Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8059 Borehole Somaliland MoWRD April 6, 2022 Togdheer burco Galoolay 5.0 Kuwait Government 06/04/2020 Galoolay Borehole 9.7881763 45.2949751 1235.0 0 rural yes Yes 3000 5000 1000 20000 0.0 180.0 gi 8.0 140.0 10.0 8.0 0.0 0.0 Concrete/Masonry tank 50.0 Galvanised Steel 200.0 0 0 2 no Submersible Pump Grundfos 11.0 170.0 Solar KANEKA 16.1 good Very good of water supply system they have no 26.7 7.88 1370.0 915.0 Communal no no no There is no intervention carried out Gernator , fence , new tank and rehapilitation of reservior, caretaker room, machine room, connection to the village.
390 BHBRTA002 Borehole Puntland_PWDA Nov. 10, 2019 Bari Taleex Qardho 3.0 NRC - Norwegian Refugee Council 09-03-19 Maxjarka 9.4895 49.0637 743.0 4.9 73377462689.jpg Rural Urban Yes Yes 700 1500 286.0 8.0 Concrete/Masonry tank 30.0 Galvanised Steel 200.0 500 1 2 Yes 8 8.0 Submersible Pump Lowara 15 8.0 186.0 Solar 250w 20.0 Good Good No 28.0 1578.0 1057.0 Private-Public-Partnership Yes 0.026 Yes NRC - Norwegian Refugee Council New borehole 2019-03-10 Fencing, Generator55, pipeline 2000, Strategic Water Sources Survey – WSS_NATl
8111 Borehole Somaliland MoWRD April 7, 2022 Sool las_caanood Higlo 1.5 Private 07/04/2015 Geel caseeye 8.5646566 47.6841849 539.0 2 rural yes Yes 0 40 0 0 3.0 65.0 pvc 8.0 40.0 10.0 8.0 0.0 0.0 Concrete/Masonry tank 48.0 Galvanised Steel 100.0 0 0 0 yes 2 8.0 Submersible Pump Luwara 13.0 30.0 Solar Szyl-p300- 36 300.0 good Two solar panels damaged and need to be changed no 32.0 6.8 1150.0 810.0 Communal no no no Oxfam GB 07/04/2019 Constructed water tank of capacity 48 qubic meter Supply system disconnected due to pipes damage and Water cannot go to water tanks. 2 solar panels also not working
30 BHAWBO023 Borehole Somaliland_MoWRD Dec. 6, 2019 Awdal Borama Dhagaxa madow 3.0 Saudi Government 29-01-16 Dhagaxa madow 10.2644 43.1986 1254.0 4.3 0 1575639433002.jpg Rural Yes Yes 200 20 200 5.0 90.0 GI 8.0 70.0 3.0 6.0 Concrete/Masonry tank 20.0 Galvanised Steel 20.0 2 2 No Submersible Pump Grundfos 11.0 84.0 Solar Photovoltaic 1.4275 Good No 19.0 7.97 634.0 449.0 Communal No No Increasing the number of solar system Increasing volume of water tank Strategic Water Sources Survey – WSS_NATl
7708 Dug Well Puntland Ministry of Energy Minerals and Water April 9, 2022 Sanaag laasqoray Midigale 0.5 ADESO 01/01/2003 Midigale dugwell 1 10.6839932 48.6763163 809.0 3 urban yes Yes 900 12.0 5.0 3.5 2.0 7.0 24.0 Concrete/Masonry tank 25.0 PVC 1500.0 60 1 no Submersible Pump Luwara 12.0 Solar 3.0 poor 1:Submersible pump is not functioning properly. 2:And the well needs to be expanded deeply. no 32.1 7.5 1987.0 995.0 Communal yes 0.01 no CARE-Somaliland 01/01/2017 Elevated water tank Solar Submersible pump 1:Immediate change of the submersible pump 2:PVC pipes 3:Digging the well deeply 4:Generator if possible or solar power storage of battery.
7685 Dug Well Somaliland MoWRD May 9, 2022 Awdal zeylac Garbodadar 1.5 UNICEF 08/03/2017 Garbodadar dug well 10.2208626 43.6261773 468.0 urban yes Yes 17500 9.0 3.0 3.0 8.0 Concrete/Masonry tank 24.0 PVC 3000.0 2500 6 0 no Submersible Pump 3.5 8.0 Solar Axitec 5.6 fair The supply is well connected to a public points within the village no Utility/Local Authority yes 0.02 no GIZ Construction of reservoir Reservoir geomembrane replacement
7652 Dug Well Somaliland MoWRD May 9, 2022 Awdal zeylac Sheed dheer Sheed dheer dug well 10.3008612 43.5226104 664.0 urban yes Yes 1400 10.0 5.0 1.5 Concrete/Masonry tank 25.0 PVC 1000.0 200 2 no Submersible Pump 2.0 9.0 Solar Axitec 1.4 fair The system js well connected to the reservoir. There is no connected households. no 32.4 7.5 1450.0 1020.0 Communal no yes 0.02 no Reservoir construction Solar panel extension
8392 Spring FGS Ministry of Energy and Water Resources March 25, 2022 Bakool ceel_barde Cimilow 3.0 Action Afrika Hilfe e.V 25/11/2009 Cimilow shallow well 4.7944705 43.677324 446.0 1 rural urban yes Yes 300 100 500 3000 3.0 35.0 Concrete/Masonry tank 3.0 Galvanised Steel 15.0 200 5 5 yes 5 30.0 Surface mounted Pump Surface mounted Solar 1000.0 good A dequet of water supply system is not available to the area yes Testy Good and Smell Fresh Communal yes 25-Mar-09 3 2 no no ARDO 27-Mar-21 Sample intervation Sample intervation
634 BHGLCB024 Borehole SWALIM_GSA April 1, 2018 Galgaduud Cabudwaaq Mirjeecley Community 09-02-14 Roobday BH 5.9267 46.3649 317.0 Rural Yes Yes 300 3000 1.0 153.0 32.0 14.0 16.0 38.0 Solar Pump 120.0 Solar 33.7 7.19 2905.0 1452.0 Private Improve Generator room, store room, solar system and water tank construction Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS
7605 Dug Well Somaliland MoWRD May 9, 2022 Awdal baki Baki 1.0 GAA 09/03/2016 Baki dug well 1 10.027075 43.3709305 1009.0 2 urban rural yes Yes 5000 8.0 4.0 1.5 8.0 Concrete/Masonry tank 85.0 PVC 2700.0 700 8 0 no Submersible Pump 1.5 7.0 Solar Axitec 8.4 fair no 33.0 7.48 700.0 510.0 Private/Individual yes 0.03 no

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors