Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
3802 DWLSWA001 Dug Well FGS_MoEWR Oct. 15, 2019 Lower Shabelle Wanla Weyn Warta Da'ud Buule Jimciyada Tadaman al islam 2/10/2014 Ibnu Mubarag BH 2.616 44.8845 90.0 4.288 0 yes Yes 2250 No 18.0 10.0 Concrete/Masonry tank PVC 1500.0 300 0 0 yes 2 15.0 Caprari 20.0 120.0 Submersible Pump Gangfa 24.0 No 30.7 7.3 1500.0 760.0 Yes 10/14/2015 5 0 Yes 0.025 No Rehabilitation of water tank, new large water tanks, Solar system, pump with pipes, stores, and well head protection. Strategic Water Sources Survey – WSS_NATl
1245 BHMDGK106 Borehole Puntland_PWDA Nov. 23, 2019 Mudug Galkacyo Buubi 1.0 TASS 13-04-12 Buubi_Bh 7.1373 48.3791 257.0 4.9 1573638024362.jpg Rural Yes Yes 5000 150 110000 302.0 Concrete/Masonry tank 30.0 PVC 1500.0 44 5 2 Yes 10 6.0 Submersible Pump Lowara 15 258.0 Generator Perkins 75.0 Poor Low yield No 31.8 5120.0 2560.0 Communal Yes 0.03 Yes Community GI pipes 2019-03-23 Solar system Pair of water tank Extension of animal troughs Fencing Strategic Water Sources Survey – WSS_NATl
1496 BHNGGA047 Borehole Puntland_PSAWEN Dec. 30, 2013 Nugaal Garoowe Sunijiif Italian Government 01-09-88 Sunijiif BH1 8.5383 48.9869 356.0 Rural Urban Yes Yes 120.0 30.0 8.0 4.0 25.0 1500.0 Lowara 5.5kW 72.0 8.0 2580.0 1700.0 Public 0.05 CARE Somalia Water tank and two kiosks 2013-11-01 Pump, Rising and main Strategic Boreholes Survey – BHS
8353 Borehole FGS Ministry of Energy and Water Resources March 17, 2022 Hiraan beled_weyne Maxaas hiran Somalia Government of Somalia 13/11/1985 Maxaas water supply 4.3906345 46.0911612 147.0 1 urban yes Yes 15000 138.0 pvc 10.0 38.0 19.0 24.0 15.0 1.0 Concrete/Masonry tank 50.0 PVC 1500.0 2142 2 3 yes 6 40.0 Submersible Pump Comoco mersble pump 10.0 38.0 Generator Doze 30.0 good Good no Utility/Local Authority no no GSA 15-Nov-17 Rehabilitation, water tanker, generator, two water kiosks, pipeline Generator
7462 Borehole Somaliland MoWRD April 24, 2022 Woqooyi Galbeed gebiley Arabsiyo 1.0 Horn of Africa 22/07/2012 AWA borehole 9.6470433 43.7554301 1372.0 0 urban yes Yes 2800 140.0 gi 8.0 70.0 40.0 17.0 0.0 0.0 Concrete/Masonry tank 20.0 Galvanised Steel 1500.0 400 1 1 no Submersible Pump Grundfos 17.0 104.0 Hybrid - Solar/Generator Perkins 65.0 Raw power 9.6 fair Very good condition of supply system no 29.0 7.7 1935.0 1420.0 Communal no yes 0.06 no
672 BHGLCD025 Borehole SWALIM_GSA Feb. 13, 2016 Galgaduud Cadaado Galinsor 13-02-02 Durdurweyne BH2 6.4241 46.7068 339.0 Rural Urban Yes Yes 4000 500 1000 Yes 200.0 160.0 20.0 15.0 25.0 1500.0 No Pump Caprari 28.6 7.4 3140.0 1560.0 Community Pump, pipes, new motor Strategic Water Sources Survey in Galmudug State – WSS_GM
8097 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Guryasammo IDP 2.0 UNICEF 28/11/2019 Guryasamo IDP Borehole 9.36975023243576 45.521302241832 1039.0 1 rural yes Yes 2000 3000 20 30000 60.0 374.0 pvc 8.0 365.0 24.0 5.0 Concrete/Masonry tank 40.0 Galvanised Steel 1500.0 20000 3 3 no Submersible Pump Laware 24.0 325.0 Hybrid - Solar/Generator Perkins 45.0 Lorentz 15.0 good Good Condition no 29.0 7.6 1200.0 779.0 Utility/Local Authority no no 07/10/2021 Supply and installation of submersible pump. Supply and installation of Rising pipe. Pipeline extension 550m Construction of 3 water kiosks Construction of 2 shoat troughs Construction of camel throughs. Solar installation
7822 Borehole Somaliland MoWRD April 14, 2022 Sool las_caanood Samokaab 3.0 IR 14/04/2018 Samokaab borehole 8.6757978 47.0947488 636.0 1 urban rural yes Yes 3500 600 0 1460 0.0 158.0 pvc 8.0 96.0 20.0 10.0 0.0 0.0 Concrete/Masonry tank 40.0 Galvanised Steel 1500.0 300 6 3 yes 30 9.0 Submersible Pump Luwara 11.0 90.0 Hybrid - Solar/Generator Perkins 45.0 Photovoltiac 300.0 good Pipelines line problem exists no 29.0 7.5 4000.0 300.0 Communal yes 14/04/2018 4 2 no no ACTED 12/11/2021 Installed solar system and constructed two kiosk 500m pipelines require change due pipe weakness
8039 Borehole Somaliland MoWRD March 30, 2022 Togdheer buuhoodle Dan-Dan 1.0 IR 16/02/2016 Dan Dan Borehole 8.25139459222555 46.5295369829983 649.0 1 rural urban yes Yes 2000 10000 200 15000 0.0 370.0 pvc 8.0 260.0 48.0 10.0 Concrete/Masonry tank 36.0 PVC 1500.0 12000 4 5 yes 10 16.0 Submersible Pump GRoundfors 15.0 280.0 Hybrid - Solar/Generator P50-3000 50.0 The solar isn't functioning 330.0 good The supply system is good however the pipeline of the village needs to change from Galvanized to PVC no 34.0 7.2 1470.0 2300.0 Communal no no no CARE Somalia 30/03/2021 Installation of submersible pump 15KW and cable, Installation of rising pipes, Construction of elevated water tank 25Cubic meters, construction of camel troughs, rehabilitation of goat through and water kiosk, rehabilitation of supply system, supply and installation of solar inverter. Currently the needs of this borehole are supply and installation of solar system which is not functioning, moreover, the pipeline of the village needa to change and install PVC.
3713 DWHRBE018 Dug Well FGS_MoEWR Sept. 25, 2019 Hiraan Belet Weyne Buundoweyn 8/23/2012 WAADI 4.7324 45.2116 182.0 4.288 5 1569388802766.jpg yes Yes 4200 No 10.0 5.0 16.0 12.0 3.0 Concrete/Masonry tank PVC 1500.0 700 0 0 yes 3 6.0 Ganga/100 115.0 Hand Pump The pump is not sufficient No 30.7 7.26 1575.0 1413.0 Yes 5/19/2012 3 0 No No 0 Motors,Solar, water tanks, pump with pipes and moter digging the hole,and storage tanks Strategic Water Sources Survey – WSS_NATl

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors