Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7916 Dug Well Puntland Ministry of Energy Minerals and Water March 7, 2022 Bari bandar_beyla Qoton 0.5 Community_ 13/05/1900 Qoton dug well 1 9.5949967 50.471645 242.0 2 rural urban yes Yes 600 1000 5000 5.0 4.0 15.0 2 yes 20 8.0 poor There is no pump and main raising pipes. No generator. No solar power system. no 27.3 8.0 2400.0 1200.0 Communal yes 5 no no Community_e 07/08/2021 Cleaning the deep of the well 1: Installation of submersible pump and raising pipes. 2: Construction of another animal troughs. 3: Construction of elevated water tank. generator.
7868 Dug Well Puntland Ministry of Energy Minerals and Water March 28, 2022 Nugaal garowe Cuun 0.0 Community 28/03/2000 Cuun dug well 8.8180342 48.8915942 468.0 1 urban yes Yes 1162 9.0 3.0 6.0 8.0 2.0 Concrete/Masonry tank 25.0 PVC 600.0 0 2 0 yes 2 8.0 Submersible Pump Lowara 4.0 8.0 Solar 5.0 fair Some rehabilitation needed yes Colorless and odorless 32.8 7.8 2920.0 1460.0 Communal no no no 1. Rehabilitation of pipelines 2. Construction of koisks 3. Extension of pipelines.
7169 Borehole Puntland Ministry of Energy Minerals and Water April 11, 2022 Sanaag ceerigaabo Ceelbuh 0.5 Former Somali Government 11/05/1980 Ceelbuh borehole A1 10.2248119 48.3117092 1082.0 5 urban rural yes No 20/ 12/ 2021 The problem is pump and main raising pipes. 6000 400 3000 194.0 gi 6.0 80.0 5.0 15.0 Concrete/Masonry tank 18.0 PVC 2 2 yes 8 8.0 Submersible Pump Grundfos 192.0 Generator Perkins 30.0 poor The borehole is not functioning. no Communal yes 26/08/2015 3 2 yes 0.15 yes DRC - Puntland 22/11/2010 1: Supplied pump, pipes, and generator 2: Construction of two water kiosks. 3: Construction of generator room. 1: Amergency replacement of main raising pipes and submersible pump 2: Generator 3: solar 4: Electric cable
7166 Borehole Puntland Ministry of Energy Minerals and Water Feb. 27, 2022 Bari qardho Qodax 1.5 Community_ 27/02/2020 Qodax borehole 9.6397862 49.8325483 560.0 1 rural urban yes No 25/12/2021 The pump doesn't work 2100 1500 5000 320.0 pvc 8.0 202.0 13.0 20.0 Other 6.0 Galvanised Steel 1000.0 4 2 yes 15 6.0 Submersible Pump Lowara 300.0 Hybrid - Solar/Generator Perkins 45.0 JCNS-M36V390W 23.4 good no Communal no no yes KAALO Relief and Development 27/04/2021 Provision of generator Construction of animal troughs Construction of Solar power installation Construction of kiosks Distribution of water into the village Construction of ground tank which gives water into the village Construction of elevated water tank Replacement of pump Replacement of main raising pipes Electric cable which connect to the generator and pump Construction of animal troughs Construction of extra solar power installation Construction of toilet and caretaker hause. Cleaning of the solar.
7161 Borehole Puntland Ministry of Energy Minerals and Water March 22, 2022 Bari iskushuban Dawacaaley 2.0 Save the children 01/01/2020 Dawacaaley borehole 10.5667937 50.0366927 387.0 1 rural urban yes No 15 March 2021 The main raising pipes are rusted and the pump stopped working. 5000 20000 40000 275.0 pvc 8.0 8.0 Concrete/Masonry tank 40.0 PVC 2200.0 40 2 2 yes 10 8.0 Submersible Pump Hybrid - Solar/Generator Perkins 45.0 BR-M300 22.8 poor 1.The pump stopped working 2.the main raising pipes need changing they were inside the borehole for more than two years and they are rusted. 3.The plastic pipes that supplies the village are broken and wasting the water. no Communal no yes 0.05 yes No intervention was carried out since the borehole started working. 1. Immediate change (Rehabilitation) of main raising pipes and the submersible pump. 2.full pipeline Rehabilitation 3. Another water tank 4. 3 more kiosks 5. 2 more troughs 6. Control valves (supply stations). 7. Storage room
7789 Dug Well Puntland Ministry of Energy Minerals and Water April 12, 2022 Sanaag ceerigaabo Gurmale 0.4 Community_ 01/01/2017 Gurmale dugwells 10.0529722 48.1033727 1007.0 2 rural yes Yes 800 600 1200 10.0 5.0 0.25 16.0 1.0 8.0 1 no No Pump fair Yield is low. No distribution pipes. No main raising pipes and submersible pump. yes Mud water 32.1 7.1 6370.0 3220.0 Communal no no ACTED 01/12/2019 Construction of head of two dugwell and One Trough. 1: Amergency construction of new borehole 2: Animal water troughs. 3: Elevated water tank. 4: Generator and solar with battery. 5: Distribution pipe lines. 6: Digging deep of dug well in order to get more yield 7: Amergency water trucking.
7772 Dug Well Puntland Ministry of Energy Minerals and Water April 3, 2022 Sool las_caanood Xudun 0.0 Community 03/04/2007 Xudun dug well 9.1538636 47.4780043 599.0 2 urban yes Yes 4500 10.0 5.0 12.0 3.0 Concrete/Masonry tank 86.0 PVC 1500.0 50 10 0 yes 20 6.0 Submersible Pump Grandfoss 1.2 3.0 Hybrid - Solar/Generator 5.0 8.0 fair yes Colorless and odorless 29.5 7.5 4500.0 3015.0 Communal yes 03/04/1989 4 3 yes 0 no DRC 03/04/2022 1. Construction of elevated water tank 1. Rehabilitation of generator 2. Extension pipelines 3. Rehabilitation of dug well.
7740 Dug Well Puntland Ministry of Energy Minerals and Water March 7, 2022 Bari bandar_beyla Qoton 0.4 Community_ 16/03/2004 Qoton dug well 2 9.594538 50.4708793 241.0 2 rural urban yes Yes 1200 4.5 3.5 1.0 3.0 Concrete/Masonry tank 5.0 Galvanised Steel 1 8 no Submersible Pump Lowara 3.0 Hybrid - Solar/Generator Diesel generator DS72310W 1.8 poor The yield of a dug well is very low. The solar power system of qoton is 6 panels only. no 31.0 8.0 2220.0 1115.0 Communal yes 20/09/2005 5 0 yes 0.005 CARE Somalia 07/08/2020 1:Supplied of diesel generator 2: Construction generator room. 3: Installation of solar power system which contain 6 panels. 4: Replacement of submersible pump. 1: Digging deep of the well in order to increase its yield. 2: Replecement of all rusted distribution pipe lines. 3: Installation of extra solar panels. 4: Construction of caretaker room.
7709 Dug Well Puntland Ministry of Energy Minerals and Water March 2, 2022 Bari bandar_beyla Dhuur 1.0 Community_ 22/08/2015 Dhuur dug well 3 9.2454713 50.6056739 93.0 4 urban yes Yes 3600 10.0 7.0 12.0 12.0 Steel tank Galvanised Steel 3 Submersible Pump Lowara Hybrid - Solar/Generator no 35.0 7.5 1950.0 990.0 Communal no yes 0.01 Community_e 22/08/2019 Extension of distribution pipe line to village 1: Extension of distribution pipe line to village 2: Construction of another water kiosks 4: Replacement of submersible pump and raising pipes. 4: Generator
7708 Dug Well Puntland Ministry of Energy Minerals and Water April 9, 2022 Sanaag laasqoray Midigale 0.5 ADESO 01/01/2003 Midigale dugwell 1 10.6839932 48.6763163 809.0 3 urban yes Yes 900 12.0 5.0 3.5 2.0 7.0 24.0 Concrete/Masonry tank 25.0 PVC 1500.0 60 1 no Submersible Pump Luwara 12.0 Solar 3.0 poor 1:Submersible pump is not functioning properly. 2:And the well needs to be expanded deeply. no 32.1 7.5 1987.0 995.0 Communal yes 0.01 no CARE-Somaliland 01/01/2017 Elevated water tank Solar Submersible pump 1:Immediate change of the submersible pump 2:PVC pipes 3:Digging the well deeply 4:Generator if possible or solar power storage of battery.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors