Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7543 Borehole FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Carafaag 0.0 IR 10/08/2012 Carafaag 2.2789441 45.3952772 141.0 rural yes Yes 3080 0.5 150.0 pvc 8.0 7.0 Concrete/Masonry tank 15.0 Galvanised Steel 80.0 460 1 no Submersible Pump Lowara 10kw 140.0 Generator Duos 30.0 fair Good no Private/Individual yes 0.05 no IR 9-Mar-17 Construction of water kiosks and animal water troughs. Solar system, Generator, submersible pump, GI pipes, construction of elevated water tank and fence and gate.
7544 Borehole FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Deegaanley 3.0 ZamZam Foundation 11/10/2017 Maxaadey Cali Waran 2.2764147 45.3412411 87.0 rural yes Yes 2860 148.0 gi 8.0 4.0 Concrete/Masonry tank 15.0 Galvanised Steel 60.0 450 1 Submersible Pump Franklin electric 11kw 139.0 Generator Duos 30.0 fair Good no Private/Individual yes 0.05 no Tamkin Foundation 11-Oct-15 Construction of Generator room and animal troughs and supply of Generator Elevated water tank, submersible pump and full rehabilitation.
7545 Borehole FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Warsalaama 1.0 ZamZam Foundation 10/09/2015 Macalim Xassan 2.1740353 45.3538656 89.0 rural yes Yes 2870 100 70 150 138.0 gi 8.0 6.0 Concrete/Masonry tank 30.0 Stainless Steel 80.0 400 1 3 no Submersible Pump Franklin electric 15kw 118.0 Generator Duos 30.0 fair It's in a good condition no Private/Individual yes 0.05 no Zamzam 12-Apr-18 Rehabilitation and supply of Generator Construction of elevated water tank and full rehabilitation
7666 Borehole FGS Ministry of Energy and Water Resources April 26, 2022 Lower Shabelle afgooye Elasha GTZ 17/12/1979 Elasha biyaha 26 2.09064 45.213915 urban yes Yes 7200 200.0 25.0 36.0 24.0 Concrete/Masonry tank 30.0 1200 Submersible Pump Elect Submersible pump 175.0 fair no Private/Individual yes 0.02 Rehabilitation
7552 Borehole FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Muuri 1.0 Italian Government 10/11/1985 Muuri 2.1522677 45.3763316 70.0 rural yes Yes 2890 120.0 gi 8.0 6.0 Steel tank 15.0 Galvanised Steel 35.0 210 1 no Submersible Pump Lowara 5.5kw 103.0 Generator Gangfa125 poor It's in a bad situation no Other yes 0.05 no Private 10-Dec-19 Rehabilitation of elevated water tank and change submersible pump Construction of elevated water tank, generator and caretaker room fence and gate, supply of Generator and solar system.
7553 Borehole FGS Ministry of Energy and Water Resources March 15, 2022 Middle Shabelle balcad Maqaar carees 0.0 IR 15/10/2018 Shabelle 2 2.3512984 45.3989917 94.0 urban yes Yes 3350 120.0 gi 8.0 90.0 4.0 Concrete/Masonry tank 35.0 PVC 80.0 560 5 3 yes 4 8.0 Submersible Pump Lowara 7.5kw 40.0 96.0 Generator Duos 30.0 fair It's in a good condition no Private/Individual yes 0.05 no Owner 16-Aug-21 Change the submersible pump, Rehabilitation of animal troughs Rehabilitation of animal troughs, supply of Generator, construction of elevated water tank.
7562 Borehole FGS Ministry of Energy and Water Resources March 20, 2022 Middle Shabelle balcad Baaloow 1.0 Private 11/08/2015 Dr. Suufi 2.3332717 45.3186967 92.0 rural yes Yes 2580 150 300 450 2.0 115.0 gi 8.0 56.0 6.0 Concrete/Masonry tank 35.0 PVC 80.0 98 1 2 no Submersible Pump 7.5kw 86.0 Generator Duos 20.0 good It's in a good condition no Private/Individual yes 0.05 no Private 16-Nov-18 Pump change and pipeline extensions Solar system, animal troughs and supply of Generator
7563 Borehole FGS Ministry of Energy and Water Resources March 17, 2022 Middle Shabelle balcad Tuurey 2.0 Private 14/06/2021 Labi Salaam 2.2891239 45.4292968 165.0 rural yes Yes 4860 100 300 500 0.25 115.0 pvc 8.0 6.0 Plastic tank 20.0 PVC 80.0 500 1 no Submersible Pump Varuna 15kw 85.0 Generator DIESEL GENERATING SET 60.0 good It's in a good condition no Private/Individual yes 0.05 no Private 11-Oct-21 Change the submersible pump Elevated water tank, animal troughs, solar system, water kiosk, generator and caretaker room and Generator.
7576 Borehole Puntland Ministry of Energy Minerals and Water March 27, 2022 Nugaal garowe Garowe 1.5 NUWACO Water Company 27/03/2021 Ligle BH 3 8.3675717 48.4510035 436.0 5 urban yes Yes 9100 160.0 pvc 8.0 21.0 24.0 1.3 Concrete/Masonry tank 70.0 PVC 7000.0 1300 0 0 no Submersible Pump Lowara 30.0 60.0 Generator Parkins, Iveco 270.0 good no Private-Public-Partnership yes 0.05 no NUWACO Water Company 27/03/2022 1. Rehabilitation of riser pipes
7565 Borehole FGS Ministry of Energy and Water Resources March 16, 2022 Middle Shabelle balcad Hareer Madowe 1.5 Private 11/10/2016 Hareer Madowe 2.2332162 45.3958659 146.0 rural yes Yes 3860 150.0 gi 8.0 8.0 Concrete/Masonry tank 30.0 Galvanised Steel 60.0 320 1 no Submersible Pump Lowara 15kw 80.0 Generator Duos 30.0 fair Good no Private/Individual yes 0.05 no Private 11-Aug-20 Installation of Solar system, submersible pump and GI pipes. Construction of elevated water tank, animal troughs, fence and gate, water kiosk, supply of Generator and New BH.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors