Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7587 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 0.1 China 28/06/1970 K5 borehole 9.7644345 43.9878784 1083.0 0 urban yes Yes 31200 65.5 gi 8.0 44.0 45.0 23.0 0.0 0.0 Concrete/Masonry tank Stainless Steel 30000.0 4457 0 0 no Submersible Pump Lawara 45.0 72.0 Generator fair The condition of the supply system is fair no 32.4 7.07 1260.0 630.0 Communal no yes 0.04 no No intervention required
8411 Dam Somaliland MoWRD May 23, 2022 Togdheer burco Boodhlay FAO 22/03/2019 Boodhlay Earth Dam 8.91665 45.30411 rural no 10 Yes 1.0 4.0 65.0 55.0 Concrete/Masonry tank 10.0 PVC 100.0 Surface mounted Pump 1.3 Generator no Communal
7521 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob WDA 08/03/1943 Ceel ciilde BH goldogob 7.031098 47.020472 346.0 11 urban rural yes Yes 2100 200.0 gi 8.0 3.7 13.0 8.0 Concrete/Masonry tank 64.0 Galvanised Steel 4000.0 300 2 2 yes 9 8.0 Submersible Pump Grand foss 11.0 124.0 Generator Parkins 45.0 poor Needs full rehabilitation yes Colorless and odorless 32.5 7.42 2556.0 1261.0 Utility/Local Authority yes 0.05 yes CARE Somalia 08/02/2021 1. Construction of new elevated tank tank 1. New driling borehole 2. Installation of solar power. 4. Rehabilitation of koisks and animal thoughts 5. Construction of caretaker and Generator rooms
7530 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Goldogob 11/03/2019 Goldogob water company BH 6 7.0428029 47.0339146 346.0 11 urban yes Yes 8000 240.0 pvc 8.0 140.0 18.0 15.0 2.0 Concrete/Masonry tank 200.0 PVC 2786.0 2500 no Submersible Pump Grandfoss 15.0 168.0 Generator Parkins 45.0 yes Colorless and odorless 30.7 7.67 1821.0 913.0 Private-Public-Partnership yes 0.05 no 1. Construction of new elevated tank.
7589 Borehole Somaliland MoWRD April 11, 2022 Woqooyi Galbeed hargeisa Geed deeble 0.3 China 02/11/1970 K6 borehole 9.757089 43.9829836 1072.0 0 urban yes Yes 143.0 gi 8.0 41.0 64.0 23.0 0.0 0.0 Concrete/Masonry tank 0.0 Stainless Steel 30000.0 4457 0 0 no Submersible Pump Capriri 64.0 63.0 Generator good The condition of the supply system is fair no 33.7 6.89 1170.0 590.0 Communal no yes 0.04 no New borehole
7522 Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Halabookhad 5.0 WDA 06/03/1974 Halabookhad BH 6.854273 47.4133554 278.0 20 urban yes Yes 10200 85.0 pvc 8.0 42.0 10.0 8.0 3.0 Concrete/Masonry tank 20.0 Galvanised Steel 2500.0 300 8 2 no Submersible Pump 11.0 65.0 Hybrid - Solar/Generator Parkins 30.0 PN60_365 22.79 fair This supply poorly functioning yes Colorless and odorless 29.6 8.08 2540.0 1270.0 Communal yes 06/03/1974 4 0 yes 0.05 no UNICEF 06/03/2018 Borehole rehabilitation and installation of solar power Full rehabilitation: 1. Rehabilitation of generator 2. Rehabilitation of pump and riser pipes 3. Extension and rehabilitation elevated water tank 4. Rehabilitation of generator room 5. Rehabilitation of kiosks and animal thoughts.
7531 Borehole Puntland Ministry of Energy Minerals and Water March 15, 2022 Mudug galkayo Xarfo UNICEF 15/02/2021 Xafro BH 4 7.3565719 47.615313 371.0 4 urban yes Yes 6300 220.0 pvc 8.0 140.0 14.0 10.0 0.0 Concrete/Masonry tank 300.0 PVC 2500.0 900 0 0 no Submersible Pump Grandfoss 15.0 180.0 Generator CEOLMO 45.0 good yes Colorless and odorless 31.5 7.81 1800.0 895.0 Utility/Local Authority yes 0.05 no UNICEF 15/09/2021 1. Construction of elevated water tank 1. Fancing. 2. Installation of solar power. 3. Fuel supporting.
7523 Borehole Puntland Ministry of Energy Minerals and Water March 8, 2022 Mudug goldogob Ceel boos Goldogob 08/03/2017 Ceel booc BH goldogob 7.0321616 47.022893 346.0 11 urban yes Yes 750 215.0 pvc 8.0 6.7 5.0 4.0 Concrete/Masonry tank 94.0 Galvanised Steel 70.0 1 2 yes 3 8.0 Submersible Pump 11.0 192.0 Generator Parkins 30.0 poor Absolutely poor supply, this supply needs full rehabilitation yes Colorless and odorless 32.1 7.54 2530.0 1251.0 Private/Individual yes 0.05 yes 1. Emergency 2. Installation of solar power 3. Generator rehabilitation 4. Caretaker and Generator rooms rehabilitation 5. Koisks and animal thoughts rehabilitation 6. Fancing.
7525 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Burtinle 1.5 UNICEF 16/03/2020 Hanad BH 3 7.646383 47.8075501 483.0 3 urban yes Yes 22000 408.0 pvc 8.0 244.0 12.0 18.0 69.0 3.0 Concrete/Masonry tank 375.0 PVC 2500.0 3500 0 0 yes 8 8.0 Submersible Pump Lowara 22.0 360.0 Hybrid - Solar/Generator Parkins 65.0 BYD400MIK-36 43.2 good yes Colorless and odorless 36.2 7.32 2380.0 1205.0 Private-Public-Partnership yes 0.05 no 27/03/2021 1. Installation of solar power 1. Fencing around borehole
7526 Borehole Puntland Ministry of Energy Minerals and Water March 16, 2022 Nugaal burtinle Burtinle 0.8 MAWASU 16/03/2015 Hanad 1 7.6383332 47.8092241 476.0 3 urban yes Yes 22400 430.0 pvc 8.0 15.0 20.0 3.0 Concrete/Masonry tank 350.0 PVC 3000.0 3200 yes 10 8.0 Submersible Pump Lowara 26.5 322.0 Hybrid - Solar/Generator Parkins 100.0 GPS-300-360 37.8 fair yes Colorless and odorless 33.8 7.51 2050.0 1373.5 Private-Public-Partnership yes 0.05 no KAALO Relief and Development 16/01/2020 1. Installation of solar power. 1. Construction of new elevated tank 2. Rehabilitation of pump and riser pipes 3. Construction of animal troughts. 4. Rehabilitation of generator

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors