Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7526 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Burtinle | 0.8 | MAWASU | 16/03/2015 | Hanad 1 | — | 7.6383332 | 47.8092241 | 476.0 | — | 3 | — | urban | yes | — | Yes | — | 22400 | — | — | — | — | — | 430.0 | pvc | 8.0 | — | 15.0 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 350.0 | PVC | 3000.0 | 3200 | — | — | yes | 10 | 8.0 | Submersible Pump | Lowara | 26.5 | 322.0 | Hybrid - Solar/Generator | Parkins | 100.0 | GPS-300-360 | 37.8 | fair | — | yes | Colorless and odorless | 33.8 | 7.51 | 2050.0 | 1373.5 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | KAALO Relief and Development | 16/01/2020 | 1. Installation of solar power. | 1. Construction of new elevated tank 2. Rehabilitation of pump and riser pipes 3. Construction of animal troughts. 4. Rehabilitation of generator | — | — |
7527 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Mudug | galkayo | Ballanbal | 1.5 | Charity | 16/03/2018 | Ballanbal BH | — | 7.4375285 | 48.140286 | 427.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3500 | 300 | — | 1500 | 0.0 | — | 354.0 | pvc | 8.0 | — | 9.0 | 12.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 44.0 | Galvanised Steel | 50.0 | — | 1 | 2 | yes | 10 | 8.0 | Submersible Pump | Lowara | 18.5 | 339.0 | Hybrid - Solar/Generator | Parkins | 100.0 | GPS-300-360 | 37.8 | poor | Shortage of koisks and pipelines | yes | Turbidity greater than 10, colorness | 33.8 | 7.51 | 2050.0 | 1015.0 | — | Communal | no | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Rehabilitation of generator. 2. Rehabilitation of pump and riser pipes. 3. Installation of solar power 4. Construction of koisks. And extension of pipelines. 5. Fuel supporting. 6. Operator supporting. | — | — |
7528 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursalaax | — | CARE Somalia | 10/01/1994 | Bursaalax BH, ceel weyne | — | 7.1802309 | 47.242755 | 355.0 | — | 4 | — | urban | yes | — | Yes | — | 3000 | — | — | — | — | — | 210.0 | gi | 6.0 | — | 17.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 68.0 | PVC | 4000.0 | 350 | 4 | 2 | yes | 9 | 8.0 | Submersible Pump | Lowara | 11.0 | 170.0 | Hybrid - Solar/Generator | Parkins | 20.0 | YL365D-36b | 12.77 | fair | — | yes | Colorless and odorless | 31.6 | 7.6 | 1940.0 | 1299.8 | — | Communal | no | — | — | — | yes | 0.05 | no | — | — | — | IRC | 10/03/2019 | 1. Installation of solar power | 1. Construction of new elevated tank 2. Rehabilitation of generator 3. Fancing. 4. Caretaker rooms construction. 5. Rehabilitation of pump and riser pipes 6. Extension of pipelines. | — | — |
7999 | — | Spring | Puntland Ministry of Energy Minerals and Water | April 14, 2022 | Sanaag | laasqoray | Buraan | 1.0 | Natural spring | — | Kalgaal spring | — | 10.2151925 | 48.7747194 | 917.0 | — | 5 | — | rural | yes | — | Yes | — | 600 | — | — | 8000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | 8 | 9.0 | — | — | — | — | — | — | — | — | — | fair | No distribution pipes. Storage water tank. | no | — | 32.4 | 8.2 | 1786.0 | 905.0 | — | Communal | yes | 25/07/2000 | — | — | no | — | no | — | — | — | Community_e | — | Cleaning. | Construction of animal water troughs. | — | — |
7532 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | — | Goldogob BH 1 | — | 7.0428316 | 47.0341475 | 346.0 | — | 11 | — | urban rural | yes | — | Yes | — | 42000 | 1200 | 400 | 5000 | 2.5 | — | 209.0 | pvc | 8.0 | — | 9.0 | 15.0 | — | 3.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 46.0 | PVC | 1500.0 | 250 | — | — | no | — | — | Submersible Pump | Lowara | 15.0 | 198.0 | Generator | Parkins | 45.0 | — | — | fair | Needs rehabilitation | yes | Colorless and odorless | 30.8 | 7.56 | 1710.0 | 845.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | GSA | 08/03/2012 | Construction of elevated water tank | 1.Installation of solar power 2. Installation of generator 3. Rehabilitation of pump and riser pipes | — | — |
7533 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | UNICEF | 08/03/2017 | Goldogob BH 3 | — | 7.0409077 | 47.0329871 | 345.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 218.0 | pvc | 8.0 | — | 12.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 9532.0 | 1590 | — | — | no | — | — | Submersible Pump | Frankilin | 11.0 | 192.0 | Generator | Parkins | 110.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Installation of solar power 3. Full rehabilitation 3. Fancing of borehole and supplies. | — | — |
7534 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 13/03/2017 | Goldogob water company BH 5 | — | 7.0437981 | 47.0129558 | 352.0 | — | 11 | — | urban | yes | — | Yes | — | 42000 | — | — | — | — | — | 235.0 | pvc | 8.0 | 140.0 | 18.0 | 15.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 240.0 | PVC | 2786.0 | 7000 | — | — | — | — | — | Submersible Pump | Grandfoss | 15.0 | 126.0 | Hybrid - Solar/Generator | IVECO | 45.0 | — | — | good | — | yes | Colorless and odorless | 30.5 | 7.6 | 1650.0 | 818.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | — | — | — | — | — | — | — | 1. Fancing of borehole 2. Rehabilitation of generator. | — | — |
7535 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | — | 08/02/2015 | Goldogob water company BH 4 | — | 7.0312549 | 47.0079111 | 362.0 | — | 11 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 225.0 | pvc | 8.0 | 145.0 | 18.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 100.0 | PVC | 6250.0 | 1200 | — | — | no | — | — | Submersible Pump | Lowara | 15.0 | 126.0 | Generator | Parkins | 40.0 | — | — | fair | — | yes | Colorless and odorless | 30.3 | 7.58 | 1580.0 | 791.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Installation of solar power 2. Fancing 3. Installation of new generator | — | — |
7536 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Hadaftimo | 4.0 | Al manhal charitable organization | 17/07/2009 | Hadaaftimo borehole 1 | — | 10.7433336 | 48.110193 | 1286.0 | — | 2 | — | rural urban | yes | — | Yes | — | 12000 | 1000 | 500 | 6000 | 1.0 | — | 357.0 | pvc | 8.0 | 220.0 | 12.0 | 16.0 | — | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 62.0 | Galvanised Steel | 150.0 | — | 2 | 3 | yes | 6 | 8.0 | Submersible Pump | Lowara | — | 315.0 | Hybrid - Solar/Generator | Perkins | 60.0 | GPS-300-360 | 25.92 | fair | The borehole needs amergency replacement of pump and main raising pipes. The storage water tanks are old and makes water leaking. | no | — | 32.1 | 7.4 | 1419.0 | 707.0 | — | Communal | yes | 22/09/2018 | 3 | 2 | yes | 0.05 | no | — | — | — | NRC | 16/04/2020 | 1: Solar power system. 2: Rehabilitation of elevated water tank. 3: Construction of animal water troughs. 4: Replacement of main raising pipes and submersible pump. | 1: Amergrncy construction of another borehole due to water demand 2: Amergency replacement of main raising pipes and submersible pump. 3: Replacement of electric cable. 4: Replacement of solar inverter. 5: Assessment of borehole yield in order to get problem related borehole yield reduction. 6: Construction of elevated water tank. 7: Generator and solar power storage ( battery) | — | — |
7538 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 20, 2022 | Bari | iskushuban | Baargaal | 1.0 | Former Somali Government | 21/05/1986 | Bargaal borehole 1 | — | 11.2839238 | 51.0707089 | -28.0 | — | 2 | — | rural urban | yes | — | Yes | — | 6000 | 200 | — | 3500 | — | — | 24.0 | gi | 8.0 | 15.0 | 8.0 | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | — | 400 | 2 | 2 | yes | 4 | 3.0 | Submersible Pump | Lowara | — | 17.0 | Hybrid - Solar/Generator | Perkins | 66.0 | GPS-300-380 | — | fair | There is no good yield. The power of solar is very low. | no | — | 31.1 | 7.8 | 1077.0 | 533.0 | — | Communal | yes | 21/08/1993 | 7 | 0 | yes | 0.05 | no | — | — | — | NRC | 09/10/2021 | 1: Installation of solar power system. 2: Replacement of submersible pump, main raising pipes, and some distribution pipe lines. 3: Construction of caretaker room. 4: Rehabilitation of elevated water tank. | 1: Generator. 2: extension of distribution pipe line in order to supply water to the city. 3: Construction generator room and toilet. 4: Fuel. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France