Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7587 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 0.1 | China | 28/06/1970 | K5 borehole | — | 9.7644345 | 43.9878784 | 1083.0 | — | 0 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 65.5 | gi | 8.0 | 44.0 | 45.0 | 23.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Stainless Steel | 30000.0 | 4457 | 0 | 0 | no | — | — | Submersible Pump | Lawara | 45.0 | 72.0 | Generator | — | — | — | — | fair | The condition of the supply system is fair | no | — | 32.4 | 7.07 | 1260.0 | 630.0 | — | Communal | no | — | — | — | yes | 0.04 | no | — | — | — | — | — | — | No intervention required | — | — |
8411 | — | Dam | Somaliland MoWRD | May 23, 2022 | Togdheer | burco | Boodhlay | — | FAO | 22/03/2019 | Boodhlay Earth Dam | — | 8.91665 | 45.30411 | — | — | — | — | rural | no | 10 | Yes | — | — | — | — | — | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 4.0 | 65.0 | 55.0 | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 10.0 | PVC | 100.0 | — | — | — | — | — | — | Surface mounted Pump | — | 1.3 | — | Generator | — | — | — | — | — | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
7521 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | WDA | 08/03/1943 | Ceel ciilde BH goldogob | — | 7.031098 | 47.020472 | 346.0 | — | 11 | — | urban rural | yes | — | Yes | — | 2100 | — | — | — | — | — | 200.0 | gi | 8.0 | — | 3.7 | 13.0 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 64.0 | Galvanised Steel | 4000.0 | 300 | 2 | 2 | yes | 9 | 8.0 | Submersible Pump | Grand foss | 11.0 | 124.0 | Generator | Parkins | 45.0 | — | — | poor | Needs full rehabilitation | yes | Colorless and odorless | 32.5 | 7.42 | 2556.0 | 1261.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | yes | — | — | — | CARE Somalia | 08/02/2021 | 1. Construction of new elevated tank tank | 1. New driling borehole 2. Installation of solar power. 4. Rehabilitation of koisks and animal thoughts 5. Construction of caretaker and Generator rooms | — | — |
7530 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | — | 11/03/2019 | Goldogob water company BH 6 | — | 7.0428029 | 47.0339146 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | 8000 | — | — | — | — | — | 240.0 | pvc | 8.0 | 140.0 | 18.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 200.0 | PVC | 2786.0 | 2500 | — | — | no | — | — | Submersible Pump | Grandfoss | 15.0 | 168.0 | Generator | Parkins | 45.0 | — | — | — | — | yes | Colorless and odorless | 30.7 | 7.67 | 1821.0 | 913.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Construction of new elevated tank. | — | — |
7589 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Woqooyi Galbeed | hargeisa | Geed deeble | 0.3 | China | 02/11/1970 | K6 borehole | — | 9.757089 | 43.9829836 | 1072.0 | — | 0 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 143.0 | gi | 8.0 | 41.0 | 64.0 | 23.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Stainless Steel | 30000.0 | 4457 | 0 | 0 | no | — | — | Submersible Pump | Capriri | 64.0 | 63.0 | Generator | — | — | — | — | good | The condition of the supply system is fair | no | — | 33.7 | 6.89 | 1170.0 | 590.0 | — | Communal | no | — | — | — | yes | 0.04 | no | — | — | — | — | — | — | New borehole | — | — |
7522 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Halabookhad | 5.0 | WDA | 06/03/1974 | Halabookhad BH | — | 6.854273 | 47.4133554 | 278.0 | — | 20 | — | urban | yes | — | Yes | — | 10200 | — | — | — | — | — | 85.0 | pvc | 8.0 | 42.0 | 10.0 | 8.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 2500.0 | 300 | 8 | 2 | no | — | — | Submersible Pump | — | 11.0 | 65.0 | Hybrid - Solar/Generator | Parkins | 30.0 | PN60_365 | 22.79 | fair | This supply poorly functioning | yes | Colorless and odorless | 29.6 | 8.08 | 2540.0 | 1270.0 | — | Communal | yes | 06/03/1974 | 4 | 0 | yes | 0.05 | no | — | — | — | UNICEF | 06/03/2018 | Borehole rehabilitation and installation of solar power | Full rehabilitation: 1. Rehabilitation of generator 2. Rehabilitation of pump and riser pipes 3. Extension and rehabilitation elevated water tank 4. Rehabilitation of generator room 5. Rehabilitation of kiosks and animal thoughts. | — | — |
7531 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 15, 2022 | Mudug | galkayo | Xarfo | — | UNICEF | 15/02/2021 | Xafro BH 4 | — | 7.3565719 | 47.615313 | 371.0 | — | 4 | — | urban | yes | — | Yes | — | 6300 | — | — | — | — | — | 220.0 | pvc | 8.0 | 140.0 | 14.0 | 10.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 300.0 | PVC | 2500.0 | 900 | 0 | 0 | no | — | — | Submersible Pump | Grandfoss | 15.0 | 180.0 | Generator | CEOLMO | 45.0 | — | — | good | — | yes | Colorless and odorless | 31.5 | 7.81 | 1800.0 | 895.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.05 | no | — | — | — | UNICEF | 15/09/2021 | 1. Construction of elevated water tank | 1. Fancing. 2. Installation of solar power. 3. Fuel supporting. | — | — |
7523 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Ceel boos Goldogob | — | — | 08/03/2017 | Ceel booc BH goldogob | — | 7.0321616 | 47.022893 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | 750 | — | — | — | — | — | 215.0 | pvc | 8.0 | — | 6.7 | 5.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 94.0 | Galvanised Steel | 70.0 | — | 1 | 2 | yes | 3 | 8.0 | Submersible Pump | — | 11.0 | 192.0 | Generator | Parkins | 30.0 | — | — | poor | Absolutely poor supply, this supply needs full rehabilitation | yes | Colorless and odorless | 32.1 | 7.54 | 2530.0 | 1251.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Emergency 2. Installation of solar power 3. Generator rehabilitation 4. Caretaker and Generator rooms rehabilitation 5. Koisks and animal thoughts rehabilitation 6. Fancing. | — | — |
7525 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Burtinle | 1.5 | UNICEF | 16/03/2020 | Hanad BH 3 | — | 7.646383 | 47.8075501 | 483.0 | — | 3 | — | urban | yes | — | Yes | — | 22000 | — | — | — | — | — | 408.0 | pvc | 8.0 | 244.0 | 12.0 | 18.0 | 69.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 375.0 | PVC | 2500.0 | 3500 | 0 | 0 | yes | 8 | 8.0 | Submersible Pump | Lowara | 22.0 | 360.0 | Hybrid - Solar/Generator | Parkins | 65.0 | BYD400MIK-36 | 43.2 | good | — | yes | Colorless and odorless | 36.2 | 7.32 | 2380.0 | 1205.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | 27/03/2021 | 1. Installation of solar power | 1. Fencing around borehole | — | — |
7526 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Nugaal | burtinle | Burtinle | 0.8 | MAWASU | 16/03/2015 | Hanad 1 | — | 7.6383332 | 47.8092241 | 476.0 | — | 3 | — | urban | yes | — | Yes | — | 22400 | — | — | — | — | — | 430.0 | pvc | 8.0 | — | 15.0 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 350.0 | PVC | 3000.0 | 3200 | — | — | yes | 10 | 8.0 | Submersible Pump | Lowara | 26.5 | 322.0 | Hybrid - Solar/Generator | Parkins | 100.0 | GPS-300-360 | 37.8 | fair | — | yes | Colorless and odorless | 33.8 | 7.51 | 2050.0 | 1373.5 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | KAALO Relief and Development | 16/01/2020 | 1. Installation of solar power. | 1. Construction of new elevated tank 2. Rehabilitation of pump and riser pipes 3. Construction of animal troughts. 4. Rehabilitation of generator | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France