Id | Code | Select the type of water source being inspected | Select the agency inspecting this water source | Enter the date of source inspection | Region | District | Enter the name of settlement / village where the source is located | Distance to nearest settlement (KM) | Select the agency that established this water source | Enter the date when the source was established | Enter the water source name | Source gpspoint | Enter water source Latitude in decimal degrees | Enter water source Longitude in decimal degrees | Enter Elevation (m.a.s.l) | Enter GPS Precision (m) | Enter number of water sources in a cluster | Water Source Photographs | Select the category of users for this water source | Is this a permanent status water source? | For how many months in a year is this water source in use (#)? | Is this water source currently functioning? | Non functioning reason | No. of persons using | No. of Camels using the source | No. of Cattle using the source | No. of Sheep/Goats using the source | Area irrigated using the source (ha) | Is the source protected? | What is the depth of this borehole (m)? | Type of Casing | Casing size (inches) | What is the current static water level of this borehole (m)? | What is the yield of this borehole (m3/hr)? | How long is this borehole operated in a day (hr)? | What is the borehole draw down (m)? | After pumping, how long does this borehole take to recover (hr)? | What is the depth of this dug well (m)? | What is the current static water level of this dug well (m)? | What is the yield of this dug well (m3/hr)? | How long is this dug well operated in a day (hr)? | What is the dug well draw down (m)? | After pumping, how long does this dug well take to recover (hr)? | What is the depth of this dam (m)? | What is the length of this dam (m)? | What is the width of this dam (m)? | What is the depth of this berkad (m)? | What is the length of this berkad (m)? | What is the width of this berkad (m)? | What is the cumulative discharge rate of this spring (m3/hr)? | What is the depth of this source (m)? | What is the length of this source (m)? | What is the width of this source (m)? | What is the yield of the source (m3/hr)? | What type of reservoir is used for this source? | Reservoir capacity (m3) | Pipeline type | Pipeline length (m) | How many House Holds (HH) are connected to this water source? | How many kiosks/water points are connected to this source? | How many animal troughs are connected to this source? | Source used for water trucking during emergency? | No. of trucks / day | Average truck capacity (m3) | Pump type | Pump model | Pump capacity (m3/hr) | Pump level (m) | Power source | Generator/Solar type | Generator capacity (kVA/kWh) | What type/model is the solar used? | What capacity is the solar (kWh)? | Condition of supply system | Additional notes on supply & distribution system condition | Any visible physical problem (color, odor)? | Please describe the color, odor and smell of water | Temperature | PH | Electrical Conductivity (µs/cm) | Total Dissolved Solids (mg/l) | Water sample code. (if taken) | Management type | Water & Sanitation Committee (WSC)? | Year established | WSC members male | WSC members female | DIs water for human use charged? | Current cost of 20 ltr jerrican (USD/20ltr) | Is water for animal use charged? | Current cost for Livestock (USD/100ltr) | What is the name of the operator/caretaker for this water source? | What is the phone number of the operator/caretaker? | Which agency carried out last intervention on this water source? | Recent interventions | Last intervention date | Proposed intervention description | Additional Notes | Metadata Tag |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
7911 | — | Spring | Somaliland MoWRD | May 7, 2022 | Awdal | zeylac | Idaar | — | — | — | Dhanaan spr | — | 10.4774621 | 43.1539438 | 579.0 | — | — | — | rural | yes | — | Yes | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | no | — | 32.0 | 8.0 | 2430.0 | 1720.0 | — | Communal | no | — | — | — | no | — | no | — | — | — | — | — | — | — | — | — |
7192 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 8, 2022 | Mudug | goldogob | Goldogob | — | Galdogob Water Company | 08/08/2021 | Goldogob BH 7 | — | 7.0300828 | 47.0049931 | 346.0 | — | 11 | — | urban | yes | — | Yes | — | — | — | — | — | — | — | 235.0 | pvc | 8.0 | 140.0 | 18.0 | — | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 400.0 | PVC | — | — | — | — | no | — | — | Submersible Pump | Grandfoss | 15.0 | 180.0 | Generator | — | — | — | — | — | — | yes | Colorless and odorless | 30.6 | 7.81 | 1635.0 | 805.0 | — | Private-Public-Partnership | — | — | — | — | yes | 0.05 | yes | — | — | — | — | — | — | inspection | — | — |
7097 | — | Borehole | Puntland Ministry of Energy Minerals and Water | March 12, 2022 | Bari | qardho | Juurile | — | Community_ | 01/09/2016 | Dhuur borehole 1 | — | 10.4176885 | 49.0949138 | 656.0 | — | 3 | — | rural urban | yes | — | Yes | — | 12000 | 800 | — | 4500 | — | — | 180.0 | pvc | 8.0 | 80.0 | 36.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 171.0 | PVC | 200.0 | — | 1 | 2 | yes | 70 | 9.0 | Submersible Pump | Lowara | — | 150.0 | Hybrid - Solar/Generator | 2 generator, both are Perkins 100kva&50kva | 150.0 | JP-300M-72 YL365D-36b | 25.6 | good | The borehole has a good yield which is equal 36 meter cubic per hour. The consumption of the borehole is water trucking. | no | — | 26.8 | 7.7 | 1400.0 | 700.0 | — | Private/Individual | — | — | — | — | yes | 0.02 | yes | — | — | — | Community_e | 18/07/2021 | Replacement of main raising pipes and submersible pump. | Replacement of main raising pipes and submersible pump Construction of caretaker room. | — | — |
7099 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 26, 2022 | Nugaal | eyl | Godobjiiraan | 0.2 | ICRC | 26/02/2016 | Godobjiiraan BH 2 | — | 7.5105982 | 49.4165263 | 123.0 | — | 2 | — | rural urban | yes | — | Yes | — | — | 1000 | — | 1500 | 0.0 | — | 210.0 | pvc | 8.0 | — | 12.0 | 2.0 | — | 1.3 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 28.0 | Galvanised Steel | 150.0 | — | 1 | 2 | no | — | — | Submersible Pump | — | 15.0 | 150.0 | Hybrid - Solar/Generator | Parkins | 35.0 | YL365D_36b | 25.5 | fair | — | yes | Colorless and odorless | 32.6 | 7.33 | 5790.0 | 3879.3 | — | Communal | yes | 26/02/2016 | 7 | 0 | yes | — | yes | — | — | — | Oxfam UK | 26/02/2018 | Construction of two latrines | 1. Water is so hard, this borehole needs Water treatment/ drilling new borehole. 2. Construction of new kiosks. | — | — |
7102 | — | Borehole | Puntland Ministry of Energy Minerals and Water | Feb. 28, 2022 | Mudug | jariban | Towfiiq | 0.3 | — | 28/02/2016 | Towfiq BH 1 | — | 6.6137593 | 48.8710917 | 3.0 | — | 2 | — | rural urban | yes | — | Yes | — | 14000 | 10000 | 800 | 15000 | 0.0 | — | 84.0 | pvc | 8.0 | — | 12.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 30.0 | Galvanised Steel | 1500.0 | 2000 | 8 | 2 | yes | 16 | 96.0 | Submersible Pump | — | 11.0 | 72.0 | Generator | Parkins | 45.0 | — | — | fair | Extension of animal thoughts | yes | Colorless and odorless | 29.8 | 7.13 | 6450.0 | 3130.0 | — | Communal | yes | 28/02/2016 | 3 | 2 | yes | 0.05 | yes | — | — | — | CARE Somalia | 28/12/2021 | 1.Construction of elevated water tank 2. Construction of caretaker room. | 1. Installation of solar power 2. Construction of animal thoughts 3. Construction of new generator room 4. Rehabilitation of elevated water tank. 5. Extension of pipelines systems. | — | — |
8761 | — | Borehole | FGS Ministry of Energy and Water Resources | April 18, 2022 | Bay | qansax_dheere | Bulojadiid | 6.0 | Agency not specified | — | Duuray | — | 2.83075 | 42.932952 | — | — | — | — | rural | yes | — | No | Tech breakdown | — | — | — | — | 1.0 | — | — | pvc | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | poor | — | no | — | — | — | — | — | — | Communal | yes | — | 5 | 2 | no | — | no | — | — | — | — | — | — | Rehabilitation | — | — |
7105 | — | Borehole | FGS Ministry of Energy and Water Resources | March 22, 2022 | Hiraan | beled_weyne | Matabaan hiiraan Somalia | — | Community | 10/03/1993 | Matabaan borehole | — | 5.199647 | 45.520296 | — | — | 4 | — | urban | yes | — | Yes | — | 7000 | — | — | — | — | — | 160.0 | pvc | 10.0 | 60.0 | 8.0 | 12.0 | 9.0 | 1.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 29.0 | PVC | 200.0 | 1000 | 2 | 3 | yes | 20 | 25.0 | Submersible Pump | Lowara submersible pump | 8.0 | 60.0 | Generator | Eveka generator | 30.0 | — | — | good | Need an other elevator water tank | no | — | — | — | — | — | — | Utility/Local Authority | — | — | — | — | yes | 0.15 | yes | — | — | — | Community | 18-Nov-09 | Rehabilitation pump | Rehabilitation | — | — |
7278 | — | Borehole | Galmudug Ministry of Energy and Water Resources | March 24, 2022 | Galgaduud | cadaado | Godinlabe | 0.3 | — | 24/03/2022 | Godinlabe -dalbile | — | 5.8919631 | 46.628455 | 291.0 | — | 0 | — | rural urban | yes | — | Yes | — | 5800 | 252 | 80 | 48000 | — | — | 185.0 | pvc | 6.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 100.0 | Galvanised Steel | 80.0 | 750 | 1 | 1 | yes | 5 | 9.0 | — | — | — | — | — | — | — | — | — | fair | Small water tanks | no | — | 29.0 | 7.09 | 3420.0 | 1705.0 | — | Private/Individual | — | — | — | — | yes | 0.01 | yes | — | — | — | NRC | One Small Water | — | — | — | — |
7126 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 1, 2022 | Togdheer | buuhoodle | Buuhoodle | — | — | 08/04/2015 | Qurax BH | — | 8.2553215 | 46.3195529 | 647.0 | — | 2 | — | urban rural | yes | — | Yes | — | 1800 | 1500 | 450 | 2500 | 0.0 | — | 370.0 | pvc | 8.0 | — | 14.0 | 12.0 | — | 2.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 50.0 | PVC | 800.0 | — | 4 | 2 | yes | 12 | 5.0 | Submersible Pump | Lowara | 18.5 | 350.0 | Hybrid - Solar/Generator | Parkins | 60.0 | — | — | fair | — | no | — | — | — | — | — | — | Private/Individual | — | — | — | — | yes | 0.1 | yes | — | — | — | — | — | — | 1. Rehabilitation of pipelines 2. Rehabilitation koisks | — | — |
7107 | — | Borehole | Puntland Ministry of Energy Minerals and Water | April 13, 2022 | Sanaag | laasqoray | Dhahar | 0.2 | UNICEF | 01/01/2005 | Dhahar public borehole | — | 9.7471447 | 48.8243602 | 892.0 | — | 2 | — | rural urban | yes | — | Yes | — | 5000 | 10000 | — | 30000 | — | — | 220.0 | pvc | 8.0 | — | 12.0 | 24.0 | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | — | Concrete/Masonry tank | 60.0 | Galvanised Steel | 100.0 | — | 1 | 4 | yes | 40 | 8.0 | Submersible Pump | Grundfos | — | 190.0 | Hybrid - Solar/Generator | Perkins | 60.0 | JCNS-M36V300W | 22.5 | poor | Main raising pipes are rusted and the submersible pump is weakly pumping | no | — | 32.6 | 6.6 | 2500.0 | 1250.0 | — | Communal | — | — | — | — | yes | 0.025 | yes | — | — | — | UNICEF | 01/01/2019 | Provided Solar system Changed the main raising pipes | 1:Larger capacity of water storage 2:22KW inverter 3: Replacement of main raising pipes 4: and submersible pump 5: Pipeline Rehabilitation. | — | — |
SWALIM is a multi-donor project managed by FAO and currently funded by The European Union, USAID, SDC, FCDO and Government of France