Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7156 Borehole Somaliland MoWRD March 31, 2022 Togdheer buuhoodle Qabri Hulul 0.2 IR 01/01/2016 Qabri Hull borehole 8.685275 46.2782063 832.0 1 rural yes Yes 2400 400 0 2800 0.0 333.0 pvc 8.0 270.0 15.0 2.0 Concrete/Masonry tank 40.0 Galvanised Steel 25.0 400 1 8 yes 4 8.0 Submersible Pump Luara 15.0 300.0 Hybrid - Solar/Generator JP45 45.0 GPM300 300.0 good The condition of the solar system and has spare parts no 36.0 7.3 1000.0 394.0 Communal no no yes IR 01/02/2016 Construction of new borehole Rehabilitation of reservoirs and animal trough installation
7157 Borehole Puntland Ministry of Energy Minerals and Water April 11, 2022 Sanaag ceerigaabo Ceelbuh 4.0 Community_ 23/07/2021 Qablan borehole 10.2417282 48.3252435 1079.0 5 urban rural yes Yes 4800 600 7000 285.0 pvc 8.0 240.0 14.0 17.0 Concrete/Masonry tank 16.0 Galvanised Steel 2 yes 15 10.0 Submersible Pump Lowara 264.0 Generator Perkins 45.0 fair No sufficient water storage. No water kiosks. no 32.6 7.3 2230.0 1118.0 Communal yes 19/08/2021 3 2 yes 0.3 yes UNICEF 11/04/2022 Construction of elevated water tank Construction of two rooms. Construction of 1 water kiosks 1: Solar power system with battery. 2: Pump and pipe lines 3: Generator. 4: Fencing. 5: Construction of another elevated water tank due capacity of borehole. 6: Construction of animal water troughs.
7158 Borehole Puntland Ministry of Energy Minerals and Water Feb. 20, 2022 Bari qardho Ceelbuh 1.0 20/10/2015 Ceelbuh borehole 9.0910365 49.593264 466.0 1 rural urban yes Yes 24000 7000 70000 225.0 pvc 8.0 60.0 12.0 9.0 Concrete/Masonry tank 36.0 Galvanised Steel 600.0 6000 10 2 yes 6 45.0 Submersible Pump Lawara 162.0 Hybrid - Solar/Generator Coelmo 33.0 300-72M 22.5 good The borehole is Good supply system Elevated water tank is good Water kiosks are good. no 33.0 6.0 4200.0 2280.0 Communal no yes 0.1 yes Community 17/02/2022 Replacement of generator Replacement of electric cable which acess to the generator. Rehabilitation of solar panels and solar accessories equipment Rehabilitation of elevated water tank Construction of extra water trough Needs of fuel which acess to the generator.
7167 Spring Puntland Ministry of Energy Minerals and Water March 1, 2022 Bari bandar_beyla Qundheed 3.0 Other Qundheed spring 8.9007643 50.4397341 6.0 1 rural urban yes Yes 3000 2500 5000 10.0 Concrete/Masonry tank 20.0 Galvanised Steel 3000.0 2 2 yes 4 8.0 Submersible Pump Lawara Generator Perkins 30.0 no Communal yes 01/01/2007 5 2 no yes IRC 03/02/2021 Replacement of distribution pipe lines Provision of generator Provision of electric cable which access generator Installation of solar power system Replacement the Roof of the caretaker and generator rooms Construction of extra kiosks
7168 Spring Puntland Ministry of Energy Minerals and Water March 2, 2022 Bari bandar_beyla Ceel dhidar 1.0 Ceel dhidar spring 9.2725433 50.704176 35.0 1 rural urban yes Yes 1200 1000 15000 6.0 Concrete/Masonry tank 40.0 Galvanised Steel 1000.0 2 3 yes 10 10.0 Submersible Pump Lawara Generator Perkins 33.0 no 34.5 7.1 3050.0 1500.0 Communal no yes 0.15 yes IR 02/01/2021 Construction of elevated water tank fencing Replacement of pump. Replacement of all distribution pipes. Installation of solar power system.
7187 Borehole Puntland Ministry of Energy Minerals and Water March 9, 2022 Mudug goldogob Dhamuuke Community 09/03/2019 Dhamuuke BH 7.2394967 47.1243666 384.0 2 rural urban yes Yes 420 130 250 180.0 pvc 8.0 10.7 6.0 3.0 Concrete/Masonry tank 32.0 PVC 1200.0 30 1 1 yes 1 8.0 Submersible Pump Lowara 11.0 120.0 Hybrid - Solar/Generator Parkins 30.0 JCNS-M36V360W 20.16 good yes Colorless and odorless 33.5 7.68 2220.0 1103.0 Communal no yes 0.05 yes NRC 09/05/2020 1. Construction of operator 1. Construction of animal throughts 2. Installation of generator 3. Rehabilitation of generator
7233 Dam Somaliland MoWRD April 21, 2022 Woqooyi Galbeed gebiley Allaybaday 1.0 Privately established Ina Qase Dam 9.3977567 43.4905366 1443.0 0 rural urban yes Yes 2000 200 2500 5000 0.0 4.0 350 0 0 yes 10 9.0 It has no system becouse this Dam has no any infrustructure. yes Brown color 28.0 8.4 360.0 254.0 Private/Individual yes 1.2 yes
7713 Borehole FGS Ministry of Energy and Water Resources April 26, 2022 Lower Shabelle afgooye Lafoole Former Somali Government 21/12/1976 Daaqa Qaranka 2.1071 45.15162 rural yes Yes 12000 160.0 111.0 15.0 10.0 Concrete/Masonry tank 40.0 2000 Submersible Pump Elect Submersible pump 140.0 good no 7.3 1766.0 896.0 Communal no yes 0.01
7159 Borehole Puntland Ministry of Energy Minerals and Water April 11, 2022 Sanaag ceerigaabo Ceelbuh 3.0 Horn relief 17/08/1996 Ceelbuh borehole 2 10.2362327 48.3108071 1087.0 5 urban rural yes Yes 900 800 2000 252.0 gi 8.0 226.0 12.0 17.0 Concrete/Masonry tank 47.0 Galvanised Steel 1 4 yes 5 9.0 Submersible Pump 241.0 Hybrid - Solar/Generator Perkins 50.0 GPS-300-360 17.28 no 32.6 7.3 2230.0 1118.0 Communal yes 25/09/2006 3 2 yes 0.05 yes ACTED 26/09/2020 Borehole equipment and installation work. Construction of elevated water tank. Construction of generator house. Construction of two animal water troughs. Solar. Construction of water kiosks. Rehabilitation of two animal water troughs. 1: Amergency replacement of main raising pipes and submersible pump 2: Replacement of electric cable. 3: Replacement of rusted distribution pipes. 4: Generator 5: Solar power storage ( battery)
7372 Dam FGS Ministry of Energy and Water Resources April 19, 2022 Bakool tayeeglow Gofotayta 4.0 Community 12/07/1946 Busley 4.018506 44.428484 3 rural yes Yes 2 1 2 3 1.0 10.0 2.0 Other 1.0 PVC 2.0 500 1 no Submersible Pump 2.0 Electricity Grid poor no Communal yes 4 2 yes 2 no Expanding and fencing

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors