Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7760 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 28, 2022 | Galgaduud | cabudwaaq | ubax | 5.0 | ceelcade 2 | 27/03/2012 | ceelcade2 | — | 6.249695 | 46.2417367 | 368.0 | — | 1 | — | urban rural | yes | — | Yes | — | 5000 | 400 | 100 | 25000 | — | — | 134.0 | pvc | 6.0 | — | — | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 59.0 | 480 | 2 | 2 | yes | 12 | 9.0 | Submersible Pump | Granfos | — | 120.0 | Generator | perkin | 30.0 | — | — | fair | 1. small strorage capacity 2. pipes are leaching | no | — | 32.0 | 7.09 | 2300.0 | 1261.0 | — | Communal | — | — | — | — | yes | 0.0015 | yes | — | — | — | — | — | — | — | — | — |
7180 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 08/03/2004 | Goldogob water company BH 2 | — | 7.0297561 | 47.005359 | 346.0 | — | 11 | — | rural urban | yes | — | Yes | — | 42000 | — | — | — | 0.0 | — | 215.0 | pvc | 8.0 | 144.0 | 9.0 | 20.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 400.0 | PVC | 13344.0 | 2224 | 1 | 2 | yes | 15 | 10.0 | Submersible Pump | Lowara | 15.0 | 192.0 | Hybrid - Solar/Generator | Parkins | 60.0 | — | — | fair | — | yes | Colorless and odorless | 30.5 | 7.51 | 2950.0 | 1455.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | UNICEF | 08/01/2021 | 1. Construction of new elevated tank | 1. Installation of solar power | — | — |
7263 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 24, 2022 | Galgaduud | cadaado | Bali Higis | 3.0 | Individual | 21/01/2009 | Bali higis | — | 6.1674787 | 46.6330098 | 318.0 | — | 0 | — | rural urban | yes | — | Yes | — | 6400 | 500 | 20 | 85000 | 1.0 | — | 220.0 | pvc | 8.0 | 108.0 | 16.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 80.0 | 30 | 2 | 2 | yes | 16 | 8.0 | Submersible Pump | Granfos | — | 108.0 | Hybrid - Solar/Generator | Doutz | 36.0 | Pm340 | 24.0 | fair | 1. Needs implementation of water supply system for IDPs residents(4km) | no | — | 35.0 | 6.83 | 3460.0 | 1750.0 | — | Private/Individual | — | — | — | — | yes | 0.015 | yes | — | — | — | PAH | 1. Pump and pipes 2. Motor | — | — | — | — |
7237 | — | Borehole | Somaliland MoWRD | April 6, 2022 | Togdheer | burco | Qoyta | 4.0 | IR | 02/08/2019 | Qoyta borehole | — | 9.6760091 | 45.405806 | 1140.0 | — | 0 | — | rural urban | yes | — | No | It stops 07-02-2022, becouse of the pump replacement and one additional pipe is the main reason that the operator told as. | 60000 | 15000 | 20 | 6000 | 0.2 | — | 300.0 | gi | 6.0 | 160.0 | 10.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | Galvanised Steel | 5000.0 | 30 | 1 | 3 | yes | 3 | 9.0 | Submersible Pump | Grundfos | 15.0 | 272.0 | Hybrid - Solar/Generator | Jubaili bros | 45.0 | Vacson | 22.5 | poor | The borehole stops pump does not pumped well and they told problem comes after replacement of the pump and adding extra pipe so in general there is no supply system of qoyta borehole. | no | — | 25.8 | 7.66 | 2360.0 | 1600.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | Somaliland MoWRD | 06/02/2022 | Pump rehabilitation | Not functioning becouse of submersible pump failure, water meter also not functioning and needs replacement, no solar cut off. | — | — |
7089 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 19, 2022 | Nugaal | eyl | Xasbahalle | 0.3 | ICRC | 19/02/2007 | Xasbahalle BH 2 | — | 7.9616741 | 49.1638283 | 512.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1500 | 10000 | — | 15000 | 0.0 | — | 300.0 | pvc | 8.0 | — | 5.0 | 15.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 300.0 | 150 | 1 | 2 | yes | 3 | 24.0 | Submersible Pump | Lowara | 7.5 | 285.0 | Hybrid - Solar/Generator | Parkins | 45.0 | — | 11.0 | fair | Supply is not good | yes | Colorless and odorless | 32.2 | 7.1 | 3570.0 | 1764.0 | — | Communal | yes | 19/02/2007 | 5 | 2 | yes | 0.1 | yes | — | — | — | KAALO Relief and Development | 19/12/2020 | Rehabilitation and extension of solar power | 1. Construction of new kiosks. 2. New generator. 3. Extension solar power. 4. Rehabilitation of kiosks. 6. New one latrine. 7. Reconstruction of generator room. 8. Rehabilitation and Installation of new pump and pipes. | — | — |
7200 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 21, 2022 | Bari | iskushuban | Timirshe | 0.1 | Former Somali Government | 21/12/1986 | Timirshe borehole 1 | — | 10.5612376 | 50.42519 | 272.0 | — | 2 | — | rural urban | yes | — | Yes | — | 6000 | 300 | — | 4500 | — | — | 90.0 | pvc | 10.0 | 45.0 | 7.5 | 19.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 44.0 | Galvanised Steel | — | 50 | 3 | 2 | yes | 6 | 6.0 | Submersible Pump | Lowara | — | 74.0 | Hybrid - Solar/Generator | Perkins | 45.0 | — | — | fair | Yield is low Pipes are rusted. | no | — | 28.5 | 7.74 | 1732.0 | 868.0 | — | Communal | yes | 21/07/2015 | 4 | 3 | yes | 0.03 | yes | — | — | — | Save the children | 19/11/2017 | Installation of solar power system. | 1: Replacement of main raising pipes and submersible pump immediately. 2: Replacement of rusted iron pipes 3: Extention of water supply pipe lines 4: construction of another kiosks | — | — |
7087 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Bari | qardho | Rako raaxo | 4.0 | Other | 04/11/2018 | Rako raaxo borehole 2 | — | 9.7517126 | 49.7252112 | 639.0 | — | 2 | — | rural urban | yes | — | Yes | — | 12000 | 3500 | 60 | 7000 | — | — | 450.0 | pvc | 8.0 | 360.0 | 12.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 32.0 | Galvanised Steel | 700.0 | — | — | 2 | yes | 8 | 9.0 | Submersible Pump | Grundforce | — | 360.0 | Hybrid - Solar/Generator | Perkins | 60.0 | S/M- 250W | 36.0 | good | — | no | — | 33.3 | 6.4 | 3300.0 | 1609.0 | — | Communal | yes | 19/09/1998 | 2 | 3 | yes | 0.026 | yes | — | — | — | — | — | — | Replacement of main raising pipe and submersible pump. Generator room Construction elevated water tank for animals. Water supply system for the town. | — | — |
7252 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Mudug | goldogob | Ring oomane | — | TASS | 09/03/2019 | Ring oomane BH 2 | — | 7.2101855 | 47.1912994 | 373.0 | — | 2 | — | rural urban | yes | — | Yes | — | 3500 | 200 | — | 400 | — | — | 200.0 | pvc | 8.0 | — | 4.0 | 4.0 | — | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 26.0 | Galvanised Steel | 100.0 | — | 1 | 2 | yes | 5 | 8.0 | Submersible Pump | Lowara | 11.0 | 169.0 | Generator | Parkins | 33.0 | — | — | poor | Needs construction water supplies ( koisks, animal throughts) | yes | Colorless and odorless | 39.5 | 7.6 | 2100.0 | 1035.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | — | — | — | 1. Drilling new borehole because of depletion of yield. 2. Installation of generator 4. Installation of solar power 4. Rehabilitation of animal throughts 5. Construction of new kiosks and rehabilitation koisks | — | — |
7165 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 23, 2022 | Bari | qardho | Xingood sare; Qardho | 0.4 | Former Somali Government | 01/03/1980 | Biyacade borehole | — | 9.4964048 | 49.0751164 | 710.0 | — | 9 | — | urban rural | yes | — | Yes | — | 18000 | 700 | — | 10000 | — | — | 286.0 | gi | 8.0 | 130.0 | 8.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | — | — | — | 3 | yes | 5 | 8.0 | Submersible Pump | Lowara | — | 196.0 | Hybrid - Solar/Generator | Perkins | 45.0 | SZYL-m330-36 | 17.16 | fair | 1: The borehole distributes water to the qardho town. 2: Four boreholes including this one, share on storage water tank. 3: The length of pipes is difficult to determine because this borehole distribute water to the qardho city. 4.The yield is low 5.the solar power don't provide enough power . | no | — | 30.5 | 6.55 | 1800.0 | 885.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.013 | yes | — | — | — | DRC - Puntland | 27/06/2020 | Replacement of main raising pipes and submersible pump. | 1: Installation of extra solar panels. 2: this borehole is collapsing due to that it's yield is decreasing and they asked for another borehole same location as this one. | — | — |
7042 | — | Borehole | FGS Ministry of Energy and Water Resources | March 14, 2022 | Hiraan | beled_weyne | Geelgaal | 12.0 | DRC | 05/07/2014 | Geelgaal | — | 4.8459064 | 45.2402339 | 163.0 | — | 20 | — | urban | yes | — | Yes | — | 3500 | — | — | — | — | — | 170.0 | pvc | 8.0 | 110.0 | 20.0 | 5.0 | 15.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 200.0 | 500 | 0 | 0 | yes | 10 | 40.0 | Submersible Pump | Lowara Submarine pump | 8.0 | 110.0 | Generator | Duas fuel generator | 30.0 | — | — | poor | The condition this borehole is normal according the other borehole located in the area, and it need rehabilitation and other concrete water tanker to keep more water | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.1 | yes | — | — | — | Community | 7-Aug-17 | Repair | Generator | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France