Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8373 | — | Dug Well | Somaliland MoWRD | April 30, 2022 | Woqooyi Galbeed | hargeisa | Xaraf | 0.5 | Somaliland MoWRD | 30/04/2017 | Wakaalada 1 | — | 9.5413112 | 43.989002 | 1285.0 | — | 3 | — | urban | yes | — | Yes | — | 2000 | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | 8.0 | 1.5 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 30.0 | Galvanised Steel | 8000.0 | 300 | 5 | — | no | — | — | Submersible Pump | — | 1.5 | 8.0 | Generator | Perkins | 45.0 | — | — | fair | The water comes from the xaraf to sheilh mubarak, the conmection are not well connected | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 30/04/2017 | — | Pump replacement | — | — |
8374 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 21, 2022 | Middle Shabelle | jowhar | Lamo Wab | 0.0 | Former Somali Government | 12/07/1987 | Lamo Wab | — | 2.86857 | 45.53319 | — | — | — | — | rural | yes | — | Yes | — | 4890 | — | 150 | 100 | — | — | — | — | — | — | — | — | — | — | 9.0 | 5.5 | — | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 15.0 | Galvanised Steel | 20.0 | 390 | 2 | — | no | — | — | Submersible Pump | 1kw | — | 8.0 | Solar | — | — | — | — | good | It's in a good condition | no | — | — | — | — | — | — | Communal | yes | 11-Oct-21 | 4 | 3 | no | — | no | — | — | — | GSA | 13-Mar-22 | Rehabilitation of elevated water tank, generator room, communal water points, supply of solar system, submersible pump, pipeline extensions, GI pipes and fittings | Fence and gate | — | — |
8375 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 21, 2022 | Middle Shabelle | jowhar | Gafay | 0.0 | Former Somali Government | 10/06/1987 | Gafay | — | 2.88381 | 45.54169 | — | — | — | — | rural | yes | — | Yes | — | 2980 | — | 100 | 50 | — | — | — | — | — | — | — | — | — | — | 9.0 | 4.5 | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 15.0 | Galvanised Steel | 15.0 | 387 | 2 | — | no | — | — | Submersible Pump | 1kw | — | 8.0 | Solar | — | — | — | — | good | It's in a good condition | no | — | — | — | — | — | — | Communal | yes | 18-Oct-21 | 4 | 3 | no | — | no | — | — | — | GSA | 10-Mar-22 | Rehabilitation of elevated water tank, communal water points, generator room and supply of solar system, submersible pump and GI pipes. | Fence and gate and caretaker room | — | — |
8467 | — | Dug Well | FGS Ministry of Energy and Water Resources | April 26, 2022 | Bay | bur_hakaba | Jameco zone 2 | 10.0 | Community | 25/11/2009 | Fathurahman | — | 2.866825 | 43.002215 | — | — | 6 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 40.0 | 20.0 | 6.0 | 12.0 | 4.0 | 4.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 3.0 | PVC | 3.0 | 9000 | 1 | 35000 | no | — | — | — | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | yes | — | 4 | 0 | no | — | — | — | — | — | — | — | Improve | Development (complete solar system with small pump is needed constructing water throughs | — | — |
8405 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 23, 2022 | Hiraan | beled_weyne | Buulotimiro | 5.0 | Community | 19/11/2005 | Timiro | — | 4.7225178 | 45.1927405 | 154.0 | — | 2 | — | rural urban | yes | — | Yes | — | 4025 | 0 | 208 | 1500 | — | — | — | — | — | — | — | — | — | — | 9.0 | 2.0 | 8.0 | 12.0 | 3.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 35.0 | PVC | 300.0 | 575 | 2 | 1 | no | — | — | Hand Pump | — | 5.0 | — | — | — | — | — | — | good | Ok | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | Community | 23-Mar-20 | Rehabilitation | Solar system | — | — |
8377 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 21, 2022 | Middle Shabelle | jowhar | Timiro | 0.0 | Former Somali Government | 17/06/1986 | Timiro | — | 2.8093573 | 45.5366815 | 107.0 | — | — | — | rural | yes | — | Yes | — | 2980 | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | 6.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 5.0 | PVC | 15.0 | 70 | 1 | 0 | no | — | — | Submersible Pump | 1.5 kw | — | 8.0 | Solar | — | — | — | — | fair | It's in a normal condition | no | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | no | — | no | — | — | — | IMC | 15-Jun-22 | Rehabilitation of shallow well and installation of Solar systems | Deepening of the source and Generator room and supply of Generator | — | — |
8760 | — | Dam | FGS Ministry of Energy and Water Resources | March 22, 2022 | Bay | bur_hakaba | Goodka | 12.0 | Community_ | — | Janaay | — | 0 | 0 | — | — | 4 | — | rural | no | 6 | No | It dry | 920 | 256 | 54 | 140 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Other | — | — | — | — | no | — | — | No Pump | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Other | — | — | — | — | no | — | no | — | — | — | Agency not specified | 22-Mar-22 | — | — | — | — |
8384 | — | Dug Well | FGS Ministry of Energy and Water Resources | June 11, 2022 | Gedo | luuq | Quracbuul VIlage | 1.0 | World Vision | 06/02/2005 | Shallow well system | — | 3.7831932 | 42.5484711 | 121.0 | — | 2 | — | urban | yes | — | Yes | — | 3000 | — | — | — | — | — | — | — | — | — | — | — | — | — | 16.0 | 4.0 | 3.0 | 24.0 | 1.5 | 6.0 | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 10.0 | PVC | 1.0 | 500 | 1 | 0 | no | — | — | Submersible Pump | Groundfos | 2.0 | 3.0 | Solar | — | — | — | 275.0 | good | Itisfunctional | yes | Order | — | — | — | — | — | Communal | yes | 5-Jun-21 | 4 | 6 | no | — | no | — | — | — | — | — | — | — | — | — |
8414 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 30, 2022 | Bakool | waajid | Waaberi | 0.0 | Action Afrika Hilfe e.V | 03/11/2008 | Jaamac well | — | 3.80793 | 43.2498862 | 347.0 | — | 18 | — | urban | yes | — | Yes | — | 96 | — | — | — | — | — | — | — | — | — | — | — | — | — | 11.0 | 1.0 | 1.0 | 12.0 | 0.5 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Other | 0.5 | Other | 11.0 | 16 | 0 | 0 | no | — | — | Hand Pump | Ajay | 1.0 | — | — | — | — | — | — | good | In good condition | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | GRRN | 25-Feb-20 | Rehabilitation and Installation of hand pump | Animal troughs | — | — |
8400 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 16, 2022 | Hiraan | beled_weyne | Baliisdiid IDPs | 2.5 | Personal ownership | 13/11/2016 | Baliisdiid water supply | — | 4.7482983 | 45.1983442 | 156.0 | — | 4 | — | urban | yes | — | Yes | — | 7000 | — | — | — | — | — | — | — | — | — | — | — | — | — | 14.0 | 5.0 | 8.0 | 12.0 | 9.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 45.0 | PVC | 4800.0 | 1000 | 0 | 0 | no | — | — | Surface mounted Pump | Dynamos | 5.0 | — | Generator | Changfa | 12.0 | — | — | good | Ok | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | no | — | no | — | — | — | IR | 11-Nov-19 | Berket | Solar | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France