Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7616 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 5, 2022 | Bari | bossaso | Aaran | 3.0 | GUMCO | 06/12/2008 | Aaran borehole 2 | — | 11.2415982 | 49.2066493 | 41.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 70.0 | pvc | 8.0 | 50.0 | 10.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 69.0 | Generator | Perkins | 80.0 | — | — | fair | Yield is low | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | — | — | — | — | GUMCO | 05/11/2021 | Replacement of main raising pipes and submersible pump | Installation of solar power system. Distribution pipes | — | — |
7617 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 5, 2022 | Bari | bossaso | Aaran | 3.0 | GUMCO | 08/06/2008 | Aaran borehole 1 | — | 11.2417607 | 49.2070245 | 50.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 50.0 | pvc | 8.0 | 40.0 | 13.0 | 21.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Lowara | — | 49.0 | Generator | Perkins | 80.0 | — | — | good | — | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | — | — | — | — | GUMCO | 14/01/2022 | Replacement of main raising pipes and submersible pump | Installation of solar power system. Pipe line. | — | — |
7618 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 6, 2022 | Bari | bossaso | Baalade | 3.0 | Italian agency | 25/08/1998 | Hiirad borehole | — | 11.264912 | 49.175253 | -4.0 | — | 14 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 28.0 | pvc | 10.0 | 17.0 | 20.0 | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | — | PVC | — | — | — | — | — | — | — | Submersible Pump | Luwara | — | 27.0 | Generator | Perkins | 45.0 | — | — | good | These borehole supplies water to a shared water tank. Thus the HH connected to this water source is not available | no | — | 32.2 | 7.3 | 2370.0 | 1200.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | — | — | — | — | GUMCO | 07/01/2022 | Replacement of main raising pipes and submersible pump. | 1.Solar with storage battery 2.pipes 3.submersible pump | — | — |
7700 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Private | 05/03/2002 | Daryeel Galkacayo BH 1 | — | 6.8165208 | 47.4376178 | 264.0 | — | 20 | — | urban | yes | — | Yes | — | 10000 | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 13.3 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 160.0 | PVC | 10000.0 | 700 | 3 | — | no | — | — | Submersible Pump | Lowara | 22.0 | 138.0 | Hybrid - Solar/Generator | Parkins | 160.0 | SS360-72 | 32.76 | good | — | yes | Colorless and odorless | 35.1 | 7.28 | 3260.0 | 1615.0 | — | Private/Individual | — | — | — | — | yes | 0.01 | no | — | — | — | — | — | — | 1. Extra pump 2. Riser pipes rehabilitation 3. Water tank rehabilitation. | — | — |
7643 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Bari | bandar_beyla | Caris | 1.0 | Shilcon | 27/12/2005 | Haashire spring | — | 9.5872416 | 50.8004885 | -32.0 | — | 1 | — | rural urban | yes | — | Yes | — | 720 | — | — | 100 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 7.0 | — | — | — | — | Concrete/Masonry tank | 6.0 | PVC | 1200.0 | — | 3 | 1 | no | — | — | Submersible Pump | Lowara | — | — | Hybrid - Solar/Generator | KAMA | — | — | — | fair | The power of generator and solar is very low. The yield is very low. | no | — | 29.5 | 7.64 | 1700.0 | 895.0 | — | Communal | yes | 14/09/2021 | 3 | 2 | yes | 0.025 | no | — | — | — | CARE Somalia | 30/12/2021 | 1: Installation of 5 solar panels with all accessories. 2: Rehabilitation of caretaker room. 3: Installation of submersible pump. 4: Construction of RC concrete slab which protect the mouth of spring. 5: Construction of 3 kiosks and one animal troughs. | 1: Diging the deep of the spring in order to increase its yield. 2: Generator and installation of extra solar panels with all accessories. 3: Fuel which acess generator. | — | — |
7649 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 23, 2022 | Bari | qardho | Qardo IDPs | 1.5 | Save the children | 23/01/2020 | Qardo IDPs borehole | — | 9.4831712 | 49.0737678 | 709.0 | — | 9 | — | rural urban | yes | — | Yes | — | 12000 | 800 | — | 1500 | 1.0 | — | 240.0 | pvc | 8.0 | 170.0 | 12.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | — | 5 | 9 | — | yes | 7 | 8.0 | Submersible Pump | Lowara | — | 198.0 | Hybrid - Solar/Generator | Oelmo | 50.0 | SLA300M | 21.6 | — | — | no | — | 32.4 | 7.0 | 2300.0 | 1172.0 | — | Communal | yes | 22/09/2020 | 9 | 3 | yes | 0.02 | — | — | — | — | Community_e | 23/01/2022 | 1: Replacement some of main raising pipes. 2: Replacement of submersible pump 3: Replacement of electric cable. | 1: Replacement of main raising pipes. 2: Construction of animal water troughs. 3: Construction of another elevated water tank due to population. 4: Construction of fencing which protect borehole to floods. | — | — |
7650 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Bari | bandar_beyla | Dhuur | 0.5 | Community_ | 23/10/2016 | Dhuur borehole | — | 9.2445017 | 50.6021417 | 93.0 | — | 4 | — | rural urban | yes | — | Yes | — | 600 | 200 | — | 1500 | 2.0 | — | 120.0 | pvc | 8.0 | 100.0 | 15.0 | 7.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Galvanised Steel | — | — | — | — | yes | 6 | 10.0 | — | — | — | — | — | — | — | — | — | — | — | no | — | 33.0 | 7.1 | 2150.0 | 1030.0 | — | Private/Individual | — | — | — | — | yes | 0.02 | — | — | — | — | CARE Somalia | 22/10/2020 | Replacement of main raising pipes and submersible pump. | 1: Solar 2: storage water tank. 3: Generator 4: pipes | — | — |
7651 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 14, 2022 | Bari | iskushuban | Iskushuban | 0.5 | Community | 24/07/2012 | Dhalmado spring | — | 10.2822346 | 50.2339662 | 247.0 | — | 2 | — | urban | yes | — | Yes | — | 9000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 20.0 | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | — | 60 | 4 | — | yes | 16 | 6.0 | Submersible Pump | Lowara | — | — | Hybrid - Solar/Generator | Perkins | 60.0 | — | — | — | — | no | — | 28.2 | 7.1 | 2020.0 | 1019.0 | — | Communal | yes | 21/04/2015 | 3 | 3 | yes | 0.02 | — | — | — | — | Community | 21/12/2020 | Construction of water kiosks | Construction of elevated water tank. Increasing of solar panels Extention of distribution pipes into village. | — | — |
7687 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | bossaso | Ceel daahir | 1.3 | Former Somali Government | 08/07/1988 | Ceel dahir borehole 1 | — | 10.6401232 | 49.0499791 | 603.0 | — | 2 | — | rural urban | yes | — | Yes | — | 1800 | 200 | — | 500 | 2.0 | — | 165.0 | gi | 8.0 | 16.0 | 46.0 | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 154.0 | PVC | 1400.0 | 180 | 2 | — | yes | 10 | 10.0 | Submersible Pump | Lowara | — | 90.0 | Hybrid - Solar/Generator | Perkins | 33.0 | — | 16.45 | good | — | no | — | 26.5 | 7.7 | 2120.0 | 1070.0 | — | Communal | no | — | — | — | yes | 0.016 | — | — | — | — | KAALO Relief and Development | 10/03/2021 | Extenstion of solar panels | 1: Extention of distribution pipe line in order to supply water to the village 2: Submersible pump 3: Construction of caretaker room | — | — |
7691 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Bari | iskushuban | Jeedal | 2.0 | UNICEF | 19/02/2022 | Jeedal borehole | — | 10.2112917 | 49.5234167 | 647.0 | — | 1 | — | rural urban | yes | — | Yes | — | — | — | — | — | — | — | 260.0 | pvc | 8.0 | — | 14.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | yes | 25 | 8.0 | Submersible Pump | Lowara | — | 276.0 | Generator | Perkins | 45.0 | — | — | fair | No elevated water tank No animal troughs. No water points. | no | — | 33.0 | 8.2 | 1350.0 | 680.0 | — | Communal | no | — | — | — | yes | 0.015 | — | — | — | — | — | — | No intervention is performed, because the borehole is newer | This borehole is under construction, elevated water tank, troughs and the care taker room is to be constructed soon. Despite that they need the flowing intervention:- 1: Installation of solar power system,due to the increased fuel prices. 2: Water tank for the town supply. 3: Distribution pipes and kiosks for the settlement. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France