Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | BHAWBA002 | Borehole | Somaliland_MoWRD | Nov. 28, 2019 | Awdal | Baki | Waraabe dareeri | 2.0 | Kuwait Government | 28-04-19 | Waraabe dareeri bore hole | — | 10.2745 | 43.6708 | 432.0 | 4.9 | 1 | 1574916690321.jpg | Rural Urban | Yes | — | Yes | — | — | 200 | 0 | 4000 | 0.0 | — | 48.0 | PVC | 6.0 | 18.0 | 8.0 | 8.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 60.0 | Stainless Steel | 3.0 | 0 | 1 | 1 | No | — | — | Submersible Pump | Lowara 11kW | 9.0 | 45.0 | Solar | — | — | Banal 6 | 280.0 | Good | The condition of supply is good | Yes | — | 27.0 | 7.45 | 1860.0 | 930.0 | — | Communal | — | 21-07-18 | 5 | 2 | Yes | 0.5 | No | — | — | — | — | — | — | Guard houses piplene disturbution | — | Strategic Water Sources Survey – WSS_NATl |
67 | BHAWBO057 | Borehole | Somaliland_MoWRD | Nov. 30, 2019 | Awdal | Borama | Amoud | 2.5 | Private | 30-07-17 | Mixile BH | — | 9.9527 | 43.2328 | 1383.0 | 4.3 | — | 1575116007571.jpg | Rural | Yes | — | Yes | — | — | 30 | 50 | 200 | 70.0 | — | 140.0 | GI | 8.0 | 60.0 | 15.0 | 4.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 100.0 | 0 | 4 | 2 | No | — | — | Submersible Pump | Lowara | 11.0 | 102.0 | Solar | — | — | Photovoltaic | 10.71 | Good | — | No | — | 21.0 | 7.82 | 1023.0 | 725.0 | — | Private/Individual | — | — | — | — | No | — | No | — | — | — | ICRC - International Committee of The Red Cross | — | — | It needs generator Increasing number of solar | — | Strategic Water Sources Survey – WSS_NATl |
70 | BHAWBO060 | Borehole | Somaliland_MoWRD | Dec. 6, 2019 | Awdal | Borama | Weeraar | 5.0 | Community | 25-05-12 | Weeraar | — | 10.2513 | 43.2347 | 1237.0 | 3.2 | 0 | 1575642532068.jpg | Rural | Yes | — | Yes | — | — | 20 | 0 | 100 | — | — | 90.0 | PVC | 8.0 | 60.0 | 2.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 26.0 | Galvanised Steel | 30.0 | 0 | 0 | 0 | No | — | — | Submersible Pump | Grundfos | 11.0 | 60.0 | Solar | — | — | Photovoltaic | 1.5 | Good | — | No | — | 18.0 | 7.75 | 750.0 | 534.0 | — | Private/Individual | — | — | — | — | No | — | No | — | — | — | — | — | — | When the completed all the systems of this borehole conflicted between community and owner garden,so the community is not used at this borehole. | — | Strategic Water Sources Survey – WSS_NATl |
7498 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | NUWACO Water Company | 27/03/2017 | Jillab BH 1 | — | 8.3921872 | 48.5132857 | 446.0 | — | 10 | — | urban | yes | — | Yes | — | 2100 | — | — | — | — | — | 350.0 | pvc | 8.0 | 120.0 | 8.0 | 8.0 | — | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 2000.0 | 105 | 11 | — | no | — | — | Submersible Pump | Lowara | 15.0 | 216.0 | Solar | — | — | RP300M-72 | 27.0 | good | — | yes | Colorless and odorless | 30.3 | 7.28 | 5730.0 | 2860.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | NUWACO Water Company | 27/03/2017 | 1. Installation of solar power | — | — | — |
7031 | — | Dug Well | FGS Ministry of Energy and Water Resources | June 9, 2022 | Lower Juba | afmadow | Danwadaag | 1.0 | IOM | 16/06/2017 | Cilaanle | — | 0.520236 | 42.076297 | -10.0 | — | 3 | — | rural urban | yes | — | Yes | — | 25000 | 300 | 4500 | 3000 | 0.0 | — | — | — | — | — | — | — | — | — | 25.0 | 3.0 | 0.4 | 12.0 | 3.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 4.0 | PVC | 12.0 | 50 | 1 | 2 | yes | 7 | 0.04 | Surface mounted Pump | N/A | — | — | Solar | — | — | — | 0.3 | poor | there is a very poor solar energy supply also affecting the amount of water pumped. | yes | bad smell and not clear water | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.02 | yes | — | — | — | IOM | 10-Jun-17 | ronavation | the pump is too small and poor in condition, ronavation,digging and good piping systems | — | — |
7199 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 3, 2022 | Sanaag | laasqoray | Laasqoray | 1.0 | Somaliland MoWRD | 03/04/2018 | Laasqoray borehole | — | 11.1799066 | 48.2423582 | -3.0 | — | 3 | — | rural | yes | — | Yes | — | 600 | 300 | — | 1200 | 0.5 | — | 22.0 | pvc | 8.0 | 21.0 | 5.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | 50.0 | — | 1 | 2 | yes | 3 | 6.0 | Submersible Pump | Lowara | — | — | Solar | — | — | — | — | poor | Distribution pipes are rusted. | no | — | 34.6 | 8.1 | 2810.0 | 1400.0 | — | Communal | no | — | — | — | yes | 0.03 | yes | — | — | — | Community_e | 09/09/2020 | Construction of animal water troughs | 1: Pipes 2: Tools such as pipe accessories. 3: Construction of new borehole that has a less salinity | — | — |
7497 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | 1.5 | UNICEF | 27/03/2019 | Jilab BH 2 | — | 8.3808506 | 48.5211993 | 453.0 | — | 2 | — | urban | yes | — | Yes | — | 2100 | — | — | — | — | — | 360.0 | pvc | 8.0 | 50.0 | 9.6 | 8.0 | 270.0 | 5.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1300.0 | 105 | 10 | 0 | no | — | — | Submersible Pump | Lowara | 15.0 | 300.0 | Solar | — | — | SZYL-P325-36 | 23.4 | good | — | yes | Colorless and odorless | 31.5 | — | 10550.0 | 5025.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | NUWACO Water Company | 27/03/2019 | 1. Installation of solar power. | — | — | — |
20 | BHAWBO013 | Borehole | Somaliland_MoWRD | Dec. 6, 2019 | Awdal | Borama | Abasa | 2.0 | — | 12-01-18 | Abasa BH1 | — | 10.1724 | 43.1472 | 1208.0 | 4.3 | — | 1575629153248.jpg | Rural | Yes | — | Yes | — | — | 100 | 200 | 500 | 50.0 | — | 84.0 | GI | 8.0 | 30.0 | 12.0 | 4.0 | — | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 1000.0 | — | 2 | 2 | No | — | — | Submersible Pump | Grundfos | 7.5 | 64.0 | Solar | — | — | Photovoltaic | 1.475 | Good | — | No | — | 20.0 | 7.56 | 645.0 | 465.0 | — | Communal | — | — | — | — | Yes | 0.2 | Yes | — | — | — | — | — | — | Rehibilitation animal troughs and water points Increasing number of solar system | — | Strategic Water Sources Survey – WSS_NATl |
7505 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | NUWACO Water Company | 27/03/2015 | Khayrseexay BH | — | 8.4295834 | 48.5124291 | 418.0 | — | 10 | — | urban | yes | — | Yes | — | 9100 | — | — | — | — | — | 300.0 | pvc | 8.0 | — | 8.0 | 10.0 | — | 4.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | PVC | 3000.0 | 1300 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 15.0 | 150.0 | Solar | — | — | YL265P-26l | 28.62 | good | — | yes | Colorless and odorless | 29.2 | 7.51 | 3820.0 | 1905.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | NUWACO Water Company | 27/03/2019 | 1. Installation of solar power. | — | — | — |
7014 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 24, 2022 | Bakool | xudur | Bullow | 1.0 | IOM | 24/03/2022 | Eel liifow | — | 4.1239897 | 43.8929898 | 463.0 | — | — | — | rural urban | no | 9 | No | Due to shortage of rainy season the water level went down | 2900 | 280 | 120 | 350 | 0.0 | — | — | — | — | — | — | — | — | — | 13.0 | 6.0 | 4.0 | 6.0 | 6.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | Stainless Steel | 10.0 | 25 | 2 | 2 | no | — | — | Submersible Pump | Florence | 1.5 | 12.0 | Solar | — | — | — | 17280.0 | good | No bad condition there during distribution time | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.2 | yes | — | — | — | IOM | 24-Mar-22 | Constructed of 25 miter cubic water tank installation of solar system and submersible pupm fiencing for protection | Back up generator and spare partes/ fuel | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France