Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8580 | — | Borehole | Somaliland MoWRD | May 5, 2022 | Awdal | borama | Afraaga | 3.0 | UNICEF | 01/10/2019 | Shaaba 27 | — | 9.9431062 | 43.0760915 | 1346.0 | — | — | — | urban | yes | — | No | There is no pump | — | — | — | — | — | — | 200.0 | pvc | 8.0 | 115.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 100.0 | PVC | 3000.0 | — | — | — | — | — | — | No Pump | — | — | — | — | — | — | — | — | good | Three boreholes at afraaga area are connected to a main reservoir of 100 meter cupic, which will distribute the water by the gravity to the city. | no | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8581 | — | Borehole | Somaliland MoWRD | May 5, 2022 | Awdal | borama | Dhamuug | 3.0 | UNICEF | 04/04/2020 | Shaaba 28 | — | 9.9315038 | 43.0772687 | 1354.0 | — | — | — | urban | yes | — | No | Pump is not installed yet | — | — | — | — | — | — | 300.0 | pvc | 8.0 | 115.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | 3000.0 | — | — | — | — | — | — | No Pump | — | — | — | — | — | — | — | — | fair | Three boreholes at afraaga area are connected to a main reservoir of 100 meter cupic, which will distribute the water by the gravity to the city. | no | — | — | — | — | — | — | Other | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8582 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Buuhoodle | 2.0 | UNICEF | 01/04/2006 | Farah Bulley BH 1 | — | 8.2199418 | 46.3559417 | 630.0 | — | 2 | — | urban rural | yes | — | No | 7 was not functioning, collapsed casing | — | — | — | — | 0.0 | — | 370.0 | gi | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 92.0 | PVC | 500.0 | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | yes | 01/04/2004 | 3 | 2 | no | — | no | — | — | — | — | — | — | 1. Drilling new borehole. 2. Construction of elevated water tank. | — | — |
8587 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Sool | las_caanood | Laascaanood | 5.0 | Private | 01/01/2017 | Nugaal borehole 4 | — | 8.5073342 | 47.4059242 | 619.0 | — | 6 | — | urban | yes | — | No | The is reseve borehole for Nugal water company | — | — | — | — | — | — | 70.0 | pvc | 8.0 | 63.0 | — | — | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 3.0 | Galvanised Steel | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8647 | — | Dug Well | Puntland Ministry of Energy Minerals and Water | April 11, 2022 | Sanaag | ceerigaabo | Shinbiraale | 0.5 | Community_ | 24/08/2007 | Shinbiraale dug well | — | 10.1413467 | 47.9111032 | 1072.0 | — | 1 | — | urban rural | yes | — | No | 20/2/2022 The reason is Due to drought effects the dug well become yield less | 6000 | 200 | — | 1500 | — | — | — | — | — | — | — | — | — | — | 10.0 | 9.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | fair | No sufficient yield. No distribution pipe lines. No main raising pipes and submersible pump. Now the community uses water trucking from another villages which is far from shinbiraale to 50km. | no | — | — | — | — | — | — | Communal | yes | 19/06/2010 | 3 | 4 | — | — | — | — | — | — | Community_e | 26/08/2016 | Digged the deep of the well. | 1: Amergency construction of new borehole due to water demand of shinbiraale community, now the community uses water trucking from another villages which is far from shinbiraale to 50km. 2: Construction of elevated water tank. 3: Construction of water kiosks in the village 4: Construction of animal water troughs. 5: distrubution pipe line. 6: Construction of generator room and caretaker room 7: Generator and solar with battery | — | — |
8660 | — | Borehole | Somaliland MoWRD | May 11, 2022 | Togdheer | burco | Kabadheere area | 2.0 | Shirkadda Maxjarka Al caam | 06/12/2010 | Maxjarka Al Caam 1 | — | 9.48198316153139 | 45.4694341868162 | 1055.0 | — | 1 | — | rural | no | 2 | Abandoned | Less yield and very Brakish water | — | — | — | — | 150.0 | — | 160.0 | pvc | 8.0 | — | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | poor | This Borehole isnt working and its has been abandoned to new one | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | — | — | — | — | — | — | — | — | — | This Borehole is not functioning and it has been abandoned to new one. | — | — |
8661 | — | Borehole | Somaliland MoWRD | May 11, 2022 | Togdheer | burco | — | 1.0 | Dahabshil | 01/12/2011 | Ceelka Dahabshiil | — | 9.4951290031895 | 45.5719488859177 | 1005.0 | — | 0 | — | urban | no | 2 | Abandoned | This Borehole is abondoned and not in use for more than 4 years its Water is Brakish and not suitable for human consumption. | 0 | — | — | — | — | — | 150.0 | pvc | 8.0 | — | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | New Borehole is needed | — | — |
8658 | — | Borehole | FGS Ministry of Energy and Water Resources | — | Bay | Baydhaba | War cedoy | 1.0 | Mustaf Mahamud | 12/3/2016 | Zamzam | — | 3.1969 | 43.1972 | — | — | — | — | — | Yes | — | Yes | — | — | — | — | — | — | — | 80.0 | PVC | — | 17.0 | — | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
8730 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Gacmo fale | — | DRC - Puntland | 05/01/2021 | Gacmofale BH | — | 7.0381939 | 47.7817081 | 267.0 | — | 2 | — | — | no | 4 | No | Unknown problem | — | — | — | — | — | — | 222.0 | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 1. Emergency to study for problems this borehole. | — | — |
8656 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Seemade | 0.7 | Community | 01/12/2021 | Seemade BH 2 | — | 7.1617488 | 48.6013688 | 175.0 | — | 2 | — | urban rural | no | 0 | No | Still under constructing of the water supply | — | — | — | — | 0.0 | — | 212.0 | pvc | 8.0 | — | 14.0 | — | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | poor | Still constructing | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | 1. Emergency ( construction of all water supply system). | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France