Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7185 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 21, 2022 | Bari | iskushuban | Dhuumoodle | 2.0 | Community_ | 21/03/2015 | Dhuumoodle 1 | — | 10.4797765 | 50.4141208 | 284.0 | — | 2 | — | rural urban | yes | — | Yes | — | 9000 | 16000 | — | 30000 | 3.0 | — | 120.0 | pvc | 8.0 | 40.0 | 56.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 40.0 | PVC | 500.0 | — | 1 | 2 | yes | 48 | 8.0 | Submersible Pump | Luwara | — | 70.0 | Hybrid - Solar/Generator | Perkins | 50.0 | — | 21.6 | poor | 1.Main raising pipes are rusted and leaking 2.the elevated water tank is not enough 3.Generator is malfunctioning 4.solar system are too weak to generate enough power | no | — | 28.3 | 7.75 | 2370.0 | 1180.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | CARE Somalia | 01/01/2019 | Elevated water tank and troughs | 1. Immediate change of main raising pipes and the submersible pump before it stops functioning and get cut-off. 2.Solar-power with battery storage and Generator 3. A Larger capacity of water tank 4. 3 more troughs | — | — |
7289 | — | Borehole | FGS Ministry of Energy and Water Resources | April 1, 2022 | Lower Shabelle | wanla_weyn | Cagaboorey | 3.0 | Private | 01/04/2021 | Cagboorey well | — | 2.6273617 | 44.8847067 | 98.0 | — | 1 | — | urban rural | yes | — | Yes | — | 200 | 60 | 70 | 100 | 0.0 | — | 69.0 | pvc | — | 13.0 | 10.0 | 6.0 | 13.0 | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Plastic tank | 10.0 | PVC | 100.0 | 100 | 0 | 1 | yes | 3 | 10.0 | Submersible Pump | Italy | 5.0 | 2.0 | Generator | Jengafire | 20.0 | — | — | good | — | no | — | 0.0 | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.001 | yes | — | — | — | Private | 1-Apr-21 | Remove soil, mantance tank water | New solar, new generator, new pump and building tank water. | — | — |
7199 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 3, 2022 | Sanaag | laasqoray | Laasqoray | 1.0 | Somaliland MoWRD | 03/04/2018 | Laasqoray borehole | — | 11.1799066 | 48.2423582 | -3.0 | — | 3 | — | rural | yes | — | Yes | — | 600 | 300 | — | 1200 | 0.5 | — | 22.0 | pvc | 8.0 | 21.0 | 5.0 | 8.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | Galvanised Steel | 50.0 | — | 1 | 2 | yes | 3 | 6.0 | Submersible Pump | Lowara | — | — | Solar | — | — | — | — | poor | Distribution pipes are rusted. | no | — | 34.6 | 8.1 | 2810.0 | 1400.0 | — | Communal | no | — | — | — | yes | 0.03 | yes | — | — | — | Community_e | 09/09/2020 | Construction of animal water troughs | 1: Pipes 2: Tools such as pipe accessories. 3: Construction of new borehole that has a less salinity | — | — |
7198 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 23, 2022 | Bari | qardho | Harwayn | 3.0 | Private | 23/01/2016 | Harwayn borehole | — | 9.5297019 | 49.1097173 | 702.0 | — | 9 | — | rural urban | yes | — | Yes | — | 6000 | 2500 | — | 10000 | 8.0 | — | 315.0 | pvc | 8.0 | 218.0 | 12.0 | 18.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 56.0 | Galvanised Steel | 300.0 | — | 2 | 2 | yes | 12 | 50.0 | Submersible Pump | Lawara | — | 264.0 | Hybrid - Solar/Generator | Perkins | 50.0 | — | — | good | — | no | — | 33.0 | 6.6 | 3000.0 | 1500.0 | — | Private/Individual | — | — | — | — | yes | 0.04 | yes | — | — | — | Community | 23/12/2018 | Replacement of main raising pipe lines | 1: Fencing. 2: Construction of extra elevated water tank 3: Electric cable which acess generator. 4: Replacement of main raising pipes and submersible pump. | — | — |
7186 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 24, 2022 | Bari | iskushuban | Dharjaale | 0.7 | ICRC | 10/06/2016 | Dharjaale borehole | — | 10.4808913 | 50.0205457 | 332.0 | — | 1 | — | rural urban | yes | — | Yes | — | 5000 | 700 | — | 5000 | 1.0 | — | 266.0 | pvc | 8.0 | 166.0 | 12.0 | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 66.0 | Galvanised Steel | 1000.0 | — | 11 | 4 | yes | 5 | 6.0 | Submersible Pump | Grundfose | — | 125.0 | Hybrid - Solar/Generator | Perkins | 45.0 | — | 16.8 | fair | Pipeline supply are malfunctioning | no | — | 28.0 | 8.0 | 2310.0 | 1168.0 | — | Communal | yes | 21/10/2017 | 4 | 3 | yes | 0.05 | yes | — | — | — | KAALO Relief and Development | 21/06/2021 | 1: Replacement of main raising pipes and submersible pump. 2: Constructed a new elevated water tank. 3: Constructed two kiosks. | 1: Construction of another borehole. 2: Replacement of main raising pipes. 3: Distribution and change of pipeline, 4:battery storage 5:Construction of rooms for caretaker and toilets. 6:due to the inflation and the gasoline prices increase they asked for support, & the community are unable to afford. | — | — |
7255 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 28, 2022 | Galgaduud | cabudwaaq | Huursh roobda.ay | 1.0 | Community | 24/12/2015 | Roobda.ay borehole | — | 6.1140889 | 46.3238468 | 322.0 | — | 0 | — | rural urban | yes | — | Yes | — | 3500 | 250 | — | 35000 | — | — | 150.0 | pvc | 6.0 | — | 15.0 | 20.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 80.0 | 1000 | 1 | 0 | yes | 3 | 10.0 | Submersible Pump | Franklin | — | 100.0 | Generator | Perkin | 30.0 | — | — | poor | — | no | — | 29.6 | 7.61 | 1470.0 | 730.0 | — | Communal | yes | — | 4 | 2 | yes | 0.002 | yes | — | — | — | NRC | Solar | — | — | — | — |
7504 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 27, 2022 | Nugaal | garowe | Garowe | — | NUWACO Water Company | 27/03/2015 | Washington BH | — | 8.4175032 | 48.5061087 | 436.0 | — | 10 | — | urban | yes | — | Yes | — | 9100 | — | — | — | — | — | 100.0 | pvc | 8.0 | 12.0 | 12.0 | 24.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | PVC | 5000.0 | 1300 | 0 | 0 | no | — | — | Submersible Pump | Lowara | 30.0 | 72.0 | Generator | Parkins | 110.0 | — | — | good | — | yes | Colorless and odorless | 28.8 | 7.61 | 3840.0 | 1923.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | no | — | — | — | — | — | — | — | — | — |
7188 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Bursaalax | — | Community | 12/03/2001 | Ceelcadde bursalaax BH | — | 7.1857728 | 47.2462594 | 355.0 | — | 7 | — | urban | yes | — | Yes | — | 3520 | — | — | — | — | — | 196.0 | pvc | 8.0 | — | 20.0 | 15.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Galvanised Steel | 5000.0 | 520 | 5 | 3 | yes | 2 | 8.0 | Submersible Pump | Lowara | 11.0 | 168.0 | Hybrid - Solar/Generator | Parkins | 35.0 | SZYL_M350_36 | 25.0 | good | — | yes | Colorless and odorless | 29.5 | 8.21 | 2145.0 | 1003.0 | — | Private/Individual | — | — | — | — | yes | 0.05 | yes | — | — | — | ICRC | 12/03/2019 | Installation of solar power | 1. Construction of new elevated tank 2. Extension of pipelines to IDP. | — | — |
7189 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Laanmadow | — | Community | — | Laanmadow BH | — | 7.3302253 | 47.2966161 | 354.0 | — | 1 | — | urban rural | yes | — | Yes | — | 950 | 1800 | — | 2200 | 0.0 | — | — | pvc | 8.0 | — | — | 12.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 20.0 | Stainless Steel | — | — | 2 | 2 | yes | 10 | 8.0 | Submersible Pump | — | 11.0 | — | Hybrid - Solar/Generator | Parkins | 45.0 | — | — | poor | The operator of borehole has no good detail information about tha borehole and supplies. | yes | Colorless and odorless | 29.9 | 7.61 | 1940.0 | 958.0 | — | Communal | no | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | 1. Fancing 2. Rehabilitation of kiosks 3. Rehabilitation of animal troughts | — | — |
7190 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Mudug | goldogob | Kuwait | — | Kuwait charity | 12/03/2014 | Kuwait BH | — | 7.3939088 | 47.2250603 | 395.0 | — | 1 | — | rural urban | yes | — | Yes | — | 4200 | 1000 | — | 2000 | — | — | 155.0 | pvc | 8.0 | — | 16.7 | 18.0 | — | 3.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 64.0 | PVC | 2000.0 | 100 | 3 | 2 | yes | 20 | 8.0 | Submersible Pump | Lowara | 11.0 | 142.0 | Hybrid - Solar/Generator | Parkins | 45.0 | DS7230M | 17.34 | fair | — | yes | Colorless and odorless | 31.5 | 8.04 | 1838.0 | 912.5 | — | Communal | yes | 12/03/2014 | 5 | 0 | yes | 0.05 | yes | — | — | — | NRC | 12/03/2021 | 1. Construction of operator room. | 1. Rehabilitation of pump and riser pipes and cables. 2. Fuel supporting. 3. Rehabilitation of animal troughts. 4. Rehabilitation and construction of koisks. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France