Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7976 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 10, 2022 | Mudug | goldogob | Bursaalax | 0.7 | Community | 10/10/2021 | Rouble BH bursaalax | — | 7.164917 | 47.2376117 | 355.0 | — | 7 | — | urban | yes | — | Yes | — | 1400 | — | — | — | — | — | 220.0 | pvc | 8.0 | — | 20.0 | 5.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 80.0 | — | — | 2 | yes | 4 | 8.0 | Submersible Pump | — | 15.0 | 185.0 | Generator | Parkins | 45.0 | — | — | poor | There is no any water supply | yes | Colorless and odorless | 32.3 | 7.8 | 1946.0 | 1303.0 | — | Communal | yes | 10/10/2021 | 4 | 0 | no | — | no | — | — | — | — | — | — | 1. Installation of solar power 2. Construction of new elevated tank 3. Water supply pipes 5. Construction of koisks and animal troughts | — | — |
1088 | BHMDGD025 | Borehole | Puntland_PSAWEN | Dec. 27, 2013 | Mudug | Galdogob | Hadoodil | — | Community | 01-06-04 | Hadoodil | — | 7.2353 | 47.4007 | 388.0 | — | — | — | Rural | Yes | — | Yes | — | 150 | 800 | — | 2500 | — | — | 215.0 | — | — | 152.0 | 8.0 | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 40.0 | — | 300.0 | — | — | — | — | — | — | Submersible Pump | Lowara 11kW | — | 185.0 | — | — | — | — | — | — | — | — | — | — | 7.5 | 7008.0 | 3059.0 | — | Public | — | — | — | — | — | 0.05 | — | 0.2 | — | — | IAS | Rehabilitated tank and installed pipes | 2011-07-02 | New Generstor and pump and pipes | — | Strategic Boreholes Survey – BHS |
1209 | BHMDGK074 | Borehole | Puntland_PWDA | Nov. 20, 2019 | Mudug | Galkacyo | Jeexdin village | — | Community | 18-04-15 | Jeexdin_Bh | — | 6.8637 | 47.5331 | 316.0 | 4.9 | 1 | 1573541760233.jpg | Rural | Yes | — | Yes | — | — | 6000 | 150 | 110000 | — | — | 210.0 | — | — | — | 9.2 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 46.0 | — | — | — | 4 | 2 | Yes | 15 | 6.0 | Submersible Pump | Lowara 11 | — | 180.0 | Generator | Perkins | 60.0 | — | — | Good | — | No | — | 27.0 | — | 3200.0 | 1600.0 | — | Communal | — | 13-07-16 | 4 | 2 | No | — | No | — | — | — | KAALO Relief and Development | Elevator tank | 2019-09-13 | Solar system Pump & GI pipes Water extension Fencing | — | Strategic Water Sources Survey – WSS_NATl |
7192 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 08/08/2021 | Goldogob BH 7 | — | 7.0300828 | 47.0049931 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 235.0 | pvc | 8.0 | 140.0 | 18.0 | — | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 400.0 | PVC | — | — | — | — | no | — | — | Submersible Pump | Grandfoss | 15.0 | 180.0 | Generator | — | — | — | — | — | — | yes | Colorless and odorless | 30.6 | 7.81 | 1635.0 | 805.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | inspection | — | — |
1075 | BHMDGD012 | Borehole | Puntland_PWDA | Nov. 2, 2019 | Mudug | Galdogob | Bursalah | 0.5 | Community | 01-12-05 | Bursalah water Co Bh1 | — | 7.1847 | 47.2331 | 397.0 | 4.9 | 3 | 1572531074681.jpg | Rural Urban | Yes | — | Yes | — | — | 1000 | — | 20000 | — | — | 221.0 | — | — | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 130.0 | PVC | 10000.0 | 1500 | 3 | 4 | No | — | — | Submersible Pump | Lowara 15kW | — | 180.0 | Hybrid - Solar/Generator | Dk82520 | 45.0 | — | 25.0 | Good | — | No | — | 28.2 | — | 2480.0 | 1249.0 | — | Private-Public-Partnership | — | — | — | — | Yes | 0.03 | No | — | — | — | UNICEF - United Nations Children's Fund | Generator and pump repair | 2019-05-28 | Repair store and Water extension | — | Strategic Water Sources Survey – WSS_NATl |
8092 | — | Borehole | Somaliland MoWRD | April 11, 2022 | Sool | las_caanood | Dhidinka | 0.0 | Private | 01/03/2007 | Dhidinka 2 | — | 8.529631 | 47.3298653 | 623.0 | — | 2 | — | rural | yes | — | Yes | — | 20 | 0 | 0 | 0 | 2.0 | — | 250.0 | pvc | 8.0 | 60.0 | 2.0 | 1.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | — | Galvanised Steel | 30.0 | 0 | 0 | 0 | no | — | — | Submersible Pump | Luwara | 15.0 | 180.0 | Generator | Perkins | 30.0 | — | — | good | The supply system disconnected | no | — | 34.0 | 7.7 | 1200.0 | 800.0 | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | ADRA | 11/04/2018 | Construction of water tank | Supply system replace and animal troughs are also needed | — | — |
1298 | BHMDHO022 | Borehole | SWALIM_GSA | April 1, 2018 | Mudug | Hobyo | Bitaale | — | ICRC - International Committee of The Red Cross | 01-01-07 | Banderkali BH | — | 6.6251 | 47.8516 | 231.0 | — | — | — | Rural | — | — | Yes | — | 18000 | 400 | — | 4000 | — | — | 255.0 | — | — | 140.0 | 14.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 104.0 | — | — | — | — | — | — | — | — | — | — | — | 180.0 | Electicity Grid | — | — | — | — | — | — | — | — | 33.9 | 7.64 | 4240.0 | 2120.0 | — | Community | — | 01-01-07 | — | 0 | — | — | — | — | — | — | IRC - International Rescue Committee | Solar system | 2017-01-01 | Improve | pump and water tank construction (BH requested) | Strategic Water Sources Survey in Galmudug, Hiran, Middle and Lower Shabelle – WSS_GMHS |
7059 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 23, 2022 | Bari | qardho | Aada | 2.0 | NRC | 23/03/2020 | Aada 1 | — | 9.4871156 | 49.0677047 | 700.0 | — | 9 | — | rural urban | yes | — | Yes | — | 3000 | 500 | — | 4000 | — | — | 230.0 | pvc | 8.0 | 120.0 | 11.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | — | 500 | 1 | 2 | yes | 10 | 9.0 | Submersible Pump | Lawara | — | 180.0 | Hybrid - Solar/Generator | Perkin | 45.0 | SZYL-M330-36 | 25.7 | good | This borehole gives water to the qardho city, so we can not determine exactly number of pipe lines This borehole and four other boreholes distribute water to the one elevated water tank which has a volume of 150 meter cubic | no | — | 28.0 | 6.7 | 1250.0 | 630.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.026 | yes | — | — | — | DRC - Puntland | 03/08/2020 | Replacement of main raising pipes and submersible pump Supplied if generator. | Replacement of main raising pipes and submersible pump Replacement of electric cable which connect generator and pump. | — | — |
7507 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Jeexdin | — | — | — | Jeexdin BH | — | 6.863615 | 47.5331415 | 287.0 | — | 1 | — | rural urban | yes | — | Yes | — | 7000 | 3000 | — | 4000 | 0.0 | — | 220.0 | pvc | 8.0 | — | 8.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 500.0 | 20 | 8 | 2 | yes | 5 | 30.0 | Submersible Pump | — | 11.0 | 180.0 | Hybrid - Solar/Generator | Parkins | 50.0 | YL320P_35b | 12.8 | fair | Needs rehabilitation of supplies | yes | Colorless and odorless | 28.8 | 7.76 | 3560.0 | 1690.0 | — | Communal | yes | 02/03/2015 | 5 | 2 | yes | 0.05 | no | — | — | — | KAALO Relief and Development | 02/03/2018 | Construction of elevated tank | 1. Rehabilitation of pump and riser pipes 2. Extension of pipelines. 3. Rehabilitation of kiosks and animal thoughts | — | — |
7932 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Ramaas | — | PWASEN | 12/03/2018 | Ramaas BH | — | 7.2135578 | 47.3402197 | 353.0 | — | 1 | — | rural urban | yes | — | Yes | — | 910 | 2000 | — | 9000 | 0.0 | — | 220.0 | pvc | 8.0 | — | 12.0 | 5.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Stainless Steel | 1200.0 | 35 | 4 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 180.0 | Generator | Parkins | 45.0 | — | — | fair | — | yes | Colorless and odorless | 29.8 | 7.51 | 2335.0 | 1157.0 | — | Communal | yes | 12/03/2018 | 2 | 2 | no | — | no | — | — | — | — | — | — | 1. Rehabilitation of pump and riser pipes 2. Installation of solar power 3. Rehabilitation of koisks 4. Construction of new elevated tank. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France