Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7290 | — | Borehole | Somaliland MoWRD | April 4, 2022 | Sool | taleex | Sarmaanyo | 1.0 | ICRC | 04/04/2015 | Sarmaanyo borehole 2 | — | 9.4810306 | 48.002289 | 893.0 | — | 2 | — | rural urban | yes | — | Yes | — | 36000 | 20000 | 30 | 15000 | 0.0 | — | 306.0 | pvc | 8.0 | 24.0 | 12.0 | 24.0 | 1.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 120.0 | Galvanised Steel | 570.0 | 6000 | 1 | 2 | yes | 20 | 8.0 | Submersible Pump | Laura | 15.0 | 248.0 | Generator | Perkins 50-3 | 50.0 | — | — | good | The pipes are old and need to replace. They are leaking and Water supply are reducing to yield more water. This SOS situation and the system may devastating if not immediately intervention is not executed. | no | — | 39.0 | 7.3 | 800.0 | 1800.0 | — | Communal | yes | 04/04/2015 | 4 | 3 | yes | 0.1 | yes | — | — | — | Somaliland MoWRD | 04/04/2018 | They delivered the only Generator we are using currently | Solar installation is needed to minimise the cost of fuel, the pipes are old and leaking this reduces amount of water produced by the Borehole. | — | — |
7205 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | bossaso | Ceeldahir | 1.5 | Kuwait Government | — | Ceeldahir borehole 2 | — | 10.6125246 | 49.0492388 | 623.0 | — | 2 | — | rural urban | yes | — | Yes | — | 900 | 150 | — | 1500 | — | — | 150.0 | pvc | 8.0 | — | 12.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 500.0 | — | 8 | — | yes | 3 | 9.0 | Submersible Pump | Lowara | — | 132.0 | Generator | Eveco | 30.0 | — | — | fair | The distribution pipe lines are disconnected. The yield of borehole is very low. | no | — | 26.3 | 7.65 | 3520.0 | 1770.0 | — | Communal | no | — | — | — | yes | 0.02 | yes | — | — | — | Community_e | 25/11/2021 | Replacement of main raising pipes and submersible pump. | Solar power installation. Replacement of main raising pipes and submersible pump. Replacement of distribution pipe line. | — | — |
7328 | — | Borehole | FGS Ministry of Energy and Water Resources | April 3, 2022 | Hiraan | jalalaqsi | Wadajir | 1.5 | Personal ownar | 03/04/2022 | Nasrulaahi | — | 3.3759483 | 45.5923275 | 94.0 | — | 1 | — | urban | yes | — | Yes | — | 3500 | — | — | — | — | — | 50.0 | pvc | 10.0 | 1.0 | 20.0 | 5.0 | 1.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1000.0 | 500 | 1 | 0 | yes | 0 | 10.0 | Submersible Pump | Lowara submersible pump | 7.5 | 90.0 | Hybrid - Solar/Generator | 50 | 100.0 | — | 25.0 | poor | Ok | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.2 | yes | — | — | — | Agency not specified | 29-Nov-12 | Salar' | Salar'pomp' Tubo' motor | — | — |
7041 | — | Borehole | FGS Ministry of Energy and Water Resources | March 17, 2022 | Hiraan | beled_weyne | Bukure | — | Community | 12/03/2007 | Bukure | — | 4.6379683 | 45.8824096 | 272.0 | — | 1 | — | rural | yes | — | Yes | — | 12000 | 300 | 500 | 8000 | 0.0 | — | 170.0 | pvc | 8.0 | 20.0 | 11.0 | 12.0 | 10.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | PVC | 300.0 | 1714 | 1 | 2 | yes | 8 | 15.0 | Submersible Pump | Comoco submersible pump | 8.0 | 85.0 | Generator | Eveka generator | 30.0 | — | — | good | Ok | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.15 | yes | — | — | — | ICRC | 16-Jan-22 | Water tanker | Solar system | — | — |
7215 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 13, 2022 | Mudug | galkayo | Horkac cagaaran | 1.3 | Community | 13/03/2017 | Horkac BH | — | 7.0533552 | 47.5178086 | 301.0 | — | 1 | — | urban rural | yes | — | Yes | — | 100 | 200 | — | 800 | 5.0 | — | 226.0 | pvc | 8.0 | — | 12.5 | 5.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 18.0 | Galvanised Steel | 500.0 | — | 1 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 135.0 | Generator | Parkins | 30.0 | — | — | fair | — | yes | Colorless and odorless | 31.5 | 7.91 | 2535.0 | 1257.0 | — | Communal | yes | 14/03/2017 | 3 | 0 | no | — | yes | — | — | — | World Bank | 13/02/2021 | 1. Construction of animal troughts 2. Construction of one koisk. 3. Rehabilitation of generator room 4. Installation of generator and pump. | 1. Installation of solar power. 2. Construction of new kiosks. 3. Construction caretaker room. | — | — |
7005 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 21, 2022 | Gedo | belet_xaawo | Malkariyey | 15.0 | NCA | 21/03/2022 | Ceel macaan | — | 3.97994 | 41.9067 | 124.0 | — | 4 | — | rural | yes | — | Yes | — | 12000 | 500 | 10000 | 15700 | 3.0 | — | — | — | — | — | — | — | — | — | 16.0 | 4.0 | 5.0 | 24.0 | 4.0 | 6.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | PVC | 0.0 | 0 | 0 | 4 | yes | 18 | 15.0 | Surface mounted Pump | Hydroelectric | 24.0 | — | Generator | India | 100.0 | — | — | poor | Poor supply system | yes | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 5 | yes | — | — | — | COOPI | 21-Mar-22 | Construction of animal trough | Rehabilitation and renovation and piping system | — | — |
7266 | — | Borehole | FGS Ministry of Energy and Water Resources | March 22, 2022 | Middle Shabelle | balcad | Jariiroow | 0.0 | Former Somali Government | 09/09/1951 | Jariiroow | — | 2.90358 | 45.37447 | — | — | — | — | rural | yes | — | No | About 3 years ago, may be for the submersible pump or GI pipes cut off down | 4870 | 480 | 650 | 900 | — | — | 91.0 | gi | 10.0 | — | — | 16.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 68.0 | 378 | 2 | 3 | no | — | — | Submersible Pump | 11.5kw | — | 76.0 | Generator | Gangfa 115 | — | — | — | poor | It's in a normal condition | no | — | — | — | — | — | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | UNICEF | 8-Sep-06 | Rehabilitation | Full rehabilitation and checking in the source | — | — |
7084 | — | Spring | Puntland Ministry of Energy Minerals and Water | Feb. 22, 2022 | Nugaal | eyl | Mareye | 3.0 | CARE Somalia | 24/02/2011 | Mereye spring | — | 8.3303933 | 50.1705172 | -46.0 | — | 1 | — | urban rural | yes | — | Yes | — | 5250 | 1000 | 50 | 10000 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 16.0 | — | — | — | — | Concrete/Masonry tank | 54.0 | Galvanised Steel | 5000.0 | 750 | 6 | 4 | yes | 5 | 30.0 | Submersible Pump | Lowara | 7.5 | 3.0 | Hybrid - Solar/Generator | COELMO | 30.0 | HSPH11KH | 11.0 | fair | Pipelines needs rehabilitation | yes | Colorless and odorless | 29.5 | 7.73 | 1875.0 | 943.0 | — | Communal | yes | 22/01/2011 | 2 | 3 | yes | 0.1 | yes | — | — | — | Action Afrika Hilfe e.V | 25/12/2021 | Construction of elevated water tank | 1.Pipelines rehabilitation water supply. 2. Rehabilitation of pump and installation new pump. 3. Reconstruction/ rehabilitation of spring well. 4. Construction of new kiosks. 6. Extension of pipelines water supply in village. | — | — |
7254 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Godad | 0.5 | Community | 02/04/2011 | Godad BH | — | 6.9540493 | 47.6228238 | 274.0 | — | 1 | — | urban rural | yes | — | Yes | — | 1050 | 500 | — | 800 | 0.0 | — | 210.0 | pvc | 8.0 | — | 20.0 | 8.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 350.0 | 100 | 2 | 2 | yes | 5 | 30.0 | Submersible Pump | Lowara | 15.0 | 130.0 | Hybrid - Solar/Generator | Parkins | 48.0 | P_max 380 | 19.0 | good | — | yes | Colorless and odorless | 29.3 | 7.58 | 951.0 | 470.0 | — | Communal | yes | 02/03/2011 | 4 | 3 | yes | 0.05 | yes | — | — | — | Save the children | 02/08/2021 | 1. Construction of kiosks 2. Solar installation. | 1. Construction of new elevated water tank 2. Rehabilitation and construction new animal thoughts 3. Rehabilitation of pipes 4. Rehabilitation of generator room. | — | — |
7210 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Bari | qardho | Kala dhac | 7.0 | IR | 26/05/2019 | Kaladhac borehole | — | 10.0486823 | 48.9363469 | 966.0 | — | 1 | — | rural urban | yes | — | Yes | — | 6000 | 500 | — | 10000 | — | — | 350.0 | pvc | 8.0 | 212.0 | 11.0 | 13.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 270.0 | — | 1 | 3 | yes | 8 | 9.0 | Submersible Pump | Lowara | — | 318.0 | Hybrid - Solar/Generator | Perkins | 60.0 | SZYL-M330-36 | 24.75 | fair | — | no | — | 27.7 | 7.28 | 4350.0 | 2150.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | Puntland MoEMW | 09/05/2021 | Replacement of main raising pipes and submersible pump. | 1: Generator. 2: Replacement of 5 solar panels. 3: Replacement of main raising pipes and submersible pump. 4: Replacement of rusted distribution pipe lines. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France