Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7142 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 22, 2022 | Middle Shabelle | jowhar | Sariiraale | 1.5 | Private | 07/07/2011 | Cabdi Cali | — | 2.864814 | 45.4464315 | 107.0 | — | — | — | rural | yes | — | No | 2 years ago,there is a lot of sand in the source | 1980 | — | — | — | — | — | — | — | — | — | — | — | — | — | 40.0 | 25.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 15.0 | PVC | 10.0 | 110 | 1 | — | no | — | — | Submersible Pump | 5.5kw | — | 35.0 | Generator | Gangfa 115 | — | — | — | poor | The apron of the source broken and it's a lot of trees around | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | Private | 17-Jun-19 | Change the submersible pump | Construction of animal troughs, water kiosk, elevated water tank, supply of generator, submersible pump, fence and gate and pipeline extension. | — | — |
7541 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Galkacayo water company | 05/03/2009 | Galkacayo water company BH 6 | — | 6.7923506 | 47.4137397 | 268.0 | — | 20 | — | urban | yes | — | Yes | — | 66000 | — | — | — | — | — | 210.0 | pvc | 12.0 | 55.0 | 48.0 | 24.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 750.0 | Galvanised Steel | 8000.0 | 1600 | 0 | — | no | — | — | Submersible Pump | Franklin | 22.0 | 150.0 | Generator | — | 350.0 | — | — | — | — | yes | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | — | — | — |
7339 | — | Dug Well | Somaliland MoWRD | May 8, 2022 | Awdal | lughaye | Gargaara | 0.5 | UNICEF | 06/12/2019 | Gargaara bari | — | 10.3088798 | 43.8060581 | 297.0 | — | — | — | rural urban | yes | — | Yes | — | 5000 | 5000 | — | 10000 | — | — | — | — | — | — | — | — | — | — | 9.0 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | 2300.0 | 700 | 4 | 2 | no | — | — | Submersible Pump | — | 3.0 | 9.0 | Hybrid - Solar/Generator | Perkin | 15.0 | Axitec | 3.0 | fair | The supply is well connected trough a public kiosk points. | no | — | 32.0 | 7.59 | 545.0 | 385.0 | — | Communal | no | — | — | — | yes | 0.02 | yes | — | — | — | — | — | — | Reservoir rehabilitation, pipeline extension | — | — |
7540 | — | Borehole | FGS Ministry of Energy and Water Resources | March 16, 2022 | Middle Shabelle | balcad | Hareer Caadle | 1.0 | ZamZam Foundation | 10/05/2017 | Hareer Caadle | — | 2.2490641 | 45.3960738 | 203.0 | — | — | — | rural | yes | — | Yes | — | 4860 | — | — | — | — | — | 200.0 | gi | 8.0 | — | — | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | 80.0 | 500 | 2 | — | no | — | — | Submersible Pump | Lowara 15kw | — | 170.0 | Generator | Duos | 50.0 | — | — | fair | Good | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | ZamZam Foundation | 10-Apr-18 | Installation of Solar system and supply of Generator Duos 30 KVA | New BH, construction of animal troughs, elevated water tank, installation of Solar system supply of Generator and pipeline extension. | — | — |
7359 | — | Dug Well | FGS Ministry of Energy and Water Resources | June 9, 2022 | Gedo | belet_xaawo | Malkariye | 7.0 | BUWASCO | 14/11/2011 | Malkariye well | — | 3.9823627 | 41.9069884 | 177.0 | — | 10 | — | rural urban | yes | — | Yes | — | 96850 | 500 | 400 | 6000 | 2.0 | — | — | — | — | — | — | — | — | — | 12.0 | 6.0 | — | 24.0 | 8.0 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 1.0 | PVC | 6.0 | 25125 | 20 | 0 | no | — | — | Submersible Pump | — | 120.0 | 1.0 | Generator | GP50 | — | — | — | good | Good condition the only source of piped water in the town | no | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 5 | no | — | — | — | DRC | 2-May-22 | Rehabilitation | Digging | — | — |
7124 | — | Dug Well | Somaliland MoWRD | May 5, 2022 | Sanaag | ceel_afweyn | Ceelnimcoon | 0.1 | — | 08/07/2007 | Ceelnimcoon dug well | — | 9.72627632785589 | 47.1097929216921 | 859.0 | — | 0 | — | rural urban | yes | — | Yes | — | 10000 | 15000 | 50 | 40000 | 2.0 | — | — | — | — | — | — | — | — | — | 15.0 | 12.0 | 8.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 10.0 | Galvanised Steel | 1500.0 | 36000 | 3 | 5 | yes | 10 | 8.0 | Submersible Pump | Grundfos | 8.0 | 12.0 | Hybrid - Solar/Generator | Perkins | 30.0 | Lorentz | 15.0 | good | The system is good | no | — | 29.0 | 7.3 | 2950.0 | 2000.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.1 | yes | — | — | — | Oxfam Novib | 13/12/2020 | Construction of animal troughs Construction and rehabilitation of water kiosks. Shallow well cleaning. | Provision of water salinity machine Replacement and expansion of troughs area. Water tank rehabilitation. | — | — |
8304 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Xadhadhan | 1.4 | ISRC | 01/04/2016 | Xadhadhan BH | — | 8.3000813 | 46.156516 | 660.0 | — | 1 | — | urban rural | yes | — | No | Year and half, problem of pump and cables | 21000 | — | — | — | — | — | 373.0 | pvc | 8.0 | — | 12.0 | — | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | PVC | 2000.0 | 30 | 4 | 4 | no | — | — | Submersible Pump | Lowara | 15.0 | 340.0 | Hybrid - Solar/Generator | Parkins | 60.0 | SZYL-M330-36 | 23.1 | fair | — | no | — | — | — | — | — | — | Communal | yes | 01/04/2016 | 3 | 2 | yes | — | — | — | — | — | CARE Somalia | 01/04/2019 | 1. Rehabilitation of pump and cables | 1. Emergency. 2. Installation of cables and pump. 3. Rehabilitation of solar | — | — |
7738 | — | Borehole | FGS Ministry of Energy and Water Resources | May 17, 2022 | Lower Shabelle | wanla_weyn | Eeyladda | — | Qatar Charity | 12/11/2015 | Tawakal BH | — | 2.606944 | 44.89694 | — | — | — | — | urban | yes | — | Yes | — | 4800 | — | — | — | — | — | 160.0 | — | — | 50.0 | 12.0 | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | — | — | 800 | — | — | — | — | — | Submersible Pump | Elect Submersible Pump | — | 120.0 | — | — | — | — | — | poor | — | no | — | 25.5 | 7.2 | 5580.0 | 2790.0 | — | Communal | yes | — | — | — | yes | 0.005 | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
7554 | — | Borehole | FGS Ministry of Energy and Water Resources | March 15, 2022 | Middle Shabelle | balcad | Waabari | 0.0 | IR | 15/08/2018 | Shabelle 1 | — | 2.35316 | 45.38159 | — | — | — | — | urban | yes | — | Yes | — | 4850 | — | — | — | — | — | 120.0 | pvc | 8.0 | 80.0 | — | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 35.0 | PVC | 60.0 | 960 | 1 | 0 | no | — | — | Submersible Pump | Lowara 7.5kw | 40.0 | 96.0 | Generator | Perkins | 30.0 | — | — | poor | It's in a normal condition | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.05 | no | — | — | — | Owner | 15-Apr-21 | Change the submersible pump | Generator room rehabilitation of animal troughs | — | — |
7538 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 20, 2022 | Bari | iskushuban | Baargaal | 1.0 | Former Somali Government | 21/05/1986 | Bargaal borehole 1 | — | 11.2839238 | 51.0707089 | -28.0 | — | 2 | — | rural urban | yes | — | Yes | — | 6000 | 200 | — | 3500 | — | — | 24.0 | gi | 8.0 | 15.0 | 8.0 | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | — | 400 | 2 | 2 | yes | 4 | 3.0 | Submersible Pump | Lowara | — | 17.0 | Hybrid - Solar/Generator | Perkins | 66.0 | GPS-300-380 | — | fair | There is no good yield. The power of solar is very low. | no | — | 31.1 | 7.8 | 1077.0 | 533.0 | — | Communal | yes | 21/08/1993 | 7 | 0 | yes | 0.05 | no | — | — | — | NRC | 09/10/2021 | 1: Installation of solar power system. 2: Replacement of submersible pump, main raising pipes, and some distribution pipe lines. 3: Construction of caretaker room. 4: Rehabilitation of elevated water tank. | 1: Generator. 2: extension of distribution pipe line in order to supply water to the city. 3: Construction generator room and toilet. 4: Fuel. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France