar/Generator | — | — | — | — | poor | Yield is low. Distributions pipes are rusted. No sufficient water kiosks in the village. Distribution pipe lines are disconnected due to the floods. | no | — | 32.1 | 7.5 | 1987.0 | 995.0 | — | Communal | yes | 11/05/2000 | 7 | 3 | no | — | no | — | — | — | Puntland MoEMW | 12/05/2017 | Placement of distribution pipe lines. Construction of elevated water tank. | 1: Construction of generator room 2: Digging the deep of the well in order to increase the yield of well. 3: Generator 4: Placement of distribution pipe lines. 5: Rehabilitation of animal water troughs. 5: Rehabilitation of water kiosks. 6: Amergency construction of borehole | — | — |
7773 | — | Borehole | FGS Ministry of Energy and Water Resources | April 9, 2022 | Lower Juba | afmadow | Mowlid laqay borehole | 5.0 | Towfiqwelfare | 09/04/2018 | Miwlidkaqay | — | 0.4050787 | 41.0249018 | 51.0 | — | 4 | — | rural urban | yes | — | Yes | — | 80000 | 7000 | 2000 | 2500 | 0.0 | — | 180.0 | gi | 11.0 | 30.0 | 75.0 | 24.0 | 130.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 15.0 | 15000 | 4 | 3 | yes | 5 | 50.0 | Submersible Pump | No 11 | — | 30.0 | Generator | Enfeca, doze, parking | 40.0 | — | — | good | Water is fresh and drinkable | no | — | — | — | — | — | — | Communal | yes | 9-Apr-19 | 4 | 2 | yes | 0 | no | — | — | — | IOM | 9-Mar-21 | Tanka, watwr kiosk 2 | Solor key is not working, engineer needs, reha of the water trough, fencing,need additional tanks | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France