Database :: SWIMS
Id Code Select the type of water source being inspected Select the agency inspecting this water source Enter the date of source inspection Region District Enter the name of settlement / village where the source is located Distance to nearest settlement (KM) Select the agency that established this water source Enter the date when the source was established Enter the water source name Source gpspoint Enter water source Latitude in decimal degrees Enter water source Longitude in decimal degrees Enter Elevation (m.a.s.l) Enter GPS Precision (m) Enter number of water sources in a cluster Water Source Photographs Select the category of users for this water source Is this a permanent status water source? For how many months in a year is this water source in use (#)? Is this water source currently functioning? Non functioning reason No. of persons using No. of Camels using the source No. of Cattle using the source No. of Sheep/Goats using the source Area irrigated using the source (ha) Is the source protected? What is the depth of this borehole (m)? Type of Casing Casing size (inches) What is the current static water level of this borehole (m)? What is the yield of this borehole (m3/hr)? How long is this borehole operated in a day (hr)? What is the borehole draw down (m)? After pumping, how long does this borehole take to recover (hr)? What is the depth of this dug well (m)? What is the current static water level of this dug well (m)? What is the yield of this dug well (m3/hr)? How long is this dug well operated in a day (hr)? What is the dug well draw down (m)? After pumping, how long does this dug well take to recover (hr)? What is the depth of this dam (m)? What is the length of this dam (m)? What is the width of this dam (m)? What is the depth of this berkad (m)? What is the length of this berkad (m)? What is the width of this berkad (m)? What is the cumulative discharge rate of this spring (m3/hr)? What is the depth of this source (m)? What is the length of this source (m)? What is the width of this source (m)? What is the yield of the source (m3/hr)? What type of reservoir is used for this source? Reservoir capacity (m3) Pipeline type Pipeline length (m) How many House Holds (HH) are connected to this water source? How many kiosks/water points are connected to this source? How many animal troughs are connected to this source? Source used for water trucking during emergency? No. of trucks / day Average truck capacity (m3) Pump type Pump model Pump capacity (m3/hr) Pump level (m) Power source Generator/Solar type Generator capacity (kVA/kWh) What type/model is the solar used? What capacity is the solar (kWh)? Condition of supply system Additional notes on supply & distribution system condition Any visible physical problem (color, odor)? Please describe the color, odor and smell of water Temperature PH Electrical Conductivity (µs/cm) Total Dissolved Solids (mg/l) Water sample code. (if taken) Management type Water & Sanitation Committee (WSC)? Year established WSC members male WSC members female DIs water for human use charged? Current cost of 20 ltr jerrican (USD/20ltr) Is water for animal use charged? Current cost for Livestock (USD/100ltr) What is the name of the operator/caretaker for this water source? What is the phone number of the operator/caretaker? Which agency carried out last intervention on this water source? Recent interventions Last intervention date Proposed intervention description Additional Notes Metadata Tag
7501 Borehole Puntland Ministry of Energy Minerals and Water March 26, 2022 Nugaal garowe Laanta Hawada 0.0 ISRC 26/11/2020 Laanta hawada BH 8.4453609 48.5708308 402.0 1 urban rural yes Yes 900 500 1500 0.0 200.0 pvc 8.0 43.8 16.0 12.0 85.9 2.0 Concrete/Masonry tank 25.0 PVC 550.0 11 3 2 yes 6 8.0 Submersible Pump Lowara 11.0 159.0 Hybrid - Solar/Generator Parkins 30.0 BR-M300W 16.2 good yes Colorless and odorless 32.1 8.1 3960.0 1965.0 Communal yes 29/01/2020 3 1 yes 0.05 no ISRC 29/01/2020 1. Installation of solar power Currently there is no any intervention
7503 Borehole Puntland Ministry of Energy Minerals and Water March 27, 2022 Nugaal garowe Garowe NUWACO Water Company 27/03/2015 Duurey BH 8.413593 48.4582248 449.0 2 urban yes Yes 2100 300.0 pvc 8.0 12.0 24.0 2.0 PVC 7000.0 300 0 0 yes 5 8.0 Submersible Pump Lowara 15.0 210.0 Hybrid - Solar/Generator Parkins 65.0 YL265p_39b 27.8 good yes Colorless and odorless 35.8 7.61 3850.0 1923.0 Private-Public-Partnership yes 0.05 no World Vision 27/03/2018 1. Installation of solar power 1. Construction of new elevated tank
7506 Borehole Puntland Ministry of Energy Minerals and Water March 2, 2022 Mudug galkayo Ballibusle GTZ 02/03/1986 Ballibusle BH 1 7.0982223 48.1592113 244.0 3 rural urban yes Yes 22400 0.0 180.0 pvc 8.0 12.0 8.0 3.0 Concrete/Masonry tank 28.0 Galvanised Steel 1500.0 1500 1 2 yes Submersible Pump Lowara 15.0 125.0 Generator Parkins 45.0 poor Needs rehabilitation of kiosks and animal thoughts yes Colorless and odorless 29.2 7.9 3760.0 1850.0 Communal yes 02/03/2005 3 0 yes 0.05 no 1. (Emergence) rehibilatation of pump and riser pipes 2. Full rehabilitation( kiosks, elevated tank, and animal thoughts). 2. Installation of solar power. 3. Pipelines rehabilitation 4. Fuel supporting. 5. Fancing.
7746 Borehole Galmudug Ministry of Energy and Water Resources March 28, 2022 Galgaduud cabudwaaq Horseed 2.0 Ceel sacuudi 28/06/2008 Ceel sacuudi 6.2408351 46.2272794 385.0 0 urban yes Yes 3540 140.0 pvc 8.0 28.0 18.0 Concrete/Masonry tank 80.0 Galvanised Steel 150.0 2040 2 2 no Submersible Pump not known 104.0 Generator perkin 30.0 fair no 30.3 7.05 3140.0 1570.0 Communal yes 3 2 yes 0.004 yes
7507 Borehole Puntland Ministry of Energy Minerals and Water March 2, 2022 Mudug galkayo Jeexdin Jeexdin BH 6.863615 47.5331415 287.0 1 rural urban yes Yes 7000 3000 4000 0.0 220.0 pvc 8.0 8.0 12.0 2.0 Concrete/Masonry tank 16.0 Galvanised Steel 500.0 20 8 2 yes 5 30.0 Submersible Pump 11.0 180.0 Hybrid - Solar/Generator Parkins 50.0 YL320P_35b 12.8 fair Needs rehabilitation of supplies yes Colorless and odorless 28.8 7.76 3560.0 1690.0 Communal yes 02/03/2015 5 2 yes 0.05 no KAALO Relief and Development 02/03/2018 Construction of elevated tank 1. Rehabilitation of pump and riser pipes 2. Extension of pipelines. 3. Rehabilitation of kiosks and animal thoughts
7508 Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo UNICEF 05/03/2003 Galkacayo Water Company BH 1 6.7959241 47.4156132 255.0 20 urban yes Yes 77000 220.0 pvc 12.0 26.0 15.0 3.0 Steel tank 750.0 PVC 6000.0 1600 no Submersible Pump Saha 22.0 150.0 Hybrid - Solar/Generator 70.0 SZYL_M350-36 31.5 good yes Colorless and odorless 27.5 7.92 3510.0 1720.0 Private-Public-Partnership yes 0.05 no 1. Pipelines extension
7510 Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo Galkacayo Water Company 05/03/2006 Galkacayo BH 3 6.7983486 47.4099016 270.0 20 urban yes Yes 77000 220.0 pvc 12.0 27.0 15.0 3.3 Concrete/Masonry tank 30.0 Stainless Steel 2000.0 1600 no Submersible Pump Franklin 22.0 104.0 Generator 350.0 yes Colorless and odorless 28.3 7.41 3380.0 1722.0 Private-Public-Partnership yes 0.05 no 1. Construction of new elevated tank
7511 Borehole Puntland Ministry of Energy Minerals and Water March 6, 2022 Mudug galkayo Galkacayo 1.2 UNHRC 06/03/2015 Salaama IDP 2 BH 6.8555099 47.4437124 268.0 20 urban yes Yes 31200 210.0 pvc 8.0 84.0 15.0 16.0 3.0 Concrete/Masonry tank 81.0 PVC 4200.0 9 2 no Submersible Pump Lowara 15.0 126.0 Hybrid - Solar/Generator Parkins 65.0 300_73M 22.5 fair This supply has generator problem, so needs rehabilitation of generator yes Colorless and odorless 29.5 7.8 3370.0 1667.0 Communal yes 06/03/2015 4 2 yes 0.05 no Agency not specified 06/03/2018 Construction of elevated water 1. Rehabilitation of pipelines 2. Rehabilitation of pump 3. Rehabilitation of generator ( Emergency).
7512 Borehole Puntland Ministry of Energy Minerals and Water March 27, 2022 Nugaal garowe Garowe NUWACO Water Company 27/03/2013 Taakulo BH 8.3952759 48.4655597 452.0 10 urban yes Yes 9100 90.0 pvc 8.0 40.0 17.0 8.0 1.3 Concrete/Masonry tank 777.0 PVC 2500.0 1500 0 0 no Submersible Pump Lowara 11.0 78.0 Generator Parkins 60.0 good yes Colorless and odorless 34.8 7.32 3315.0 1652.0 Private-Public-Partnership yes 0.05 no
7513 Borehole Puntland Ministry of Energy Minerals and Water March 5, 2022 Mudug galkayo Galkacayo UNICEF 05/03/2003 Galkacayo water company BH 2 6.7940122 47.4114582 251.0 20 urban yes Yes 77000 220.0 pvc 12.0 45.0 15.0 3.0 Steel tank 750.0 PVC 5000.0 1600 no Submersible Pump Lowara 22.0 120.0 Generator 350 350.0 yes Colorless and odorless 27.6 7.61 3300.0 1635.0 Private-Public-Partnership yes 0.05 no 1. Rehabilitation of elevated water tank

Donors

SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France

Donors