Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7429 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Aljaziira/ Galkacayo | — | Private | 06/03/2017 | Aljaziira BH | — | 6.8009848 | 47.4198503 | 258.0 | — | 20 | — | urban | yes | — | Yes | — | 3500 | — | — | — | — | — | 205.0 | pvc | 8.0 | — | 60.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 200.0 | PVC | 6000.0 | 500 | 4 | 0 | yes | 10 | 8.0 | Submersible Pump | Lowara | 18.0 | 150.0 | Generator | Parkins | 160.0 | — | — | good | — | yes | Colorless and odorless | 29.6 | 8.08 | 2540.0 | 1270.0 | — | Private/Individual | — | — | — | — | yes | 0.1 | no | — | — | — | Private | — | Rehabilitation of generator | 1. Installation of solar power | — | — |
7430 | — | Borehole | Somaliland MoWRD | May 12, 2022 | Togdheer | burco | Qoyta | 3.0 | Islamic Relief | 05/08/2017 | Qoyta Borehole | — | 9.67620878946036 | 45.4057746380568 | 1140.0 | — | 1 | — | rural urban | yes | — | Yes | — | 5000 | 3000 | 0 | 7000 | 15.0 | — | 320.0 | gi | 8.0 | 315.0 | 18.0 | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 1500.0 | 7000 | 4 | 5 | no | — | — | Submersible Pump | Laware | 18.0 | 294.0 | Hybrid - Solar/Generator | Perkins | 55.0 | Lorentz | 15.0 | good | Good Condition | no | — | 30.0 | 7.5 | 2400.0 | 1700.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.1 | no | — | — | — | — | — | — | 1. Rehabilitation of the solar 2. Increasing the yield of the Borehole | — | — |
7431 | — | Borehole | Somaliland MoWRD | May 9, 2022 | Togdheer | burco | Plaza area | 1.0 | Privately owned by ilma biniin | 04/08/2015 | Biniin iyo Bohol | — | 9.51071611605585 | 45.5550388991833 | 1019.0 | — | 1 | — | rural urban | yes | — | Yes | — | 0 | 0 | 0 | 0 | 80.0 | — | 130.0 | pvc | 8.0 | 107.0 | 14.0 | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Other | — | 0 | 0 | 0 | no | — | — | Submersible Pump | Laware | 18.0 | 107.0 | Generator | Perkins | 110.0 | — | — | good | Good Condition | no | — | 30.0 | 7.9 | 2000.0 | 830.0 | — | Private/Individual | — | — | — | — | yes | 0.1 | no | — | — | — | — | — | — | Solar installation New pump | — | — |
7432 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Bari | iskushuban | Foocaar | 7.0 | UNICEF | 21/09/2005 | Lodhuda spring | — | 10.3309356 | 50.8652081 | 10.0 | — | 4 | — | urban rural | yes | — | Yes | — | 1500 | 200 | — | 1000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 0.5 | — | — | — | — | Concrete/Masonry tank | 10.0 | Galvanised Steel | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | poor | The yield is low. No submersible pump, solar power installation and generator. | no | — | 29.6 | 7.6 | 1740.0 | 875.0 | — | Communal | no | — | — | — | yes | 0.1 | no | — | — | — | Puntland MoEMW | 24/10/2019 | Replacement of distribution pipe lines. | 1: To asset a way of increasing the yield of water, or provide another way of water sources. 2: Distribution pipe line and its accessories such as valves, tee, elbow, couple. 3: Construction of a dug well or distribution of water from another spring which is far from the village to 10 kilometer, due to water demand 5: Construction of elevated water tank and kiosks. | — | — |
7433 | — | Borehole | Somaliland MoWRD | May 8, 2022 | Togdheer | burco | Plaza Area | 0.5 | BWA | 04/01/2016 | Ceelka 13aad | — | 9.51858391519636 | 45.5518577992916 | 1010.0 | — | 1 | — | rural urban | yes | — | Yes | — | 10000 | 0 | 0 | 0 | 0.0 | — | 140.0 | pvc | 8.0 | 96.8 | 32.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | Galvanised Steel | 100.0 | 15000 | 0 | 0 | yes | 10 | 8.0 | Submersible Pump | Laure | 18.0 | 120.0 | Generator | Perkins | 30.0 | — | — | good | The supply system is functioning | no | — | 26.0 | 7.8 | 1650.0 | 970.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.1 | no | — | — | — | — | — | — | Solar installation New water tank | — | — |
7435 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Sool | las_caanood | Laascaanood | 5.0 | Private | 06/07/2017 | Saafi borehole | — | 8.5067052 | 47.4031734 | 624.0 | — | 1 | — | rural urban | yes | — | Yes | — | 60000 | 0 | 0 | 0 | 0.0 | — | 180.0 | pvc | 8.0 | 10.0 | 40.0 | 24.0 | 1.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 13.0 | — | 0 | 0 | yes | 40 | 9.0 | Submersible Pump | Lawara | 11.0 | 170.0 | Generator | EVECO MOTOR | 450.0 | — | — | good | This is a company borehole that filters the salt water to fresh water. | no | — | 29.0 | 7.3 | 1470.0 | 110.0 | — | Private/Individual | — | — | — | — | yes | 0.1 | no | — | — | — | — | — | — | This is the second largest company that supply water to Laascaanood District. This is a private and commercial company.it is a big factory that contains a complete interconnected system. | — | — |
7460 | — | Borehole | Somaliland MoWRD | April 27, 2022 | Woqooyi Galbeed | gebiley | Carro yaanbo | 0.4 | Zamzam | 25/03/2021 | Zamzam borehole | — | 9.6435563 | 43.8028951 | 1388.0 | — | 0 | — | rural urban | yes | — | Yes | — | 13000 | 0 | 50 | 300 | 6.0 | — | 163.0 | gi | 8.0 | 100.0 | 15.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 160.0 | 1858 | 0 | 0 | yes | 25 | 10.0 | Submersible Pump | Grundfos | 30.0 | 153.0 | Hybrid - Solar/Generator | Perkins | 45.0 | Renewsys | 22.8 | good | Supply system is fair | no | — | 30.0 | 7.35 | 2340.0 | 1650.0 | — | Private/Individual | — | — | — | — | yes | 0.06 | no | — | — | — | — | — | — | — | — | — |
7436 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 10, 2022 | Sanaag | laasqoray | Hadaaftimo | 4.0 | DRC - Puntland | 24/08/2018 | Hadaaftimo Borehole 2 | — | 10.7383828 | 48.1134322 | 1292.0 | — | 2 | — | rural urban | yes | — | Yes | — | 18000 | — | — | 500 | 1.0 | — | 400.0 | pvc | 8.0 | 276.0 | 17.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 98.0 | PVC | — | 1 | 5 | — | yes | 25 | 9.0 | Submersible Pump | Lowara | — | 233.0 | Hybrid - Solar/Generator | Perkins | 45.0 | JCNS-M36V370 | 22.2 | good | But the village has no water supply system. The water kiosks are not sufficient to the village. | no | — | 32.5 | 7.2 | 1361.0 | 671.0 | — | Communal | yes | 20/09/2015 | 3 | 2 | yes | 0.1 | — | — | — | — | NRC | 26/08/2020 | Replacement of main raising pipes and submersible pump. | 1: amergency replacement of main raising pipes and submersible pump. 2: Replacement of electric cable. 3: pipes and pipe fitting equipments. 4: Construction of elevated water tank. 5: Rehabilitation of elevated water tank in order to stop water leaking. 6: Generator 7: Replacement of solar position due crossing river. 8: Construction of caretaker room. 9: Solar power storage ( battery) | — | — |
7440 | — | Borehole | Somaliland MoWRD | May 11, 2022 | Togdheer | burco | Kabadheere | 0.5 | Former Somali government | — | Kabadheere 1 | — | 9.47279579937458 | 45.4414812102914 | 1051.0 | — | 1 | — | rural | yes | — | Yes | — | 10000 | 3000 | 0 | 5000 | 120.0 | — | 166.0 | pvc | 8.0 | 136.0 | 12.0 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 100.0 | 1000 | 2 | 5 | yes | 20 | 8.0 | Submersible Pump | Grundfos | 18.0 | 123.0 | Hybrid - Solar/Generator | Perkins | 45.0 | Lorentz | 15.0 | good | Good Condition | no | — | 27.0 | 7.8 | 1000.0 | 500.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.1 | no | — | — | — | — | — | — | Provision of fence | — | — |
7441 | — | Borehole | Somaliland MoWRD | May 10, 2022 | Togdheer | burco | Area Karasharka | 2.0 | Buroa Water Agency | 05/11/2019 | Ceelka 12aad | — | 9.54251257237047 | 45.4892825335264 | 1040.0 | — | 4 | — | rural | yes | — | Yes | — | 1000 | 0 | 0 | 0 | 25.0 | — | 112.0 | pvc | 8.0 | 67.0 | 27.0 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Galvanised Steel | — | 2000 | 0 | 0 | yes | 4 | 8.0 | Submersible Pump | Grundfos | 29.0 | 87.0 | Hybrid - Solar/Generator | Perkins | 35.0 | Lorentz | 15.0 | good | Good Condition | no | — | 29.0 | 7.5 | 800.0 | 389.0 | — | Utility/Local Authority | — | — | — | — | yes | 0.1 | no | — | — | — | — | — | — | New Water Tank | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France