Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7528 Borehole Puntland Ministry of Energy Minerals and Water March 10, 2022 Mudug goldogob Bursalaax CARE Somalia 10/01/1994 Bursaalax BH, ceel weyne 7.1802309 47.242755 355.0 4 urban yes Yes 3000 210.0 gi 6.0 17.0 15.0 3.0 Concrete/Masonry tank 68.0 PVC 4000.0 350 4 2 yes 9 8.0 Submersible Pump Lowara 11.0 170.0 Hybrid - Solar/Generator Parkins 20.0 YL365D-36b 12.77 fair yes Colorless and odorless 31.6 7.6 1940.0 1299.8 Communal no yes 0.05 no IRC 10/03/2019 1. Installation of solar power 1. Construction of new elevated tank 2. Rehabilitation of generator 3. Fancing. 4. Caretaker rooms construction. 5. Rehabilitation of pump and riser pipes 6. Extension of pipelines.
3896 DWMDHO038 Dug Well SWALIM_GSA April 1, 2018 Mudug Hobyo Bacadweyn Private 03-07-05 5.2688 47.9113 122.0 4 Yes Yes 600 300 180 2000 30.0 12.0 7.0 Elect Submersible pump 26.0 29.1 7.9 2350.0 1170.0 GALHOBSH34 Private CPD Construction of elevated water tank, generator room and store room and generator and pump supply 2005-07-04 Rehabilitate supply pipes replacement, pump, elevated water tank, solar system and fencing Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS
1140 BHMDGK027 Borehole Puntland_PWDA Nov. 13, 2019 Mudug Galkacyo Galkacyo 0.0 Galkacyo Water company 19-11-07 GALWA BH4 6.7921 47.414 292.0 4.9 4 1573280458873.jpg Urban Yes Yes 220.0 26.0 Submersible Pump Lowara 15kW 126.0 No Private-Public-Partnership UPVC casign repair 2016-11-19 Repair of pump and GI PIPES, solar source power Strategic Water Sources Survey – WSS_NATl
8555 Dam FGS Ministry of Energy and Water Resources April 24, 2022 Bakool waajid Tuullo Siraad Community_ 23/01/1925 Tuulo Siraad 3.804705 43.221231 4 rural yes Yes 1333 3.0 190 No Pump good no Communal Rehabilitation
2026 BHWGBE031 Borehole Somaliland_MoWRD Oct. 9, 2019 Woqooyi Galbeed Berbera Berbera 15.0 Somaliland MoWRD - Ministry of Water Resources Development 21-10-18 Kalajabbh1 10.2571 45.1077 355.0 4.9 4 1570600297496.jpg Urban Yes Yes 130.0 PVC 8.0 70.0 35.0 15.0 3.0 5.0 Concrete/Masonry tank 50.0 PVC 15.0 3500 Good No 29.6 7.77 7150.0 580.0 Utility/Local Authority Yes 3 Strategic Water Sources Survey – WSS_NATl
2029 BHWGBE034 Borehole Somaliland_MoWRD Oct. 30, 2019 Woqooyi Galbeed Berbera Kalajab2 20.0 African Releaf 11-02-18 Kalajab2 10.2543 45.1148 345.0 4.9 4 1572438944396.jpg Urban Yes Yes 117.0 PVC 8.0 30.0 30.0 18.0 Concrete/Masonry tank 50.0 PVC 18000.0 3000 Yes 10 8.0 Good No 29.6 7.77 7150.0 550.0 Utility/Local Authority Yes Strategic Water Sources Survey – WSS_NATl
2030 BHWGBE035 Borehole Somaliland_MoWRD Oct. 30, 2019 Woqooyi Galbeed Berbera Kaljab 18.0 African Releaf 11-01-18 Kalajab3 10.2552 45.117 340.0 4.9 4 1572439300936.jpg Urban Yes Yes 116.0 PVC 8.0 28.0 30.0 18.0 Concrete/Masonry tank 50.0 PVC 18000.0 3000 No Good No 29.6 7.75 7150.0 580.0 Utility/Local Authority Yes Strategic Water Sources Survey – WSS_NATl
2031 BHWGBE036 Borehole Somaliland_MoWRD Oct. 30, 2019 Woqooyi Galbeed Berbera Kalajab 18.0 Nakhil foundation 13-01-18 Kalajab4 10.2558 45.1172 341.0 4.7 4 1572439469159.jpg Urban Yes Yes 150.0 PVC 8.0 50.0 24.0 18.0 2.0 3.0 Concrete/Masonry tank 50.0 PVC 18000.0 3000 No Good No 28.0 7.8 7165.0 550.0 Utility/Local Authority Yes Strategic Water Sources Survey – WSS_NATl
6019 DMWGHA011 Dam Somaliland_MoWRD Sept. 30, 2019 Woqooyi Galbeed Hargeisa Salaxley GIZ 3/30/2019 Salaxleydam2 9.0289 44.2123 1204.0 4.7 4 1569839932891.jpg No 5 Yes 200 600 3.0 15.0 50.0 40.0 Steel tank Stainless Steel 2.0 2 2 No yes Water is red color 30.5 8.1 260.0 140.0 No No Strategic Water Sources Survey – WSS_NATl
7005 Dug Well FGS Ministry of Energy and Water Resources March 21, 2022 Gedo belet_xaawo Malkariyey 15.0 NCA 21/03/2022 Ceel macaan 3.97994 41.9067 124.0 4 rural yes Yes 12000 500 10000 15700 3.0 16.0 4.0 5.0 24.0 4.0 6.0 Concrete/Masonry tank 24.0 PVC 0.0 0 0 4 yes 18 15.0 Surface mounted Pump Hydroelectric 24.0 Generator India 100.0 poor Poor supply system yes Private/Individual yes 5 yes COOPI 21-Mar-22 Construction of animal trough Rehabilitation and renovation and piping system

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors