Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7498 Borehole Puntland Ministry of Energy Minerals and Water March 27, 2022 Nugaal garowe Garowe NUWACO Water Company 27/03/2017 Jillab BH 1 8.3921872 48.5132857 446.0 10 urban yes Yes 2100 350.0 pvc 8.0 120.0 8.0 8.0 5.0 Concrete/Masonry tank 50.0 PVC 2000.0 105 11 no Submersible Pump Lowara 15.0 216.0 Solar RP300M-72 27.0 good yes Colorless and odorless 30.3 7.28 5730.0 2860.0 Private-Public-Partnership yes 0.05 no NUWACO Water Company 27/03/2017 1. Installation of solar power
8308 Borehole Puntland Ministry of Energy Minerals and Water March 12, 2022 Mudug galkayo Hadoodil 21/03/2004 Hadoodil BH 7.2353236 47.4007961 335.0 1 rural urban yes No 1 month, pump problem 2100 2000 8000 0.0 210.0 pvc 8.0 32.0 9.0 0.4 Concrete/Masonry tank 76.0 PVC 5000.0 150 2 3 no Submersible Pump 7.5 180.0 Generator Parkins 45.0 poor Absolutely poor no Communal yes 21/03/2007 3 2 NRC 12/03/2021 1. Construction of new elevated tank. 1. Installation of pump. 2. Installation of solar power. 3. Rehabilitation of animal troughts. 4. Construction of new kiosks. 5. Trucking pipe
7497 Borehole Puntland Ministry of Energy Minerals and Water March 27, 2022 Nugaal garowe Garowe 1.5 UNICEF 27/03/2019 Jilab BH 2 8.3808506 48.5211993 453.0 2 urban yes Yes 2100 360.0 pvc 8.0 50.0 9.6 8.0 270.0 5.0 Concrete/Masonry tank 50.0 PVC 1300.0 105 10 0 no Submersible Pump Lowara 15.0 300.0 Solar SZYL-P325-36 23.4 good yes Colorless and odorless 31.5 10550.0 5025.0 Private-Public-Partnership yes 0.05 no NUWACO Water Company 27/03/2019 1. Installation of solar power.
7472 Borehole Somaliland MoWRD April 23, 2022 Woqooyi Galbeed gebiley Arabsiyo 0.8 Horn of Africa 18/06/2020 Arabsiyo borehole 2 9.6620549 43.7683103 1381.0 0 urban yes Yes 2100 140.0 gi 8.0 84.0 10.0 15.0 0.0 0.0 Other 40.0 PVC 300 2 0 no Submersible Pump Grundfos 15.0 84.0 Hybrid - Solar/Generator Perkins 65.0 Dusol 16.38 good Fair condition of supply system no 29.0 7.2 1186.0 806.0 Communal no yes 0.06 no Arabsiyo water agent is responsilbe its intervention.
3161 DWBYBA021 Dug Well FGS_MoEWR Sept. 19, 2019 Bay Baydhaba Al Ahmar Shekh Aden (individual) 2/19/2000 Sheikh Aden 3.1343 43.6336 469.0 4.4 1 1568885151239.jpg yes Yes 2100 150 350 10.0 Yes 14.0 12.5 17.0 13.0 1.0 Concrete/Masonry tank PVC 300.0 300 2 no 1.0 Submersible Pump CHANGFA ZS1115G 16.18 No 30.6 6.79 1540.0 770.0 Yes 0.05 Yes Depth extension, 20 panels solar, spaire sumersible pumb. Strategic Water Sources Survey – WSS_NATl
7719 Dug Well FGS Ministry of Energy and Water Resources May 29, 2022 Hiraan beled_weyne Howlwadaag 23/05/2014 Fiqi 4.441 45.1317 urban yes Yes 2100 13.0 11.0 12.0 3.0 Concrete/Masonry tank 12.0 Galvanised Steel 350 fair no 32.0 7.0 1370.0 690.0 Private/Individual yes 0.01 New water tank and supply of submersible pump
7558 Dug Well FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Buur Cad 1.0 Private 09/06/2012 Buur Cad 2.2122983 45.354525 120.0 rural no 5 No 10 years ago, become dry 2068 90.0 86.0 2.0 Concrete/Masonry tank 35.0 Galvanised Steel 120.0 50 0 0 no Submersible Pump Lowara 7.5kw 89.0 Generator Gangfa125 fair It's not working about 10 years and is collapsed part of the source no Private/Individual yes 0.05 no Private 21-Dec-13 Change the submersible pump Deepening and Decementation and supply of GI pipes and Generator
8232 Dam FGS Ministry of Energy and Water Resources March 18, 2022 Bay bur_hakaba Buurhakaba/khardare 3.0 ACTED 18/11/2020 Khadhare 2.7947788 44.0775267 164.0 rural no 6 No 2050 18 74 38 2.0 5.0 60.0 28.0 Other Other no No Pump poor no 34.0 Other no no Hydrorift 18-Nov-21 How the drought effected
2044 BHWGGE005 Borehole Somaliland_MoWR Jan. 15, 2014 Woqooyi Galbeed Gebiley Botor Kuwait Government 01-06-08 Botor BH2 9.6944 43.5138 1538.0 Rural Yes Yes 2040 50 200 300 168.0 82.0 40.0 2.0 30.0 2115.0 SPI 70 130.0 7.8 1225.0 828.0 Public 0.03 0.15 CARE Somalia Strategic Boreholes Survey – BHS
2046 BHWGGE007 Borehole Somaliland_MoWR Jan. 15, 2014 Woqooyi Galbeed Gebiley Botor Africa 70 01-06-06 Botor BH1 9.6938 43.5147 1539.0 Rural Yes Yes 2040 100 500 1000 180.0 100.0 73.0 8.0 25.0 2015.0 SPI 60 130.0 7.5 3800.0 2560.0 Public 0.03 0.15 Strategic Boreholes Survey – BHS

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors