Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7734 Dug Well Somaliland MoWRD April 5, 2022 Woqooyi Galbeed berbera Laalays 5.0 COOPI 01/01/1996 Laalays borehole 10.0741311 45.1737373 654.0 0 urban yes Yes 2100 10.0 7.0 6.0 8.0 Concrete/Masonry tank 20.0 Galvanised Steel 5000.0 15 1 0 no Submersible Pump Unkown 0.0 5.0 Solar Unkown 1.25 good Laalays has very good supply system no 28.8 7.96 1199.0 7990.0 Communal no yes 0.006 no No intervention carried out Gabion to store sand, pipes replacement, animal troughs.
7740 Dug Well Puntland Ministry of Energy Minerals and Water March 7, 2022 Bari bandar_beyla Qoton 0.4 Community_ 16/03/2004 Qoton dug well 2 9.594538 50.4708793 241.0 2 rural urban yes Yes 1200 4.5 3.5 1.0 3.0 Concrete/Masonry tank 5.0 Galvanised Steel 1 8 no Submersible Pump Lowara 3.0 Hybrid - Solar/Generator Diesel generator DS72310W 1.8 poor The yield of a dug well is very low. The solar power system of qoton is 6 panels only. no 31.0 8.0 2220.0 1115.0 Communal yes 20/09/2005 5 0 yes 0.005 CARE Somalia 07/08/2020 1:Supplied of diesel generator 2: Construction generator room. 3: Installation of solar power system which contain 6 panels. 4: Replacement of submersible pump. 1: Digging deep of the well in order to increase its yield. 2: Replecement of all rusted distribution pipe lines. 3: Installation of extra solar panels. 4: Construction of caretaker room.
7741 Dug Well Somaliland MoWRD May 7, 2022 Awdal zeylac C.qadir 1.0 Community 04/10/2000 C.qadir dug well 10.5148562 42.8891548 693.0 urban yes Yes 5000 6.0 2.0 1.5 8.0 Concrete/Masonry tank Galvanised Steel 1000.0 600 2 no Submersible Pump 1.5 5.0 Solar Axitec 1.4 fair The water is connected to the reservoir, which is connected to many kiosks trough a pipeline. no 28.0 7.95 1100.0 779.0 Communal no yes 0.005 no Solar replacement
7752 Dug Well Galmudug Ministry of Energy and Water Resources March 20, 2022 Galgaduud dhusa_marreb Guricel 0.0 Community 20/03/2002 Durdur /Nation 5.3082874 45.886158 266.0 1 urban yes Yes 16200 68.0 65.0 10.0 20.0 1.0 0.6 Concrete/Masonry tank 150.0 Galvanised Steel 100.0 2000 0 0 no Submersible Pump Franglin 11.0 65.0 Generator DEUTZ 31.0 fair The source is dug well no 31.0 6.33 3500.0 1750.0 Private/Individual yes 0.002 no Agency not specified 1. Pump rehabilitation 2. Rehabilitation Community
7803 Dug Well FGS Ministry of Energy and Water Resources March 24, 2022 Bakool xudur Bullow area 1.0 Community_ 25/03/2022 Saweeda12 4.1262701 43.8898909 465.0 18 urban rural no 10 Yes 1600 800 120 600 0.0 13.0 12.0 1.0 12.0 12.5 3.0 3 no No Pump good Rehabilatation no 15.0 7.0 5000.0 500.0 Communal no no no 25-Mar-22 N/A Construction of water infrastructures
7772 Dug Well Puntland Ministry of Energy Minerals and Water April 3, 2022 Sool las_caanood Xudun 0.0 Community 03/04/2007 Xudun dug well 9.1538636 47.4780043 599.0 2 urban yes Yes 4500 10.0 5.0 12.0 3.0 Concrete/Masonry tank 86.0 PVC 1500.0 50 10 0 yes 20 6.0 Submersible Pump Grandfoss 1.2 3.0 Hybrid - Solar/Generator 5.0 8.0 fair yes Colorless and odorless 29.5 7.5 4500.0 3015.0 Communal yes 03/04/1989 4 3 yes 0 no DRC 03/04/2022 1. Construction of elevated water tank 1. Rehabilitation of generator 2. Extension pipelines 3. Rehabilitation of dug well.
7774 Dug Well FGS Ministry of Energy and Water Resources March 15, 2022 Hiraan beled_weyne Laabdheere village under hawatako beletweyne 2.0 Business mens 10/10/2006 Zamzam water supply 4.736671 45.212125 149.0 5 urban yes Yes 10500 7.0 4.0 15.0 12.0 3.0 0.0 Concrete/Masonry tank 50.0 PVC 5000.0 1500 0 0 no Surface mounted Pump Dynamos 10.0 Generator Eveka 30.0 poor Poor generator no Private-Public-Partnership yes 0 no Private business 11-Mar-21 Rehabilitation Solar
7775 Dug Well FGS Ministry of Energy and Water Resources March 15, 2022 Hiraan beled_weyne Kooshin 1.0 Community 15/03/1993 Qoofiyow water supply 4.740849 45.2038954 164.0 5 urban yes Yes 13000 20.0 10.0 12.0 24.0 5.0 1.0 Concrete/Masonry tank 50.0 PVC 5000.0 1857 0 0 no Surface mounted Pump Dynamos 10.0 Generator Changafa 12.0 good This dug well is good no Private/Individual yes 0 no Community 15-Mar-15 Rehabilitation Solar, generator water tanker
7781 Dug Well Galmudug Ministry of Energy and Water Resources March 19, 2022 Galgaduud dhusa_marreb Qoqob 1.5 Community 23/12/2007 Ali Adan 5.5688826 46.3597214 223.0 0 rural yes Yes 500 150 0 0 1.5 11.0 6.8 6.0 10.0 1.0 Concrete/Masonry tank 10.0 PVC 12.0 no Hand Pump poor 1. Not water tank 2. No water supply system 3. Not have enough yield to users no 31.0 6.71 8440.0 4220.0 Private/Individual no no Agency not specified Digging 5 meters depth Community
7807 Dug Well FGS Ministry of Energy and Water Resources April 22, 2022 Bakool ceel_barde Celbarde Agency not specified 01/01/2016 OudheerSH 4.823463 43.660929 0.0 1 no Yes 2520 11.0 8.0 2.0 fair no 7.5 4700.0 Rehabilitation - Installing hand pump and construction of the shallows mouth

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors