Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7501 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 26, 2022 | Nugaal | garowe | Laanta Hawada | 0.0 | ISRC | 26/11/2020 | Laanta hawada BH | — | 8.4453609 | 48.5708308 | 402.0 | — | 1 | — | urban rural | yes | — | Yes | — | 900 | 500 | — | 1500 | 0.0 | — | 200.0 | pvc | 8.0 | 43.8 | 16.0 | 12.0 | 85.9 | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 25.0 | PVC | 550.0 | 11 | 3 | 2 | yes | 6 | 8.0 | Submersible Pump | Lowara | 11.0 | 159.0 | Hybrid - Solar/Generator | Parkins | 30.0 | BR-M300W | 16.2 | good | — | yes | Colorless and odorless | 32.1 | 8.1 | 3960.0 | 1965.0 | — | Communal | yes | 29/01/2020 | 3 | 1 | yes | 0.05 | no | — | — | — | ISRC | 29/01/2020 | 1. Installation of solar power | Currently there is no any intervention | — | — |
7503 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | NUWACO Water Company | 27/03/2015 | Duurey BH | — | 8.413593 | 48.4582248 | 449.0 | — | 2 | — | urban | yes | — | Yes | — | 2100 | — | — | — | — | — | 300.0 | pvc | 8.0 | — | 12.0 | 24.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | PVC | 7000.0 | 300 | 0 | 0 | yes | 5 | 8.0 | Submersible Pump | Lowara | 15.0 | 210.0 | Hybrid - Solar/Generator | Parkins | 65.0 | YL265p_39b | 27.8 | good | — | yes | Colorless and odorless | 35.8 | 7.61 | 3850.0 | 1923.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | World Vision | 27/03/2018 | 1. Installation of solar power | 1. Construction of new elevated tank | — | — |
7506 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Ballibusle | — | GTZ | 02/03/1986 | Ballibusle BH 1 | — | 7.0982223 | 48.1592113 | 244.0 | — | 3 | — | rural urban | yes | — | Yes | — | 22400 | — | — | — | 0.0 | — | 180.0 | pvc | 8.0 | — | 12.0 | 8.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 1500.0 | 1500 | 1 | 2 | yes | — | — | Submersible Pump | Lowara | 15.0 | 125.0 | Generator | Parkins | 45.0 | — | — | poor | Needs rehabilitation of kiosks and animal thoughts | yes | Colorless and odorless | 29.2 | 7.9 | 3760.0 | 1850.0 | — | Communal | yes | 02/03/2005 | 3 | 0 | yes | 0.05 | no | — | — | — | — | — | — | 1. (Emergence) rehibilatation of pump and riser pipes 2. Full rehabilitation( kiosks, elevated tank, and animal thoughts). 2. Installation of solar power. 3. Pipelines rehabilitation 4. Fuel supporting. 5. Fancing. | — | — |
7746 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 28, 2022 | Galgaduud | cabudwaaq | Horseed | 2.0 | Ceel sacuudi | 28/06/2008 | Ceel sacuudi | — | 6.2408351 | 46.2272794 | 385.0 | — | 0 | — | urban | yes | — | Yes | — | 3540 | — | — | — | — | — | 140.0 | pvc | 8.0 | — | 28.0 | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 80.0 | Galvanised Steel | 150.0 | 2040 | 2 | 2 | no | — | — | Submersible Pump | not known | — | 104.0 | Generator | perkin | 30.0 | — | — | fair | — | no | — | 30.3 | 7.05 | 3140.0 | 1570.0 | — | Communal | yes | — | 3 | 2 | yes | 0.004 | yes | — | — | — | — | — | — | — | — | — |
7507 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 2, 2022 | Mudug | galkayo | Jeexdin | — | — | — | Jeexdin BH | — | 6.863615 | 47.5331415 | 287.0 | — | 1 | — | rural urban | yes | — | Yes | — | 7000 | 3000 | — | 4000 | 0.0 | — | 220.0 | pvc | 8.0 | — | 8.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 16.0 | Galvanised Steel | 500.0 | 20 | 8 | 2 | yes | 5 | 30.0 | Submersible Pump | — | 11.0 | 180.0 | Hybrid - Solar/Generator | Parkins | 50.0 | YL320P_35b | 12.8 | fair | Needs rehabilitation of supplies | yes | Colorless and odorless | 28.8 | 7.76 | 3560.0 | 1690.0 | — | Communal | yes | 02/03/2015 | 5 | 2 | yes | 0.05 | no | — | — | — | KAALO Relief and Development | 02/03/2018 | Construction of elevated tank | 1. Rehabilitation of pump and riser pipes 2. Extension of pipelines. 3. Rehabilitation of kiosks and animal thoughts | — | — |
7508 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | UNICEF | 05/03/2003 | Galkacayo Water Company BH 1 | — | 6.7959241 | 47.4156132 | 255.0 | — | 20 | — | urban | yes | — | Yes | — | 77000 | — | — | — | — | — | 220.0 | pvc | 12.0 | — | 26.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 750.0 | PVC | 6000.0 | 1600 | — | — | no | — | — | Submersible Pump | Saha | 22.0 | 150.0 | Hybrid - Solar/Generator | — | 70.0 | SZYL_M350-36 | 31.5 | good | — | yes | Colorless and odorless | 27.5 | 7.92 | 3510.0 | 1720.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Pipelines extension | — | — |
7510 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | Galkacayo Water Company | 05/03/2006 | Galkacayo BH 3 | — | 6.7983486 | 47.4099016 | 270.0 | — | 20 | — | urban | yes | — | Yes | — | 77000 | — | — | — | — | — | 220.0 | pvc | 12.0 | — | 27.0 | 15.0 | — | 3.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Stainless Steel | 2000.0 | 1600 | — | — | no | — | — | Submersible Pump | Franklin | 22.0 | 104.0 | Generator | — | 350.0 | — | — | — | — | yes | Colorless and odorless | 28.3 | 7.41 | 3380.0 | 1722.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Construction of new elevated tank | — | — |
7511 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 6, 2022 | Mudug | galkayo | Galkacayo | 1.2 | UNHRC | 06/03/2015 | Salaama IDP 2 BH | — | 6.8555099 | 47.4437124 | 268.0 | — | 20 | — | urban | yes | — | Yes | — | 31200 | — | — | — | — | — | 210.0 | pvc | 8.0 | 84.0 | 15.0 | 16.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 81.0 | PVC | 4200.0 | — | 9 | 2 | no | — | — | Submersible Pump | Lowara | 15.0 | 126.0 | Hybrid - Solar/Generator | Parkins | 65.0 | 300_73M | 22.5 | fair | This supply has generator problem, so needs rehabilitation of generator | yes | Colorless and odorless | 29.5 | 7.8 | 3370.0 | 1667.0 | — | Communal | yes | 06/03/2015 | 4 | 2 | yes | 0.05 | no | — | — | — | Agency not specified | 06/03/2018 | Construction of elevated water | 1. Rehabilitation of pipelines 2. Rehabilitation of pump 3. Rehabilitation of generator ( Emergency). | — | — |
7512 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | NUWACO Water Company | 27/03/2013 | Taakulo BH | — | 8.3952759 | 48.4655597 | 452.0 | — | 10 | — | urban | yes | — | Yes | — | 9100 | — | — | — | — | — | 90.0 | pvc | 8.0 | 40.0 | 17.0 | 8.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 777.0 | PVC | 2500.0 | 1500 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 11.0 | 78.0 | Generator | Parkins | 60.0 | — | — | good | — | yes | Colorless and odorless | 34.8 | 7.32 | 3315.0 | 1652.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | — | — | — |
7513 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 5, 2022 | Mudug | galkayo | Galkacayo | — | UNICEF | 05/03/2003 | Galkacayo water company BH 2 | — | 6.7940122 | 47.4114582 | 251.0 | — | 20 | — | urban | yes | — | Yes | — | 77000 | — | — | — | — | — | 220.0 | pvc | 12.0 | — | 45.0 | 15.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Steel tank | 750.0 | PVC | 5000.0 | 1600 | — | — | no | — | — | Submersible Pump | Lowara | 22.0 | 120.0 | Generator | 350 | 350.0 | — | — | — | — | yes | Colorless and odorless | 27.6 | 7.61 | 3300.0 | 1635.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | 1. Rehabilitation of elevated water tank | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France