Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
197 BHBRBO002 Borehole Puntland_PWDA Nov. 7, 2019 Bari Bossaso Qaw 5.0 Kuwait Government 04-08-12 Qaw1 11.2097 48.9874 22.0 4.9 2 73108817572.jpg Urban Yes Yes 36.0 10.0 Concrete/Masonry tank 40.0 Galvanised Steel 6000.0 170 4 1 No Submersible Pump Lowara 7.5 12.0 30.0 Generator Dauze 35 35.0 Good Good No 29.0 3100.0 1390.0 Communal 03-05-12 9 2 Yes 0.026 No CARE Somalia GI Class C. Pump 7.5 2018-07-03 Solar power, Tank 60cbm, pipeline 2000, Strategic Water Sources Survey – WSS_NATl
7620 Dug Well Puntland Ministry of Energy Minerals and Water April 5, 2022 Bari bossaso Madaxtooyo 5.0 GUMCO 12/09/2019 Madaxtooyo dugwell 2 11.2800083 49.2059333 -2.0 14 urban yes Yes 27.0 23.0 38.0 21.0 Concrete/Masonry tank PVC Submersible Pump Lowara 26.0 Generator Perkins 165.0 good no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 yes GUMCO 05/01/2022 Replacement of main rasing pipes and submersible pump 1: Extention of pipe line 2: Construction of storage water tank 3: Solar power system
196 BHBRBO001 Borehole Puntland_PWDA Nov. 7, 2019 Bari Bossaso Qaw 5.0 Kuwait Government 03-07-12 Qaw2 11.2091 48.9855 21.0 4.9 2 73110271990.jpg Rural Yes Yes 60.0 10.0 Concrete/Masonry tank 40.0 Galvanised Steel 6000.0 170 4 1 No Submersible Pump Lowara 11 12.0 48.0 Generator Perkins 30 30.0 Good Good No 28.0 3200.0 1310.0 Communal 03-07-12 9 2 Yes 0.026 No 2019-11-07 Solar power intalation Strategic Water Sources Survey – WSS_NATl
7622 Dug Well Puntland Ministry of Energy Minerals and Water April 5, 2022 Bari bossaso Madaxtooyo 5.0 GUMCO 06/08/2017 Madaxtooyo borehole 1 11.2804433 49.2052 -2.0 14 urban yes Yes 21.0 19.0 38.0 21.0 Concrete/Masonry tank PVC Submersible Pump Lowara 21.0 Generator Perkins 165.0 good no 32.2 7.3 2370.0 1200.0 Private-Public-Partnership yes 0.026 GUMCO 05/02/2022 Replacement of main raising pipes and submersible pump Pipes and submersible pump installation of solar power system Construction of water tank
7839 Borehole Somaliland MoWRD April 1, 2022 Sool caynabo Wadaamogoo 5.0 Private 01/01/2017 Qoorweyn borehole 2 8.9618504 46.2522607 816.0 2 rural yes Yes 2000 1200 0 3000 11.0 110.0 pvc 8.0 66.0 15.0 5.0 0.0 0.0 Concrete/Masonry tank 20.0 Galvanised Steel 300.0 500 1 2 yes 5 45.0 Submersible Pump Laura 15.0 66.0 Hybrid - Solar/Generator Perkins 45.0 Photovoltiac 22.5 good The supply system is good but kiosks and animal troughs are very limited no 36.0 8.2 3500.0 2700.0 Private/Individual no no To increase kiosk and animal troughs and installation of new pipes
8065 Borehole Somaliland MoWRD May 10, 2022 Awdal borama Holhol 5.0 Jaamac yuusuf BH 10/01/2021 Jamaac yuusuf BH 9.9209746 43.1327314 1463.0 rural yes Yes 115.0 pvc 8.0 70.0 8.0 Steel tank 6.0 PVC 700.0 0 0 no Submersible Pump Granfoc 15.0 92.0 Solar Dos 6.8 fair The supply is not connected well trogh the farm. no 30.0 8.8 1340.0 966.0 Private/Individual no no
8408 Borehole FGS Ministry of Energy and Water Resources April 19, 2022 Bakool tayeeglow Tieglow 5.0 Community Waranyaa 3.854167 44.3409 rural no 10 No Lack of water 500 300 200 2 1.0 97.0 pvc 7.0 57.0 9.0 12.0 Concrete/Masonry tank PVC 3 yes 0 4.0 Surface mounted Pump 3.0 Electricity Grid poor no Communal yes 3 3 no
2272 BHWGHA165 Borehole SWALIM_HGS Dec. 26, 2011 Woqooyi Galbeed Hargeisa 5.0 Malowle 1 9.5792 43.90842 1376.0 No No Pump Somaliland MoWRD - Ministry of Water Resources Development Hydrogeological Survey and Assessment of Selected Areas in Somaliland and Puntland - HASP
7973 Dug Well Puntland Ministry of Energy Minerals and Water April 9, 2022 Sanaag laasqoray Midigale 5.0 Community_ 08/09/2010 Midigale dug well2 10.6892739 48.6736626 799.0 2 rural urban yes Yes 2520 500 3000 1.0 10.0 7.0 11.0 Concrete/Masonry tank 28.0 Galvanised Steel 700.0 4 2 no Submersible Pump Hybrid - Solar/Generator poor Yield is low. Distributions pipes are rusted. No sufficient water kiosks in the village. Distribution pipe lines are disconnected due to the floods. no 32.1 7.5 1987.0 995.0 Communal yes 11/05/2000 7 3 no no Puntland MoEMW 12/05/2017 Placement of distribution pipe lines. Construction of elevated water tank. 1: Construction of generator room 2: Digging the deep of the well in order to increase the yield of well. 3: Generator 4: Placement of distribution pipe lines. 5: Rehabilitation of animal water troughs. 5: Rehabilitation of water kiosks. 6: Amergency construction of borehole
7773 Borehole FGS Ministry of Energy and Water Resources April 9, 2022 Lower Juba afmadow Mowlid laqay borehole 5.0 Towfiqwelfare 09/04/2018 Miwlidkaqay 0.4050787 41.0249018 51.0 4 rural urban yes Yes 80000 7000 2000 2500 0.0 180.0 gi 11.0 30.0 75.0 24.0 130.0 3.0 Concrete/Masonry tank 25.0 PVC 15.0 15000 4 3 yes 5 50.0 Submersible Pump No 11 30.0 Generator Enfeca, doze, parking 40.0 good Water is fresh and drinkable no Communal yes 9-Apr-19 4 2 yes 0 no IOM 9-Mar-21 Tanka, watwr kiosk 2 Solor key is not working, engineer needs, reha of the water trough, fencing,need additional tanks

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors