Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7202 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 12, 2022 | Sanaag | ceerigaabo | Xingalool | 0.9 | IR | 09/06/2003 | Xingalool borehole 2 | — | 9.755695 | 48.3143046 | 885.0 | — | 3 | — | rural urban | yes | — | Yes | — | 3000 | 500 | — | 3000 | — | — | 120.0 | pvc | 8.0 | 66.0 | 3.0 | 17.0 | — | 0.5 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | — | — | — | 3 | yes | 10 | 8.0 | — | — | — | — | — | — | — | — | — | fair | The yield is low Distribution pipes are rusted. | no | — | 32.2 | 7.1 | 3720.0 | 1873.0 | — | Communal | yes | 16/08/2004 | 3 | 2 | yes | 0.025 | yes | — | — | — | CARE Somalia | 13/06/2020 | Generator Construction of generator room | 1: Amergency replacement of main raising pipes and submersible pump. 2: Generator 3: Rehabilitation of animal water troughs 4: Construction of another elevated water tank. 5: Fencing 6: training borehole workers 7: Construction of another borehole due to water demand 8: Solar power storage ( battery) | — | — |
7204 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | qardho | Carmo | 3.0 | Horseed water company | 12/07/2019 | Carmo borehole 3 | — | 10.5711623 | 49.0842369 | 644.0 | — | 5 | — | rural urban | yes | — | Yes | — | 1800 | 100 | — | 700 | — | — | 240.0 | pvc | 8.0 | 180.0 | 10.0 | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 426.0 | PVC | — | 300 | — | — | no | — | — | Submersible Pump | Lowara | — | 234.0 | Generator | Perkins | 45.0 | — | — | good | But the water is over salt. The borehole distribute water to the village so it is difficult to determine length of pipe line. | yes | Yellow color. Water is over salt. | 26.7 | 7.28 | 4050.0 | 2020.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.02 | yes | — | — | — | Horseed water company | 16/07/2020 | Cleaning of the borehole site. | Installation of solar power system. Fencing. | — | — |
7205 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | bossaso | Ceeldahir | 1.5 | Kuwait Government | — | Ceeldahir borehole 2 | — | 10.6125246 | 49.0492388 | 623.0 | — | 2 | — | rural urban | yes | — | Yes | — | 900 | 150 | — | 1500 | — | — | 150.0 | pvc | 8.0 | — | 12.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | PVC | 500.0 | — | 8 | — | yes | 3 | 9.0 | Submersible Pump | Lowara | — | 132.0 | Generator | Eveco | 30.0 | — | — | fair | The distribution pipe lines are disconnected. The yield of borehole is very low. | no | — | 26.3 | 7.65 | 3520.0 | 1770.0 | — | Communal | no | — | — | — | yes | 0.02 | yes | — | — | — | Community_e | 25/11/2021 | Replacement of main raising pipes and submersible pump. | Solar power installation. Replacement of main raising pipes and submersible pump. Replacement of distribution pipe line. | — | — |
7207 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 12, 2022 | Sanaag | ceerigaabo | Beraagaha qol | 0.5 | Former Somali Government | 30/09/1986 | Baragahaqol borehole | — | 9.5593133 | 48.4902861 | 895.0 | — | 1 | — | rural urban | yes | — | Yes | — | 9000 | 1000 | — | 4000 | — | — | 150.0 | gi | 8.0 | 50.0 | 22.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | — | 1 | 2 | 5 | yes | 20 | 10.0 | Submersible Pump | Grundfos | — | 90.0 | Generator | Perkins 40KVA Perkins | 50.0 | — | — | good | The village has no water supply system and water kiosks. | no | — | 32.7 | 7.2 | 3710.0 | 1858.0 | — | Communal | no | — | — | — | yes | 0.01 | yes | — | — | — | World Vision | 22/09/2021 | Extension of distribution pipe line in to the school Construction of one water kiosks. | 1: Solar power system. 2: Construction of another elevated water tank. 3: Construction of generator room 4: Amergency replacement of main raising pipes and submersible pump. 5: Construction of new borehole | — | — |
7209 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 27, 2022 | Bari | qardho | Maygaag | 2.0 | Community_ | 27/06/2015 | Maygaag borehole | — | 9.5248817 | 49.9265509 | 473.0 | — | 1 | — | rural urban | yes | — | Yes | — | 6000 | 3000 | — | 8500 | — | — | 240.0 | pvc | 8.0 | — | 10.0 | 15.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 76.0 | Galvanised Steel | 2500.0 | — | 7 | 3 | yes | 8 | 9.0 | Submersible Pump | Lowara | — | 204.0 | Hybrid - Solar/Generator | Perkins | 30.0 | JCNS-M36V390W | 19.8 | good | The village has water supply system and 7 kiosks which provide the water to the village. | no | — | 31.7 | 7.1 | 5300.0 | 2600.0 | — | Communal | yes | 02/08/2015 | 5 | 2 | no | — | yes | — | — | — | Community | 07/01/2021 | Construction of Solar power system Placement of water supply distribution pipe lines | Water purification because the maygag borehole is over salt. Construction of another elevated water tank. Division of pipes lines which acess the animal troughs Replacement of pipes which acess water kiosks in the village. Construction of another water kiosks. Construction of toilet and caretaker room. Water purification. | — | — |
7210 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Bari | qardho | Kala dhac | 7.0 | IR | 26/05/2019 | Kaladhac borehole | — | 10.0486823 | 48.9363469 | 966.0 | — | 1 | — | rural urban | yes | — | Yes | — | 6000 | 500 | — | 10000 | — | — | 350.0 | pvc | 8.0 | 212.0 | 11.0 | 13.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | Galvanised Steel | 270.0 | — | 1 | 3 | yes | 8 | 9.0 | Submersible Pump | Lowara | — | 318.0 | Hybrid - Solar/Generator | Perkins | 60.0 | SZYL-M330-36 | 24.75 | fair | — | no | — | 27.7 | 7.28 | 4350.0 | 2150.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | Puntland MoEMW | 09/05/2021 | Replacement of main raising pipes and submersible pump. | 1: Generator. 2: Replacement of 5 solar panels. 3: Replacement of main raising pipes and submersible pump. 4: Replacement of rusted distribution pipe lines. | — | — |
8555 | — | Dam | FGS Ministry of Energy and Water Resources | April 24, 2022 | Bakool | waajid | Tuullo Siraad | — | Community_ | 23/01/1925 | Tuulo Siraad | — | 3.804705 | 43.221231 | — | — | 4 | — | rural | yes | — | Yes | — | 1333 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 190 | — | — | — | — | — | No Pump | — | — | — | — | — | — | — | — | good | — | no | — | — | — | — | — | — | Communal | — | — | — | — | — | — | — | — | — | — | — | — | — | Rehabilitation | — | — |
8753 | — | Borehole | FGS Ministry of Energy and Water Resources | April 25, 2022 | Bakool | xudur | Wasiile | — | Community_ | — | Wasiile | — | 3.97917 | 44.25001 | — | — | — | — | rural | yes | — | Yes | — | — | — | — | — | — | — | 78.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | fair | — | no | — | — | — | — | — | — | Communal | no | — | — | — | — | — | — | — | — | — | — | — | — | Quick Rehabilitation | — | — |
7226 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Bari | bandar_beyla | Durdura | 0.5 | Other | — | Durdura spring | — | 9.0311603 | 50.5865239 | -20.0 | — | 1 | — | rural urban | yes | — | Yes | — | 1200 | 300 | — | 6000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 13.0 | — | — | — | — | Concrete/Masonry tank | 13.0 | PVC | 550.0 | 3 | 5 | 2 | yes | 8 | 8.0 | Submersible Pump | Lawara | — | — | Generator | Iveco&perkins | 36.0 | — | — | good | — | no | — | 31.0 | 6.95 | 3400.0 | 1600.0 | — | Communal | yes | 02/06/2004 | 4 | 3 | yes | 0.05 | yes | — | — | — | Puntland MoEMW | 02/06/2017 | Construction of kiosk | Installation of solar power installation. Rehabilation of elevated water tank in order to stop water leaking. Supply of extra pump as a safety. | — | — |
7211 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 9, 2022 | Bari | qardho | Waciye | 3.0 | Puntland MoEMW | 14/08/2006 | Waciye borehole | — | 10.0226469 | 49.0389998 | 883.0 | — | 1 | — | rural urban | yes | — | Yes | — | 3000 | 1000 | — | 10000 | — | — | 380.0 | pvc | 8.0 | — | 8.0 | 10.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 96.0 | Galvanised Steel | — | 300 | 1 | 2 | no | — | — | Submersible Pump | Lowara | — | 294.0 | Hybrid - Solar/Generator | Perkins | 45.0 | — | — | good | The borehole distributes water on two elevated water tank. One elevated water distributes water to the kiosks and animal troughs. And onother elevated water tank distribute water to waciye city. The city contains around 300 House holds. | no | — | 27.7 | 7.31 | 4150.0 | 2070.0 | — | Communal | no | — | — | — | no | — | yes | — | — | — | IOM | 13/08/2018 | Installation of solar power system. Replacement of main raising pipes and submersible pump. | Replacement of all rusted distribution iron pipes. Replacement of main raising pipes and submersible pump. Generator. Construction of one kiosks. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France