Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7193 Borehole Puntland Ministry of Energy Minerals and Water March 15, 2022 Mudug galkayo Beer dhagaxtuur 0.7 Private 15/03/2019 Dhagaxtuur BH 7.4595648 47.4101372 409.0 1 urban rural yes Yes 4900 500 1200 0.0 340.0 pvc 8.0 11.0 12.0 3.0 Concrete/Masonry tank 20.0 PVC 1300.0 21 1 1 yes 4 8.0 Submersible Pump Lowara 16.5 250.0 Hybrid - Solar/Generator Parkins 45.0 BR_M330W 23.1 fair Poor of koisks and animal troughts yes Colorless and odorless 28.6 7.72 1545.0 765.0 Communal yes 15/03/2019 7 0 yes 0.05 yes NRC 15/03/2021 1. Construction of new elevated tank 2. Construction of koisk. 3. Construction generator room. 1. Construction of animal troughts 2. Construction of koisks 3. Extension pipelines.
7497 Borehole Puntland Ministry of Energy Minerals and Water March 27, 2022 Nugaal garowe Garowe 1.5 UNICEF 27/03/2019 Jilab BH 2 8.3808506 48.5211993 453.0 2 urban yes Yes 2100 360.0 pvc 8.0 50.0 9.6 8.0 270.0 5.0 Concrete/Masonry tank 50.0 PVC 1300.0 105 10 0 no Submersible Pump Lowara 15.0 300.0 Solar SZYL-P325-36 23.4 good yes Colorless and odorless 31.5 10550.0 5025.0 Private-Public-Partnership yes 0.05 no NUWACO Water Company 27/03/2019 1. Installation of solar power.
1057 BHLSWA006 Borehole FGS_MoEWR Oct. 16, 2019 Lower Shabelle Wanla Weyn Tawakal 0.5 Qatar charity 15-08-17 Tawakal BH 2.607 44.8971 92.0 4.3 0 1571201348800.jpg Rural Urban Yes Yes 120 300 800 0.0 153.0 PVC 8.0 52.0 12.0 10.0 Concrete/Masonry tank 24.0 PVC 1300.0 380 1 2 No Submersible Pump Caprari 60.0 90.0 Generator Dos 30.0 Fair No 26.1 7.44 1470.0 740.0 Private/Individual Yes 0.029 Yes Solar system, Motor, large tank, Animal troughs , pump with pipes and water supply system Strategic Water Sources Survey – WSS_NATl
8399 Dug Well FGS Ministry of Energy and Water Resources March 30, 2022 Hiraan bulo_barde Buulobari 1.0 Community 19/03/1997 Shii balcad 3.8566941 45.5695486 105.0 3 urban no 7 No Effected the floods in 2019 4000 25.0 10.0 10.0 12.0 5.0 1.0 Concrete/Masonry tank 30.0 PVC 1250.0 571 2 2 no Hand Pump Dynamos 8.0 good Affect by the floods no Private/Individual no no Community 30-Mar-17 Rehabilitation Rehabilitation elevator water tanker
1900 BHTGBC133 Borehole Somaliland_MoWR Jan. 5, 2014 Togdheer Burco Aden Suleiman Dr. Ahmed H.Hasan 01-10-10 Dr. Ahmed H. Hasan 9.5198 45.5879 1019.0 Rural Yes Yes 4.0 162.0 82.0 16.0 6.0 10.0 1222.0 Submersible Pump Lowara 11kW 7.3 9360.0 6270.0 Private Dr.Ahmed (Owner) Pump Replacement 2012-11-01 Strategic Boreholes Survey – BHS
7728 Dug Well FGS Ministry of Energy and Water Resources March 30, 2022 Lower Shabelle afgooye Waanjeele 3.0 Private 13/01/1998 AL NAJAX WATER SUPPLY 2.1514949 45.1228462 41.0 5 rural yes Yes 3500 0 0 0 1.0 20.0 6.0 10.0 19.0 2.0 1.0 Concrete/Masonry tank 36.0 PVC 1200.0 700 3 0 yes 2 10.0 Submersible Pump 4.5 KW 10.0 2.0 Generator Gancava China 125 25.0 poor In January, February, March and first 15 days of April there is a gab for our supply system yes Good 0.0 Communal yes 19-Nov-10 4 2 yes 0.01 no Zam zam foundation 18-Mar-08 Provision of new dug well, distribution of Chlorine Provision of two borehole , rehabilitation of reservior, provide of solar system, distribution of pipeline, provide pump and sumersible. Distribution of chlorine while january, february, march and april
125 BHAWZE012 Borehole Somaliland_MoWRD Dec. 14, 2019 Awdal Zeylac Ceelgal Former Somali Government 15-12-78 Ceelgaal2 10.9757 43.4383 88.0 4.9 1576301519838.jpg Rural Urban Yes Yes 12000 3000 20000 95.0 PVC 6.0 30.0 18.0 12.0 4.0 1.0 Concrete/Masonry tank 25.0 PVC 1200.0 1 4 3 Yes 7 8.0 Hand Pump Good No 29.0 7.7 4400.0 2200.0 Utility/Local Authority Yes 0.005 No New storage 2019-05-15 2 koiks and animal troughs Strategic Water Sources Survey – WSS_NATl
7279 Borehole Somaliland MoWRD March 31, 2022 Awdal lughaye Garaaca 7.0 Kuwait Government 28/07/2020 Garaaca jaleelaale Borehole 10.60117 43.82159 0 rural urban yes Yes 1400 2000 0 4000 0.0 92.0 gi 8.0 40.0 4.0 10.0 0.0 0.0 Concrete/Masonry tank 40.0 PVC 1200.0 200 1 2 no Submersible Pump Unkown 0.0 0.0 Solar DS572380M 4.18 fair Very good water supply system no 31.1 7.95 3830.0 2700.0 Communal no yes 0.006 yes No intervention Funce replacement, pipe replacememt, machine with caretaker room, new tank.
1136 BHMDGK024 Borehole Puntland_PSAWEN Jan. 4, 2014 Mudug Galkacyo Halabooqad WDA 01-06-73 Halabooqad 6.8543 47.4135 302.0 Urban Yes Yes 2300 500 40 1000 0.25 180.0 90.0 12.0 8.0 80.0 1200.0 Submersible Pump Lowara 11kW 150.0 7.8 7003.0 3052.0 Public 0.05 0.2 CARE Somalia Water Tank and Generator Room 2012-07-04 New Generator 40Kva and Pipeline 800m Strategic Boreholes Survey – BHS
7643 Spring Puntland Ministry of Energy Minerals and Water March 6, 2022 Bari bandar_beyla Caris 1.0 Shilcon 27/12/2005 Haashire spring 9.5872416 50.8004885 -32.0 1 rural urban yes Yes 720 100 7.0 Concrete/Masonry tank 6.0 PVC 1200.0 3 1 no Submersible Pump Lowara Hybrid - Solar/Generator KAMA fair The power of generator and solar is very low. The yield is very low. no 29.5 7.64 1700.0 895.0 Communal yes 14/09/2021 3 2 yes 0.025 no CARE Somalia 30/12/2021 1: Installation of 5 solar panels with all accessories. 2: Rehabilitation of caretaker room. 3: Installation of submersible pump. 4: Construction of RC concrete slab which protect the mouth of spring. 5: Construction of 3 kiosks and one animal troughs. 1: Diging the deep of the spring in order to increase its yield. 2: Generator and installation of extra solar panels with all accessories. 3: Fuel which acess generator.

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors