Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
8054 Borehole Somaliland MoWRD May 10, 2022 Togdheer burco Wisiil area Hawdka Buroa 5.0 Khaliifa foundation 20/01/2021 Cabdirashiid Cumar Borehole 9.55933718942106 45.4663747083396 1056.0 0 rural yes Yes 100 500 0 1500 80.0 120.0 pvc 8.0 105.0 25.0 4.0 PVC 100.0 50 3 2 yes 3 8.0 Submersible Pump Laware 18.5 95.0 Hybrid - Solar/Generator Perkins 45.0 Lorentz A005 15.0 good Good Condition no 30.0 7.9 1400.0 1000.0 Private/Individual no no Rehabilitation and construction of animal troughs. New water tanks Construction New generator New pump.
8213 Dam FGS Ministry of Energy and Water Resources April 25, 2022 Bakool xudur Tijeeg 18/11/1995 Duqa 4.21344 43.89741 rural no Yes 3.0 80 No Pump fair no 8.19999999999999 170.0 Communal no Full Rehabilitation
8055 Borehole Somaliland MoWRD May 11, 2022 Togdheer burco Mohamed cali 1.0 This is privately owned Borehole and was established by saleebaan kulul 02/02/2021 Saleeban kulul Borehole 3 9.53207714483142 45.4937085974962 1031.0 3 rural yes Yes 10 0 0 2000 90.0 120.0 pvc 8.0 105.0 8.0 3.0 no Submersible Pump Grundfos 8.0 105.0 Generator Perkins 15.0 good Good Condition no 34.0 8.3 1400.0 970.0 Private/Individual no no 1. Construction of elevated Water Tank 2. Installation Solar System 3. Extension of water supply
8059 Borehole Somaliland MoWRD April 6, 2022 Togdheer burco Galoolay 5.0 Kuwait Government 06/04/2020 Galoolay Borehole 9.7881763 45.2949751 1235.0 0 rural yes Yes 3000 5000 1000 20000 0.0 180.0 gi 8.0 140.0 10.0 8.0 0.0 0.0 Concrete/Masonry tank 50.0 Galvanised Steel 200.0 0 0 2 no Submersible Pump Grundfos 11.0 170.0 Solar KANEKA 16.1 good Very good of water supply system they have no 26.7 7.88 1370.0 915.0 Communal no no no There is no intervention carried out Gernator , fence , new tank and rehapilitation of reservior, caretaker room, machine room, connection to the village.
8210 Dam Somaliland MoWRD April 19, 2022 Woqooyi Galbeed hargeisa Kaabada settlement 0.1 ASAL ORG. 16/05/2019 Kaabada galbeed Dam 9.0550129 43.955035 1299.0 0 rural no 11 Yes 20000 1000 500 10000 0.0 3.0 54.0 45.0 300 0 0 no No Pump fair No supply system becouse it has no infrustracture. no 32.0 8.0 183.0 13.0 Communal no no no All infrastructure
8072 Borehole Somaliland MoWRD April 16, 2022 Sool xudun Orgiyo 0.0 We do know 01/09/2018 Orgiyo 9.0804516 47.4386751 587.0 1 rural yes Yes 12000 2000 0 15000 1.0 170.0 gi 8.0 130.0 15.0 7.0 1.0 0.5 Concrete/Masonry tank 20.0 Stainless Steel 2.0 0 1 2 yes 5 3.0 Submersible Pump Grunfoce 11.0 160.0 Hybrid - Solar/Generator Perkins 45.0 Kap72so1-325/sc 325.0 good Supply systems are good no 38.0 7.2 1300.0 960.0 Private/Individual no no Oxfam GB 16/04/2020 Fence and solar installation Generator and expantion of the fancing
8065 Borehole Somaliland MoWRD May 10, 2022 Awdal borama Holhol 5.0 Jaamac yuusuf BH 10/01/2021 Jamaac yuusuf BH 9.9209746 43.1327314 1463.0 rural yes Yes 115.0 pvc 8.0 70.0 8.0 Steel tank 6.0 PVC 700.0 0 0 no Submersible Pump Granfoc 15.0 92.0 Solar Dos 6.8 fair The supply is not connected well trogh the farm. no 30.0 8.8 1340.0 966.0 Private/Individual no no
8069 Borehole Somaliland MoWRD May 5, 2022 Awdal borama Camuud 4.0 Amoud foundation 31/05/2010 Amoud 1 9.9437285 43.2199764 1379.0 rural yes Yes 3000 81.0 gi 8.0 60.0 20.0 20.0 Concrete/Masonry tank 25.0 PVC 500.0 0 0 no Submersible Pump Granfoc 30.0 75.0 Generator Perkin 30.0 fair There is a system, which is connected to a reservoir, and many water points within the university no 30.0 6.89 1321.0 933.0 Private/Individual no no
8201 Dam FGS Ministry of Energy and Water Resources April 25, 2022 Bakool xudur Usbo Eelow 18/10/1969 Usbo eelow 4.12065 43.81932 4 rural no Yes 3.0 68 fair no 8.5 310.0 Communal no Rehabilitation
8071 Spring Somaliland MoWRD May 18, 2022 Awdal zeylac Heemaal Heemaal spring 10.5585678 43.1401388 481.0 rural yes Yes no 35.0 8.5 1318.0 931.0 Communal no no no

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors