Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7538 Borehole Puntland Ministry of Energy Minerals and Water March 20, 2022 Bari iskushuban Baargaal 1.0 Former Somali Government 21/05/1986 Bargaal borehole 1 11.2839238 51.0707089 -28.0 2 rural urban yes Yes 6000 200 3500 24.0 gi 8.0 15.0 8.0 14.0 Concrete/Masonry tank 40.0 PVC 400 2 2 yes 4 3.0 Submersible Pump Lowara 17.0 Hybrid - Solar/Generator Perkins 66.0 GPS-300-380 fair There is no good yield. The power of solar is very low. no 31.1 7.8 1077.0 533.0 Communal yes 21/08/1993 7 0 yes 0.05 no NRC 09/10/2021 1: Installation of solar power system. 2: Replacement of submersible pump, main raising pipes, and some distribution pipe lines. 3: Construction of caretaker room. 4: Rehabilitation of elevated water tank. 1: Generator. 2: extension of distribution pipe line in order to supply water to the city. 3: Construction generator room and toilet. 4: Fuel.
7667 Borehole FGS Ministry of Energy and Water Resources April 26, 2022 Lower Shabelle afgooye Elasha GTZ 21/11/1979 Elasha biyaha 8 2.10238 45.22502 urban yes Yes 7200 200.0 25.0 36.0 24.0 Concrete/Masonry tank 30.0 1200 Submersible Pump Elect Submersible pump 175.0 fair no Private/Individual yes 0.02 UNISOM 21-Nov-95 Generator supply Full Rehabilitation
7536 Borehole Puntland Ministry of Energy Minerals and Water April 10, 2022 Sanaag laasqoray Hadaftimo 4.0 Al manhal charitable organization 17/07/2009 Hadaaftimo borehole 1 10.7433336 48.110193 1286.0 2 rural urban yes Yes 12000 1000 500 6000 1.0 357.0 pvc 8.0 220.0 12.0 16.0 0.5 Concrete/Masonry tank 62.0 Galvanised Steel 150.0 2 3 yes 6 8.0 Submersible Pump Lowara 315.0 Hybrid - Solar/Generator Perkins 60.0 GPS-300-360 25.92 fair The borehole needs amergency replacement of pump and main raising pipes. The storage water tanks are old and makes water leaking. no 32.1 7.4 1419.0 707.0 Communal yes 22/09/2018 3 2 yes 0.05 no NRC 16/04/2020 1: Solar power system. 2: Rehabilitation of elevated water tank. 3: Construction of animal water troughs. 4: Replacement of main raising pipes and submersible pump. 1: Amergrncy construction of another borehole due to water demand 2: Amergency replacement of main raising pipes and submersible pump. 3: Replacement of electric cable. 4: Replacement of solar inverter. 5: Assessment of borehole yield in order to get problem related borehole yield reduction. 6: Construction of elevated water tank. 7: Generator and solar power storage ( battery)
7360 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Gedo doolow Garboolow village 2.0 COOPI 21/03/2022 Garboolow well 3.8031884 42.5505947 122.0 1 rural urban yes Yes 1000 0 0 0 10.0 11.0 1.0 2.0 24.0 1.0 Plastic tank 5.0 PVC 168.0 100 2 0 yes 10 10.0 Surface mounted Pump Dont know 11.0 Solar 14.0 poor The supply system doesn't cover yes They are not good in all aspects Communal yes 21-Mar-22 10 6 yes 5 no ASEP 21-Mar-22 Renovation and rehabilitation Renovation and rehabilitation
7655 Borehole FGS Ministry of Energy and Water Resources April 26, 2022 Lower Shabelle afgooye Elasha GTZ 21/11/1979 Elasha biyaha 6 2.07252 45.19677 urban yes Yes 7200 200.0 25.0 36.0 24.0 Concrete/Masonry tank 50.0 1250 Submersible Pump Elect Submersible pump 175.0 fair no Private/Individual yes 0.02 UNISOM 16-Dec-95 Generator supply Full Rehabilitation
7737 Borehole FGS Ministry of Energy and Water Resources May 17, 2022 Lower Shabelle wanla_weyn Garfaale Former Somali Government 07/04/1985 Garfaale BH 2.634722 45.03972 rural yes Yes 9000 1000 1600 1900 153.0 gi 8.0 40.0 14.0 21.0 Concrete/Masonry tank 26.0 1500 Submersible Pump Elect Submersible Pump 135.0 good no 26.6 7.6 6140.0 3090.0 Communal yes yes 0.005 Full Rehabilitation
7843 Borehole Galmudug Ministry of Energy and Water Resources March 25, 2022 Galgaduud cadaado Waabari 0.01 24/02/2016 Ceel baraf 6.1295445 46.635306 338.0 0 rural urban yes Yes 5000 540 25000 185.0 pvc 8.0 72.0 18.0 Concrete/Masonry tank 170.0 Galvanised Steel 75.0 1500 1 1 yes 8 7.0 Submersible Pump Granglin 80.0 140.0 Generator Doutz 40.0 fair 1. Large water supply system 2. Rehabilitation of 75 m pipelines yes 24.8 6.59 3410.0 1710.0 Private/Individual yes NRC Solar 2018-02-24
7142 Dug Well FGS Ministry of Energy and Water Resources March 22, 2022 Middle Shabelle jowhar Sariiraale 1.5 Private 07/07/2011 Cabdi Cali 2.864814 45.4464315 107.0 rural yes No 2 years ago,there is a lot of sand in the source 1980 40.0 25.0 4.0 Concrete/Masonry tank 15.0 PVC 10.0 110 1 no Submersible Pump 5.5kw 35.0 Generator Gangfa 115 poor The apron of the source broken and it's a lot of trees around no Private/Individual yes 0.05 yes Private 17-Jun-19 Change the submersible pump Construction of animal troughs, water kiosk, elevated water tank, supply of generator, submersible pump, fence and gate and pipeline extension.
7549 Borehole FGS Ministry of Energy and Water Resources March 17, 2022 Middle Shabelle balcad Xaawo Taako 0.0 Private 12/07/2020 Miftaxul Kheyr 2.3392097 45.3926143 117.0 urban yes Yes 2870 140.0 pvc 10.0 6.0 Plastic tank 20.0 PVC 140.0 120 1 no Submersible Pump 15kw 106.0 Hybrid - Solar/Generator Perkins 30.0 270.0 good It's in a good condition no Private/Individual yes 0.05 no Private 8-Mar-22 Elevated water tank Construction of water tank, animal water troughs, pipeline extension and supply of Generator.
7546 Borehole FGS Ministry of Energy and Water Resources March 15, 2022 Middle Shabelle balcad Caliyalle 1.0 SAACID 15/03/1996 Caliyalle BH 2.1793298 45.399509 122.0 rural yes Yes 2550 0 0 0 0.0 150.0 gi 8.0 115.0 8.0 Concrete/Masonry tank 25.0 Galvanised Steel 100.0 170 5 0 no Submersible Pump Mechanical pump 115.0 Generator LISTER-PETTER 30.0 fair It's in a good condition no Private-Public-Partnership yes 0.05 no No intervention since the establishment date Supply of Generator and construction of elevated water tank and pipeline extension.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors