Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8264 | — | Borehole | Somaliland MoWRD | April 18, 2022 | Sanaag | ceerigaabo | Cerigabo | 2.0 | Somali government | 18/04/1972 | Cerigabo WD2 | — | 10.6303465 | 47.3624228 | 1778.0 | — | 2 | — | — | no | 0 | Abandoned | 1. Exhusted wells | 0 | 0 | 0 | 0 | 0.0 | — | 72.0 | gi | 8.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 0.0 | Stainless Steel | 400.0 | 0 | 0 | 0 | no | — | — | Submersible Pump | — | 0.0 | 0.0 | Generator | 0 | 0.0 | — | — | poor | Non_ functional and poor water supply condition. | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 18/04/1972 | 0 | 1.Rehabilatation of water bore hole | — | — |
8478 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 22, 2022 | Middle Shabelle | jowhar | Labiga | 0.0 | IMC | 14/09/2019 | Reer Maxamed Fidow | — | 2.8095483 | 45.4835367 | 103.0 | — | — | — | rural | yes | — | No | 1 year ago, because of the floods | 1890 | — | — | — | — | — | — | — | — | — | — | — | — | — | 9.0 | 4.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 10.0 | PVC | 15.0 | 95 | 1 | — | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | It's not working | no | — | — | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | Community_e | 16-Sep-20 | Rehabilitation | Solar system, generator and caretaker room, pipeline extension and supply of submersible pump. | — | — |
7333 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 1, 2022 | Mudug | jariban | Jariiban | 0.0 | WDA | 01/03/1986 | Jariiban BH 2 | — | 7.2139241 | 48.8476088 | 149.0 | — | 3 | — | rural urban | yes | — | Yes | — | 21000 | — | — | — | 0.0 | — | 182.0 | pvc | 8.0 | — | 14.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 24.0 | Galvanised Steel | 200.0 | — | 1 | 2 | yes | 40 | 8.0 | Submersible Pump | Green fos | 11.0 | 126.0 | Generator | Parkins | 45.0 | — | — | poor | This supply needs extension pipelines, new kiosks, and solar power | yes | Colorless and odorless | 27.6 | 7.43 | 1205.0 | 603.0 | — | Communal | yes | 01/03/2016 | 3 | 2 | yes | 0 | yes | — | — | — | CARE Somalia | 01/11/2021 | 1. Construction of elevated water tank 2. Construction Caretaker rooms 3. Pipe rehabilitation | 1. Emergency 2. Installation of solar power 3. Fancing 4. operator support 5. Emergency of supporting of fuel. | — | — |
8263 | — | Borehole | Somaliland MoWRD | April 18, 2022 | Sanaag | ceerigaabo | Cerigabo | 2.0 | Somali government | 18/04/1972 | Cerigabo WD1 | — | 10.6309138 | 47.3626203 | 1784.0 | — | 2 | — | rural urban | no | 0 | Abandoned | 1. Exhausted bore hole | 0 | 0 | 0 | 0 | 0.0 | — | 72.0 | gi | 8.0 | — | 0.0 | 0.0 | 0.0 | 0.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 0.0 | Stainless Steel | 500.0 | 0 | 1 | 0 | no | — | — | Submersible Pump | — | 0.0 | 0.0 | Generator | 0 | 0.0 | — | — | poor | Non functioning water supply | no | — | 0.0 | — | — | — | — | Communal | no | — | — | — | no | — | no | — | — | — | — | 18/06/1972 | 10 | 1.Non funcitional New hore hole drilling | — | — |
8549 | — | Dam | FGS Ministry of Energy and Water Resources | April 19, 2022 | Bakool | tayeeglow | Misir | 2.0 | Community | 01/05/1972 | Misir | — | 3.986712 | 44.59611 | — | — | 1 | — | rural | yes | — | Yes | — | 100 | 500 | 200 | 70 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 7.0 | 2.0 | 4.0 | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 4.0 | Other | 2.0 | 370 | — | — | — | — | — | No Pump | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | yes | — | 2 | 5 | — | — | — | — | — | — | — | — | — | Cannal rehabilitation and Expanding | — | — |
8415 | — | Dug Well | Somaliland MoWRD | May 9, 2022 | Awdal | baki | Baki | — | Aamina aw cilmi | — | Baki 6 | — | 10.0270341 | 43.3684144 | 1010.0 | — | — | — | rural | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | PVC | 300.0 | — | 0 | 0 | no | — | — | Surface mounted Pump | — | 1.0 | — | Generator | — | 2.5 | — | — | poor | The supply is used for a potable generator of 2.5 KVA, which distributes the water trogh the farm. | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
8574 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 22, 2022 | Middle Shabelle | jowhar | Kulmis | 0.0 | PAH | 08/06/2019 | Maxamadow | — | 2.7863837 | 45.4994374 | 71.0 | — | 19 | — | urban | no | 3 | Yes | — | 100 | — | — | — | — | — | — | — | — | — | — | — | — | — | 6.0 | 4.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | Other | 2.0 | PVC | 20.0 | 20 | — | — | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | Private | 7-Jun-21 | Dianimo change | Deepening, Decementation, supply of submersible pump, GI pipes and installation of solar system. | — | — |
8525 | — | Dug Well | Somaliland MoWRD | April 30, 2022 | Woqooyi Galbeed | hargeisa | Xareed | 0.1 | Private | 30/04/2020 | Xareed 1 | — | 9.5186219 | 43.924545 | 1327.0 | — | 1 | — | rural | no | 10 | No | the long dry season occured in the last three years causes water shortage for many parts of the country including this area. This point stopped before two to three months. | 150 | 300 | 200 | 600 | 0.0 | — | — | — | — | — | — | — | — | — | 9.0 | — | — | — | — | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 20 | 0 | 2 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | There is no supply system connected to this water point | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
7432 | — | Spring | Puntland Ministry of Energy Minerals and Water | March 16, 2022 | Bari | iskushuban | Foocaar | 7.0 | UNICEF | 21/09/2005 | Lodhuda spring | — | 10.3309356 | 50.8652081 | 10.0 | — | 4 | — | urban rural | yes | — | Yes | — | 1500 | 200 | — | 1000 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | 0.5 | — | — | — | — | Concrete/Masonry tank | 10.0 | Galvanised Steel | — | — | — | — | no | — | — | — | — | — | — | — | — | — | — | — | poor | The yield is low. No submersible pump, solar power installation and generator. | no | — | 29.6 | 7.6 | 1740.0 | 875.0 | — | Communal | no | — | — | — | yes | 0.1 | no | — | — | — | Puntland MoEMW | 24/10/2019 | Replacement of distribution pipe lines. | 1: To asset a way of increasing the yield of water, or provide another way of water sources. 2: Distribution pipe line and its accessories such as valves, tee, elbow, couple. 3: Construction of a dug well or distribution of water from another spring which is far from the village to 10 kilometer, due to water demand 5: Construction of elevated water tank and kiosks. | — | — |
7040 | — | Dug Well | FGS Ministry of Energy and Water Resources | March 15, 2022 | Hiraan | beled_weyne | Dhagax jibis | 1.0 | Community | 06/11/2011 | Madoobe water supply | — | 4.7403153 | 45.2119971 | 152.0 | — | 4 | — | urban | yes | — | Yes | — | 12000 | — | — | — | — | — | — | — | — | — | — | — | — | — | 13.0 | 4.0 | 10.0 | 5.0 | 6.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | PVC | 35000.0 | 1714 | 0 | 0 | no | — | — | No Pump | — | — | — | — | — | — | — | — | poor | Need water storage and filter | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0 | yes | — | — | — | Agency not specified | — | 0 | Solar system | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France