Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7699 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Private | 05/03/2007 | Galkacayo agoonta BH | — | 6.8163557 | 47.4337054 | 259.0 | — | 20 | — | urban | yes | — | Yes | — | 500 | — | — | — | — | — | 230.0 | pvc | 8.0 | — | 8.0 | 18.0 | — | 2.4 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | PVC | 600.0 | 50 | — | — | yes | 10 | 8.0 | Submersible Pump | Lowara | 18.0 | 138.0 | Hybrid - Solar/Generator | — | 70.0 | BR_M300W | 21.0 | good | — | yes | Colorless and odorless | 32.1 | 7.81 | 3340.0 | 1642.0 | — | Private/Individual | — | — | — | — | yes | 0.01 | no | — | — | — | — | — | — | 1. Extension of pipelines. 2. Extension and installation of solar power 3. Rehabilitation of generator. 4. Construction of new elevated tank. | — | — |
7749 | — | Borehole | Galmudug Ministry of Energy and Water Resources | April 11, 2022 | Mudug | galkayo | howl wadaag | 2.0 | Abdul Jamac | 09/05/2011 | Carafaat 3 | — | 6.737805 | 47.4532033 | 303.0 | — | 2 | — | rural urban | yes | — | Yes | — | 40000 | — | — | — | — | — | 240.0 | pvc | 8.0 | — | 66.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 380.0 | Galvanised Steel | 458.0 | 39000 | — | — | yes | — | — | Submersible Pump | lowara | — | 150.0 | Hybrid - Solar/Generator | EVECO | 200.0 | — | — | — | — | no | — | 30.6 | 7.65 | 4500.0 | 2230.0 | — | Private/Individual | — | — | — | — | yes | 0.002 | — | — | — | — | Agency not specified | tank | SDRO | — | — | — |
8781 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 28, 2022 | Galgaduud | cabudwaaq | 1 luulyo | 0.8 | ceel xareed | 28/03/2022 | ceel xareed | — | 6.2439039 | 46.20182 | 372.0 | — | 0 | — | urban rural | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
7755 | — | Borehole | Somaliland MoWRD | April 12, 2022 | Woqooyi Galbeed | hargeisa | Darasalam village | 0.3 | Red Crescent Society for United Arab Emirates | 09/05/2015 | Darasalam borehole | — | 9.8360338 | 44.0125261 | 1027.0 | — | 0 | — | urban | yes | — | Yes | — | 3000 | — | — | — | — | — | 80.0 | gi | 6.0 | 18.0 | 10.0 | 8.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 12.0 | Galvanised Steel | 600.0 | 430 | 0 | 1 | no | — | — | Submersible Pump | SQ flax | 10.0 | 52.0 | Solar | — | — | Axittec | 9.5 | good | The supply system of water is fair | no | — | 30.3 | 7.3 | 1060.0 | 745.0 | — | Communal | no | — | — | — | yes | 0.002 | no | — | — | — | — | 09/10/2021 | New tank construction | No intervention required | — | — |
7730 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Private | 05/03/2016 | Galkacayo daryeel BH 2 | — | 6.8166163 | 47.4382128 | 262.0 | — | 20 | — | urban | yes | — | Yes | — | 10000 | — | — | — | — | — | 230.0 | pvc | 8.0 | — | 13.3 | 18.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 160.0 | PVC | 10000.0 | 700 | — | — | no | — | — | Submersible Pump | Lowara | 22.0 | 156.0 | Hybrid - Solar/Generator | — | 160.0 | SS360_72 | 32.76 | good | — | yes | Colorless and odorless | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.01 | no | — | — | — | — | — | — | 1. Extension of pipelines | — | — |
8455 | — | Borehole | FGS Ministry of Energy and Water Resources | March 19, 2022 | Gedo | luuq | Bila musley | 3.0 | NCA | 09/04/2019 | River | — | 3.8032333 | 42.554455 | 148.0 | — | 2 | — | urban | yes | — | Yes | — | 500 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 500 | 5 | 0 | no | — | — | Hand Pump | — | — | — | — | — | — | — | — | — | — | yes | Red | — | — | — | — | — | Communal | yes | 16-Mar-20 | 4 | 5 | no | — | no | — | — | — | UNICEF | 18-Jan-20 | — | Rehabilitation | — | — |
7731 | — | Borehole | Somaliland MoWRD | May 7, 2022 | Awdal | zeylac | Xariirad | 0.5 | Save the chldren | 05/03/2016 | Xariirad Bh | — | 10.3159912 | 42.829348 | 979.0 | — | — | — | urban | yes | — | Yes | — | 17500 | — | — | — | — | — | 186.0 | gi | 8.0 | 45.0 | 7.0 | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 55.0 | PVC | 150.0 | 700 | 0 | 0 | no | — | — | Submersible Pump | Granfoc | 7.0 | — | Hybrid - Solar/Generator | Perkin | 20.0 | Axetic | 19.0 | fair | 700 household are well conmected | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.01 | no | — | — | — | Save the children international | — | Pump replacement | Reservoir, pipeline extension, solar system extension. | — | — |
7750 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 25, 2022 | Galgaduud | dhusa_marreb | Marergur | 0.2 | — | — | Ceel ciid | — | 5.7569451 | 46.5116029 | 231.0 | — | 1 | — | urban rural | yes | — | Yes | — | 1800 | — | — | — | — | — | 120.0 | gi | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 130.0 | Galvanised Steel | 87.0 | 450 | 1 | 1 | no | — | — | Submersible Pump | Not specified | — | 75.0 | Solar | — | — | Js330 | 16.0 | fair | 1. Main water supply system are small. | no | — | 34.2 | 6.55 | 4420.0 | 2210.0 | — | Private/Individual | — | — | — | — | yes | 0.002 | no | — | — | — | — | — | — | — | — | — |
8552 | — | Borehole | FGS Ministry of Energy and Water Resources | April 25, 2022 | Bakool | xudur | Biyoole 2 | — | ADRA | — | Biyoole 2 | — | 4.229167 | 43.568182 | — | — | 2 | — | urban | no | — | Yes | — | — | — | — | — | — | — | 176.0 | — | — | 130.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 248 | — | — | — | — | — | Submersible Pump | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | Full Rehabilitation | — | — |
7890 | — | Borehole | Somaliland MoWRD | May 20, 2022 | Awdal | borama | Qaryada | — | African relief committe | 10/04/2014 | Agoomaha BH | — | 9.9388228 | 43.2015577 | 1401.0 | — | — | — | urban | yes | — | Yes | — | — | — | — | — | — | — | — | pvc | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | 31.0 | 7.7 | 2630.0 | 2310.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France